Forwards Explanation of Errors in 890707 Application Re Corrective Action Plan & Advises That Errors Do Not Affect Technical Basis on Which Exemption Granted.Util Corrective Action Plan Remains Unchanged
ML20012C719
Person / Time
Site: Pilgrim
Issue date: 03/14/1990
From: Bird R
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BECO-90-038, BECO-90-38, NUDOCS 9003230113
Download: ML20012C719 (13)


Text

- - -

U w 10CFR 50' Appendix-J. j k] s

. h-10CFR50.12(a) .]

% l- mm Pilgrim Nuclear Power station Rocky Hill Road Plymouth, Massachusetts 02360 l l

Ralph G. Bird C BECo 90-038 4 . seni r Vice President - Nuclear March 14, 1990 :I i

U.S. Nuclear Regulatory Commission I Document Control Desk J Washington, DC 20555 )

License DPR-35 1 Docket 50-293 NRC APPROVED EXEMPTIONS TO 10CFR50 APPENDIX J DATED SEPTEMBER 27. 1989 Boston Edison is considering a postponement of our Refueling Outage #8 from March to October 1991. While evaluating the impact of such a postponement on l

.the-Exemption to 10CFR50 Appendix J (NRC Letter dated 9/27/89), we discovered two inadvertent errors in our original application (BECo letter 7/7/89).

J.These errors are in the Corrertive Action Plan and involve the dates that ,

testing was performed. The attachments to this letter provide an explanation of the problems discovered. ,

We' do not believe.that these errors affect the technical basis on which the exemptions were granted, because the total number of Local Leak Rate Tests performed during and after Refueling Outage #7 exceeds the requirements of 10CFR50 Appendix J. Also, our Corrective Action Plan remains unchanged. If we decide to postpone the next refueling outage we will~ send a separate-letter notifying you of the impact on the exemption.

If you have any questions or comments, please notify our Licensing Division Manager, Mr. John S. Dietrich at (617) 849-8948. Unless we hear otherwise, 2 our ILRT and LLRT. test schedules for our present maintenance outage and RF0 #8 .

will be based on the Corrective Action Plan that accompanied our exemption application.

G MTL/jcp/4156 Attachments cc: See next page

..9003230113 900314 l DR p ADOCK 05000293 i PDC ,  ;

Ol l I

4

\ l{

E f

4 f , ~ - - -

'g- .

a, - ,

p

. BOSTON EDISON COMPANY l

-'-

  • March 14,-1990 l U. S. Nuclear Regulatory Coinmission Page 2 l 1
l l

cc: Mr. M. Fairtile, Project Manager Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Mail Stop: 14DI.

U.-S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 02852 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road L Kirs of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station E

e

. . }

1 6113chment 1

References:

- 1. BECo Applicatioc. $ .mrtion dated 7/7/89, Attachment B i

" Corrective Ac' '  ;

2. BECo "Additioni' . mation - Request for Exemption" dated 9/1/89 j
3. NRC Approved Exemption dated 9/27/89 Nhile reviewing the approved exemption we identified two incorrect statements which were the result of our application (Reference 1) and our letter notifying you of-the date change of our maintenance outage (Reference 2).

The first statement "Since the failure of the December 1987 ILRT... nearly two complete sets of LLRTs were performed... They were performed in the June and December 1988 timeframes" appears on page 2 of Reference 1 and is paraphrased on page 3 of the Safety Evaluation Report in Reference 3.

This statement is in error. While many Type C Tests were performed twice during this timeframe, overall, we only performed I full set of LLRTs and some additional tests.

He performed approximately 3 full sets of LLRT's during RF0 #7 with 2 _

l' exceptions:. a Type B Test - Drywell Head Access Hatch, and a Type C Test -  !

E Standby Liquid Control Valve 1101-16. Two of these sets were performed prior L to the Integrated Leak Rate Test (ILRT) and one was performed after the ILRT but prior.to st wtup.

L The second statement "BECo plar.s to complete approximately five sets of p LLRTs... during the four-year period from June 1987 to June 1991" appears on l page 3 of Reference 1, in Reference 2 (the word "approximately" was l inadvertently omitted), and in Reference 3 on page 3 of the Exemption (again with the word "approximately" omitted).

o l -- The correct wording should have been "approximately 5 full sets of LLRTs...

