| | Start date | Site | Title |
|---|
| IR 05000373/2025004 | 13 February 2026 | LaSalle | County Station - Integrated Inspection Report 05000373/2025004 and 05000374/2025004 |
| IR 05000333/2025004 | 2 February 2026 | FitzPatrick | Integrated Inspection Report 05000333/2025004 |
| IR 05000315/2025003 | 29 December 2025 | Cook | Integrated Inspection Report 05000315/2025003 and 05000316/2025003 |
| IR 05000373/2025003 | 15 December 2025 | LaSalle | County Station - Integrated Inspection Report 05000373/2025003; 05000374/2025003 07200070/2025001 and Exercise of Enforcement Discretion |
| 05000446/LER-2025-003, Failure of Turbine Electrohydraulic Control System Results in Manual Trip of Unit 2 and Actuation of the Auxiliary Feedwater System | 13 November 2025 | Comanche Peak | Failure of Turbine Electrohydraulic Control System Results in Manual Trip of Unit 2 and Actuation of the Auxiliary Feedwater System |
| RS-25-145, Radiological Emergency Plan Addendum Revision. Includes EP-AA-1003, Addendum 3, Revision 9, Emergency Action Levels for Clinton Station | 23 October 2025 | Clinton | Radiological Emergency Plan Addendum Revision. Includes EP-AA-1003, Addendum 3, Revision 9, Emergency Action Levels for Clinton Station |
| ML25290A106 | 13 October 2025 | Susquehanna | Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Appendix 15a, Nuclear Safety Operational Analysis (Nsoa) - (a System-Level/Qualitative Type Plant FMEA) |
| ML25290A103 | 13 October 2025 | Susquehanna | Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.2, Increase in Reactor Pressure |
| ENS 57928 | 13 September 2025 21:04:00 | Hatch | Manual Reactor Scram |
| IR 05000373/2025002 | 11 August 2025 | LaSalle | County Station Integrated Inspection Report 05000373/2025002 and 05000374/2025002 |