IR 05000334/1998006
| ML20196J305 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 12/04/1998 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20196J282 | List: |
| References | |
| 50-334-98-06, 50-334-98-6, 50-412-98-06, 50-412-98-6, NUDOCS 9812100019 | |
| Download: ML20196J305 (2) | |
Text
l
.
l
INSPECTION PROCEDURES USED IP 37551:
Onsite Engineering j
IP 62707:
Maintenance Observation IP 71707:
Plant Operations IP 83750:
Occupational Radiation Exposure IP 86750:
Solid Radioactive Waste Management and Transportation of Radioactive Waste IP 90712:
In-Office Review of Written Reports of Nonroutine Events at Power Reactor Facilities IP 92700:
Onsite Follow-up of Written Reports of Nonroutine Events at Power Reactor Facilities IP 92901:
Follow-up - Operations IP 92903:
Follow-up - Engineering IP 93702:
Prompt Onsite Response to Events at Operating Power Reactors ITEMS OPENED, CLOSED AND DISCUSSED Onened and Closed 50-334/98-06-01 NCV Non-Safety Related Mechanical Seal Assembly installed in Quench Spray Pump 'A' 2OSS-P21 A-Reference LER 50-412-98-10 (Section E8.6)
50-412/98-06-02 NCV GL 96-01 Issues, Inadequate TS Testing (Section E8.7)
(Also EA 98-525)
50-412/98-06-03 NCV inadequate Design Control of the Hydrogen Recombiners - Reference LER 50-412/98-11 (Section E8.8)
l Closed 50-334/97-11-02 VIO Failure of Operators to Log TS LCO Entries and Perform Proper Shift Turnover (Section 08.3)
50-334/97-38-01 LER Unsealed Penetration in Main Steam Valve Cubicle Floor (Section M8.1)
50-334/98-16 LER Missing Fire / Flood Sealin Main Steam Valve Room Shakespace (Section M8.2)
50-412/98-06 LER Reactor Protection System Actuation - Bypass Breaker l
Trip During 2 MSP-1.14A (Section M8.3)
9812100019 981204 PDR ADOCK 05000334 G
pop l
l
.
.
I
1 (
50-334/97-33 LER Potential for Nuclear Instrumentation System Supply Voltage to be Outside Design Requirements (Section E8.1)
50-334/97-35 &
LER Small Bore Piping Support Design Deficiencies 50-334/97-35-01 (Section E8.2)
50-334/97-39 LER Gas accumulation in Charging /High Head Safety injection Pump (Section E8.3)
50-412/97-08-01 LER Failure to Meet Single Active Failure Criteria for Control Room Emergency Ventilation System Results in Entry into TS 3.0.3 (Section E8.4)
50-412/97-10 LER Lack of Electricalisolation in the Unit 2 Emergency Diesel Generator Room Ventilation System Temperature Control Circuits (Section E8.5)
50-412/98-10 LER Non-Safety Related Mechanical Seal Assembly Installed in Quench Spray Pump 'A' 2OSS-P21 A-Reference NCV 50-412/98-06-01 (Section E8.6)
50-412/96-03-00and LER Generic Letter 96-01 Inadequate Testing of Safety 50-412/96-03-01 Related Logic - Reference NCV 50-412/98-06-02 (Section E8.7)
50-412/97-07 LER Generic Letter 96-01 - Inadequate Routine Surveillance Testing of the Power Range, Neutron Flux High Positive Rate Reactor Trip Function - Reference NCV 50-412/98-06-02 (Section E8.7)
50-412/98-08-00; LER Generic Letter 96-01 - Technical Specification 50-412/98-08-01; Instrumentation Surveillance inadequacies - Reference 50-412/98-08-02:and NCV 50-412/98-06-02(Section E8.7)
50-412/98-08-03 50-412/98-11 LER Cross-Connect Piping Installed Between Suction Lines of Hydrogen Recombiners - Reference NCV 50-412/98-06-03 (Section E8.8)
l l
!
I