! during the five-year period from June 1986 to June 1991". The history of L LLRTs completed since the start of RF0 #7 is provided in Attachment 2 and is L summarized below:

1. He performed approximately 1 complete set in 1986. The following L are the exceptions

L

  • Type B Test - Drywell Head Access Hatch not performed
  • Type C Tests - MSIV A0-203-1A/B & 2A/B performed 5/86

- RHR Suction Valves H0-1001-47 & 50 not performed *

- Instrument Air 31-CK-167 not performed *

- RBCCH Supply 30-CK-432 not performed *

- RBCCH Return HO-4002 not performed *

- SBLC 1101-16 not performed

- RHR H0-1001-28B & 29B performed 4/86

- Air to Torus Vac Breakers CV-5046 not performed *

- Air to Torus Vac Breakers 31-N-434 not performed *

(* were tested three times in RF0 #7)

2. He performed a second complete set of tests in 1987.

Page 1 of 2

. ?

3. He performed a third complete set of.LLRT's in 1988 (many tests were performed twice).
4. From startup (Jan. 1989) through the end of the present maintenante outage we will have completed a fourth set of LLRT's.(except for those tests covered by the September 1989 exemption).
5. During RF0 #8 we will complete a fifth set of LLRT's.

He believe these errors do not affect the basis for the exemption approval since the. intent of these two statements was to demonstrate that we exceeded

~

the number of LLRTs required-by 10CFR50 Appendix J. He clearly have exceeded

(_ these requirements.

Attachment 2 contains a listing of all successful LLRTs performed from 4/86 to 2/90. This listing is provided for your information to aid in understanding the history of tests discussed above.

s.

L K

1

-s Page 2 of 2 i

x s -

=

Lctt:r Attachment 2.

l _

Pilarim Nuclear ' Power Station

!- Successful Local Leak Rate Tests ~

l '.

l Pre-ILRT Post ILRT/ Pre-Startun Schedula:1 Tests i Pont # ' Description Set 1 Set 2 Set 3 Set 4 - 3/90 M/O RFO #8 6/27/86- 6/10/87 6/13/88 5/7/89 no Note 2 N/A Gibs Manway @ 0 -

N/A Gbs Marway @ 45 6/27/86 6/10/87. 6/13/88 -

5/7/89 no . Note 2 ?

N/A Gbs Manway @ 90 6/27/86 6/10/87 6/13/88 -

5/7/89 no . Note 2 ~

N/A Gbs Marway @ 135 6/27/86 -6/10/87 6/13/88 -

5/7/89 no .. Note 2 N/A. Gbs Marway @ 180 6/27/86 6/10/87 6/13/88' -

5/7/89 r.0 Note 2 :

L N/A Gbs Marway @ 225 6/27/86 6/10/87 6/13/88 -

5/7/89 - no Note 2 -

N/A Gbs Marway @ 270 6/27/86 6/10/87 6/13/88 -

5/7/89 no Note 2 g N/A Gbs Marway @ 315 6/27/86 6/10/87 6/13/88 -

Si7/89 no Note 2 N/A DrywellHead 11/23/86 12/16/87 11/30/88 - -

no - Note 1 Ncie 2 001 Equipment Hatch 6/26/86 10/7/87 6/6/88 -

5/6/89 no ' Note 2 002 Airlock inner Door Seals . Note 3 Note 3 Note 3 Note 3 Note 3 yes Note 2 002 Airlock Outer Door Seals Note 3 Note 3 Note 3 Note 3 Note 3 yes Note 2 004 DrywellHead Access Hatch -

8/31/87 11/29/88 - -

no - Note 1 . Note 2 '-

COB CRD RemovalHatch 12/1/86 9/30/87 9/9/88 - -

yes Note 2 '

025 Inboard Flange AO-5044A 7/11/86 3/9/87 9/13/88 - -

yes Note 2 025 inboard Flange AO-5044B 7/11/86 3/9/87 9/13/88 - -

yes Note 2 025 Outboard Flange AO-5044B 8/12/86 3/9/87 9/13/88 - -

yes Note 2.

026 Inboard Flange AO-5035A 6/24/86 3/5/87 9/12/88 - -

yes Note 2 026 Inboard Flange AO-5035B 6/24/86 3/5/87 9/12/88 - -

yes ' Note 2 026 Outboard Flange AO-5035A 6/24/86 3/5/87 9/12/88 - -

yes' Note 2 035A TIP Drive Flange (Inner) 6/30/86 6/8/87 9/7/88 - -

yes Note 2 035A TIP Drive Flange (Outer) 6/30/86 6/8/87 9/7/88 - -

yes Note 2 035B TIP Drive Flange (Inner) 6/30/86 6/8/87 9/7/88 - -

yes Note 2 035B TIP Drive Flange (Outer) 6/30/86 6/8/87 9/7/88 - -

yes Nw 't 035C TIP Drive Flange (Inner) 6/30/86 6/8/87 9/7/88 - -

yes Note 2 035C TIP Drive Flange (Outer) 6/30;d3 6/8/87 9/7/88 - -

yes Note 2 Note 1: Approved Exemption dated SeptembeE 989

- Note 2: Will be tested in RFO #8 N6te 3: Tested in accordance with 10CFR50 Apg -& I.lil.D.2.b and PNPS Technical Specifications Page 1 of 9

~ ,,m,, w w w r- , p --

.J- e- ~ ,g.a

m w

Lctter Attachment 2 Pilgrim Nucle a_ r Power Station Successful Local Leak Rate Tests Pre-ILRT Post ILRT/ Pre-Startuo Scheduled Tests Pont # Description Set 1 Set 2 Set 3 Set 4 3!90 M/O RFO #8 035D TIP Drive Flange (Inner) 6/30/86 6/8/87 bi;/88 - -

yes Note 2 ,

035D ' TIP Drive Flange (Outer) 6/30/86 6/8/87 9/7/88 -- -

yes Note 2 .

035E TIP Drive Flange (Inner) 6/30/86 6/8/87 9/7/88 - -

yes Note 2 035E TIP Drive Flange (Outer) '6/30/86 6/8/87 9/7/88 -

.- yes Note 2 043 Drywell Test Connection Flange 7/14/86 3/4/87 9/9/88 -

5/9/89 no Note 2 -

047 ILRT Supplemental Conn. Flange 7/21/86 6/17/87 9/13/88 -

5/10/09 no Note 2 200A . Torus Access Hatch (East) 7/24/86 12/20/87 10/3/88 - -

yes Note 2 2008 Torus Access Hatch (North) 7/21/86 12/17/87 11/18/88 -

7/20/89 no Note 2 205 Inboard Flange AO-5036B 6/24/86 3/5/87 9/12/88 - -

yes . Note 2 205 Inboard Flange AO-5036A 6/24/86 3/5/87 9/12/88 - -

yes Note 2 205 Outboard Flange AO-5036A 6/24/86 3/5/87 9/12/88 - -

yes Note 2 .

223 HPCI Steam to Torus (Inbd. Flange) 7/16/86 10/15/87 10/3/88 - -

yes Note 2 223 HPCI Stcam to Torus (Outbd. Fing) 7/16/86 10/15/87 10/3/88 - -

yes Note 2 223 2301-74 Inboard Flange 7/16/86 10/16/87 9/16/88 - -

yes Note 2 223 2301-74 Outboard Flange 7/16/86 10/16/87 9/16/88 - -

yes Note 2 225 1301-64 Inboard Flange 7/15/86 7/29/87 12/9/88 -

10/17/89 no Note 2 -

225 1301-64 Outboard Flange 7/15/86 7/28/87 - 12/9/88 -

10/17/89 no Note 2 225 RCIC Steam to Torus (Inbd. Flange) 7/15/86 8/10/87 12/9/88 -

10/17/89 no Note 2 225 RCIC Steam to Torus (Outbd. Fing) 7/15/86 8/10/87 12/9/88 - 10;17/89 no ' Note 2 I

227 inboard Flange AO-5040A S/30/89 3/11/87 9/9/88 - -

yes Note 2 i

227 Outboard Flange AO-5040A 6/30/86 3/11/87 9/9/88 - -

yes Note 2 227 inboard Flange AO-5040B 6/30/86 3/11/87 9/9/88 - -

yes Note 2 ,

227 Outboard Flange AO-50408 6/30/86 3/11/87 9/9/88 - -

yes Note 2 227 inboard Flange AO-5042A 6/30/86 4/7/87 9/16/88 - -

yes Note 2 227 inboard Flange AO-50428 6/30/86 4/7/87- 9/16/88 - -

yes Note 2 227 Outboard Flange AO-5042B 6/30/86 4/7/87 9/16/88 - -

yes Note 2 Note 1: Approved Exemption dated September 27,1989

- Note 2: Will be tested in RFO #8 Page 2 of 9

~

Nota 3: Tested in accordance with 10CFR50 Appendix J.lll.D.2.b and PNPS Techriical Specifications

-9 , -

.p,, .4.- -

9 -%Ay y ,,y 3 prp.,.

= -

3

~

2

. Lett::r Attachment 2 u Pilarim Nuclear Power Station Successful Local Leak Rate Tests Pre-ILRT Post ILRT/ Pre-Startun Scheduled Tests 1 Pent # Description ' Set 1 het 2 Set 3 Set 4 3/90 M/O ' RFO 88 ~

57 . Outboard Flange AO-5025 New 10/29/87 10/14/88 -

-~ .yes Note 2 6/30/86 9/7/88 Note 2

~

227A Flange of X-212A Seat 12/11/87- - -

yes 227B Flange of X-2128 Seat . 6/30/86 4/7/87 9/7/88 - -

yes- Note 2 ^

" 230 Torus Test Connection Flange 7/22/06 10/1/87 11/18/88 -

7/20/89 no Note 2 002 Airlock Integrated Test Note 3 Note 3 Note 3 Note 3 Note 3 yes Note 2

'007A Main Steam 6/24/86 3/2/87- 8/19/88 - -

yes Note 2 007B Main Steam 6/24/86 2/27/87 8/19/88: - -

~yes Note 2 007C Main Steam 6/24/86 2/27/87 8/19/88 - -

yes Note 2 '

007D Main Steam 6/24/86 2/27/87 8/19/88 - -

yes Note 2 '

008 Main Steam Drain 6/24/86 2/27/87 8/19/88 - -

yes Note 2 ~

009A Feedwater 6/23/86 2/27/87 8/19/88 - -

yes Note 2

'0098 Feedwater 6/23/86 2/27/87 8/19/88 - -

yes_ Note 2 012 RHR Suction From Recirc 7/3/86 3/4/87 8/23/88 -

'yes Note 2 014 Cleanup Supply 6/26/86 3/6/87' 8/24/88 - -

yes Note 2 016A Core Spray 6/26/86 3/6/87 8/24/88 - -

yes Note 2 '

0168 Core Spray 6/26/86 3/6/87 8/24/88 - -. yes ~ Note 2 017 Rx Vessel Head Spray 7/9/86 3/9/87 8/31/88 -

5/11/89 .no Note 2 051A RHR Retum to Recirc 7/3/86 3/4/87 8/23/88 '- -

yes - Note 2 051E RHR Retum to Recirc 7/2/86 3/3/87 8/22/88 - -

yes Note 2 052 HPCI Steam to Tuithe 7/2/86 3/3/87 8/22/88 - -

yes Note 2 '

053 RCIC Steam to Turbine 7/3/86 3/2/87 8/19/88 - -

yes Note 2 100A Neutron Monitoring 8/11/86 2/24/87 12/14/88 - -

yes - Note 2.

1008 Neutron Monitoring 8/11/86 2/24!87 12/14/88 - -

yes Note 2 100C Neutron Monitoring 7/14/86 2/25/87 12/9/88 - -

yes- Note 2 -

100D Neutron Monitoring 7/14/86 2/25/87 12/12/88 - -

yes Note 2 100E Neutron Monitoring 7/8/86 2/26/87 12/8/88 - -

yes Note 2 Note 1: Approved Exemption dated September 27,1989

-Note 2: Will be tested in RFO #8 Nola 3: Tested in accordance with 10CFR50 Appendix J.lli.D.2.b and PNFS Technical Specifications . Page 3 of 9 Y-

" + ~ -

_ __ '_-_______m+t._______s_ _ _ __._._m________a_=_____.___a____-s e=1_.a. A2.--__._.__W

.m _

1 j ~

.= =

Letter Attachment 24 Pilarim Nuclear Power Station Successful Local Leak Rate Tests Pro-ILHT Post ILRT/ Pre-Startuo Scheduled Tests  ;

Set 2 Set 3 Set 4 3/90 RS/O RFO 88' '

Pont # Description ' Set 1 8/11/86'- 2/24/87 12/14/83 - - yes - Note 2 -

101 A - Electrical 8/12/86 2/24/87 12/14/88 -

yes Note 2

'101B Electrical 7/9/86 3/3/87 12/7/88 ' - -

yes . Note 2 101C Electrical 7/14/86 2/25/87 12/12/88 - -

yes Note 2 102A -Electrical 7/8/86 2/26/87 12/8/88 - - yes Note 2 102B Electrical 7/14/86 2/25/87 12/12/88 - - yes Note 2 103A Electrical 7/8/86 2/26/87 12/8/88 - - yes Note 2 103B Electrical 7/8/86 2/26/87 12/8/88 - - yes Note 2

-104A CRD Position 7/8/86 2/26/87 12/8/88 - -

yes Note 2.

104B CRD Position 7/8/86 2/26/87 12/8/88 - -

yes Note 2 104C CRD Position 8/11/86 2/24/87 12/14/88 - - yes Note 2 704D CRD Position 8/11/86 2/24/87 12/14/88 - -

yes Note 2 104E CRD Position 8/11/86 2/24/87 12/14/88 - -

yes Note 2 104F CRD Position 7/14/86 2/25/87 12/9/88 - -

yes Note 2 104G CRD Position 7/14/86 2/26/87 12/12/88 - - yes Note 2 104H CRD Position 7/14/86 2/25/87 12/9/88 - - yes . Note 2 104J CRD Position 7/8/86 2/26/87 12/8/88 - -

yes Note 2 105A Electrical 7/14/86 2/25/87 12/9/88 - -

yes Note 2.

105B Electrical 8/11/86 2/24/87 12/14/88 - - yes- Note 2 106B Drywell Humidity and Temp 7/14/86 3/5/87 8/23/88 - - yes Note 2 201A Vent Une 7/3/86 3/9/87 8/23/88 - - yes Note 2 201B Vent Line 7/3/86 3/4/87 8/23d8 - -

yes Note 2 201C Vent Une 7/3/86 3/4/87 8/23/88- - -

yes Note 2 201D Vent Line 7/2/86 3/4/87 8/19/88 - - yes Note 21 201E Vent Line 7/2/86- 3/3/87 8/19/88- - - yes Note 2 201F Vent Line 7/2/86 3/3/87 8/22/88 - - yes Note 2 201G Vent Une Note if Approved Exemption dated September 27,1989 Note 2: Will be tested in RFO #8 .

Page 4 of 9 .

Note 3: Tested in accordance with 10CFR50 Appendix J.lli.D.2.b and PNPS Technical Specirmations

--'----::..;';.,,-,cf, -..,,..,..,s.,,,.,,,,,,,,,

iu r m. si -<-,r. 1a. e - - - - - --- ' = - ,,. ';---ccy-

a--,c, ,,,,,;'l - ,

n---- i--- . * -..-- . ----

. . - _ _ _ _ _ . _ _ *r- - - . -- -

= Lett:r Attachment 2-Pilorim Nuclear Power Station Successful Local Leak Rate Tests

' Pre-lLRT Post ILRT/ Pre-Startun Scheduled Tests Pont # Description ,

Set 1 Set 2 Set 3 Set 4 3/90 M/O RFO 88 201 H . Vent Line 7/2/86 3/3/87- 8/22/88 - --

yes Note 2 -

202A Electrical .7/24/86 -4/17/87 11/17/88 - -

.yes Note 2 202B Electrical 7/23/86 4/17/87 11/18/88 -

7/21/89 no Note 2 007A Main Steam AO-203-1 A 5/23/86 7/"3,87 5/31/88 - -

yes Note 2 007A Main Steam AO-203-2A 5/23/86 7/15/87 5/31/88 - -

yes Note 2 0078 Main Steam AO-203-18 5/24/86 7/14/87 6/1/88 - -

yes Note 2 007B Main Steam AO-203-2B 5/24/86 7/14/87 6/1/88 - -

yes ' Note 2 !

007C Main Steam AO-203-1C 6/2/86 7/15/87 6/US8 - -

'yes Note 2 007C Main Steam AO-203-2C 6/2/86 7/15/87 6/1/88 - -

yes Note 2 007D Main Steam AO-203-1 D 6/4/86 7/15/87 6/1/88 - -

yes . Note 2 007D Main Steam AO-203-2D 6/4/86 7/15/87 6/1/88 - -

yes Note 2 008 - Main Steam Drain MO-220-182 6/25/86 10/2/87 6/8/88 -

5/6/89 1-no 2-yes Note 2 ,

009A Feedwater Inboard Check 6-58A 6/30/86 6/1/87 6/9/88 - -

yes Note 2 009A Cleanup System Retum MO-1201-80 7/7/86 8/16/87 6/14/88 12/5/88 5/21/89 no Note 2 009A Feedwater Outboard Check 6-62A 7/1/86 6/9/87 6/10/88 - -

yes Note 2 009A RCIC Pump Descharge MO-1301-49 7/2/86 8/18/07 6/10/88 - -

yes Note 2 009B HPCIPump Discharge MO-2301-8 7/2/86 8/18/87 1/20/88 5/26/88 -

yes Note 2 009B Feedwater Inboard Check 6-58B 6/27/86 5/19/87 6/9/88 - -

yes Note '

009B Feedwater Outboard Check . 6-62B 6/30/86 5/22/87 6/10/88 - -

yes . Note 012 RHR Suction from Recrc. MO-1001-47 - s/12/87 s/14/87 6/21/88 11/28/88 -

no -Note 1 Note 2 012 RHR Suction from Recirc. MO-1001-50 -

8/6/87 6/20/88 11/28/88 -

no -Note 1 " Note 2 014 Cleanup Systeminlet MO-1201-2&5 7/7/86 6/26/87 s/3/87 6/14/88 12/5/88 5/21/89 no Note 2 015E ItO2AnalyzerH SV-5065-358 7/17/86 4/13/87 8/2/88 - -

yes- Note 2 015E IbO!AnalyzerF SV-5065-318 7/17/86 4/13/86 8/2/88 - -

yes . Note 2 016A Core Spray to Rx MO-1400-24A 7/6/86 8/16/87 7/1/88 12/15/88 5/15/89 no Note 2 016A Core Spray to Rx MO-1400-25A 7/6/86 8/16/87 7/1/88 12/15/88 5/15/89 no Note 2 Note 1: Approved Exemption dated September 27,1989

. Note 2: Will be tested in RFO #8 Note 3: Tested in accordance with 10CFR50 Appendix J.lli.D.2.b and PNPS Technical Specifications Page 5 of 9

, u. .~.- - .e- ,4 4 a w.

- Lett:r Attachment 2 Pilarim Nuclear Power Station Successful Local Leak Rate Tests Pre-ILRT Post ILRT/ Pre-Startuo Scheduled Tests Pont # Description Set 1 Set 2 Set 3 Set 4 3/90 RA/O RFO 88 016B Core Spray to Rx MO-1400-24B 7/8/86 7/30/87 7/13/88 12/15/88 5/20/89 no Note 2 0168 Core Spray to Rx MO-1400-25B 7/8/86 7/31/87 7/13/88 12/15/88 5/20/89 no Note 2 017 Rx Head Spray MO-1001-60&63 7/10/86' 10/28/87 5/27/88 -

5/11/89 no . Note 2 018 DrywelFloorSurrp AO-7017A 7/30/86 4/23/87 6/27/88 -12/6/88 -

yes Note 2 018 DryweE FborSurrp AO-7017B 7/30/86 4/23/87 6/27/88 12/6/88 yes Note 2 019 DrywelEquipSump AO-7011 A 7/25/86 10/1/87 11/2/87 6/27/88 12/6/88 -

yes' Note 2 019 DrywelEquipSump AO-7011 B 7/25/86 10/1/87 11/2/s7 6/27/88 12/6/88 -

yes Note 2 022 Inst. Air to Drywell 31-CK-167 -

6/12/87 6/28/88 12/2/88 -

yes Note 2 023 RBCCW Supply 30-CK-432 -

7/26/87 6/17/88 12/19/88 -

no - Note 1 Note 2 024 RBCCW Return MO-4002 -

7/25/87 6/17/88 12/19/88 -

no - Note 1 Note 2 025 DrywelPurge Exhaust AO-5044A/B 8/12/86 3/20/87 .

8/4/88 - -

yes Note 2 025 DrywelPurge Exhaust AO-5043A/B 7/10/86 3/20/87 l ' 8/4/88 - -

yes Note 2 025 Post-Accident Purge & Vent SV-5082A, SV-50818 7/11/86 3/20/87 8/3/88 - -

yes Note 2 025 Post-AccideN Purge & Vent SV-50Pt A. SV-5082B 7/11/86 3/20/87 8/3/88 - -

yes Note 2 -

026 Post-Accident Purge & Vent SV-5086A, SV-50858 7/8/86 3/27/87 8/1/88 - -

yes Note 2

.026 Post-Accident Purge & Vent SV-5085A, SV-5086B 7/8/66 3/27/87 8/1/88 - -

yes Nv.) 2 026 DryweIMakeupGas 9-CK-340 7/7/86 3/27/87 8/1/88 - -

yes Note 2 026 DrywelMakspGas AO-5033A 7/7/86 3/30/87 8/1/88 - -

yes Note 2

026 Drywell Purge inlet AO-50338. AO-5035A/B 7/2/86 4/6/87 8/1/88 -

4/25/89 yes . Note 2 l 029E RQAnalyzer'A' SV-5065-37A 7/7/86 4/14/67 8/17/88 - -

yes Note 2 l 029E ROAnalyzer'A' SV-5065-33A 7/7/86 4/14/87 8/17/88 - -

yes- Note 2 032A C-19 Return b Drywel CV-5065-91 7/23/86 4/24/87 8/10/88 - -

yes Note 2 l

032A C-19 Returnto Drywel CV-5065-92 7/23/86 4/24/87 8/10/88 - -

yes. Note 2 035A TIP ban Valve A 45-300A 7/16/86 6/19/87 7/6/88 - -

yes Note 2 035B TIP ban Valve B 45-3008 7/16/86 6/19/87 7/6/88 - -

yes Note 2 l 0350 TIP BaB Valve C 45-300C 7/16/86 6/19/87 7/6/88 - -

yes Note 2 l

Note 1: Approved Exemption dated September 27,1989

. Nota 2: Will be tested in RFO #8 Nota 3: Tested in accordance with 10CFR50 Appendix J.lll.D.2.b and PNPS Technical Specifications . Page 6 of 9

_ _ _ _ ______._______________-__;______________ _ _ _ _ _ - _ ___a __ __ - - _ - - - u_ < . _ _- _ _- -

_ -t-~ ,-as + - -

6 Lett:;r Attachment 2-Pilarim Nuclear Power Station Successful Local Leak Rete Tests Pre-ILRT Post ILRT/ Pre-Startuo Es_heduled Tests Pent # Description Set 1 Set 2 Set 3 Set 4 3/90 M/O RFO 88 ~

035D TIP BallValve D 45-300D 7/16/26 6/19/87 .7/6/88 - -

yes Note 2 035E TIP System Nitrogen Purge Check 9-CK-353 7/%lP4 6/19/87 7/G/88 - -

yes Note 2 039A Containment Spray MO-1001-23A&26A 7/10/86 8/14/87 6/23/G8 12/1/88 -

yes Note 2 039B Containment Spray MO-1001-23B&268 7/14/86 8/13/87 .6/21/88 - -

yes Note 2 040Aa Jet Pump Sensing Line (PASS) SV-5065-63 7/18/86 4/10/87 7/22/88 -

5/9/89 no Note 2 040Aa Jet Pump Sensing Line (PASS) SV-5065-64 7/18/86 4/10/87 7/22/88 -

5/9/89 no Note 2 040Dc Jet Pump Sensing Line (PASS) SV-5065-85 7/18/86 4/10/87 7/26/88 -

5/9/89 no Nate 2 040Dc Jet Pump Sensing Line (PASS) SV-5065-86 7/18/86 4/10/87 7/26/88 -

5/9/89 no Note 2 041 Recirc Pump *B* Disch. Sample AO-220-44 7/11/86 11/4/87 7/1/88 10/3/88 2/26/89 yes Note 2 041 Recirc Pump *B' Disch. Sample AO-220-45 7/11/86 11/4/87 7/6/88 -

2/26/89 yes Note 2 042 Standby Liquid Control CK-1101-1 S -

6/25/87 7/29/88 - -

yes Note 2 043 DrywellTestConnection 45-HO-106 7/14/86 4/9/87 7/7/88 --

5/9/89 no Note 2 '

046A Recirc Pump Seallnboard Check 262-FO-13A 7/15/86 6/29/87 6/29/88 - -

yes Note 2 046A Recirc Pump SealOutboard Check 262-FO-17A 7/15/86 6/30/87 6/15/88 - -

yes Note 2 0468 Recirc PumpSeallnboard Check 262-FO-138 7/15/86 6/29/87 6/16/88 - -

yes Note 2

.0468 Recirc Pump SealOutboard Check 262-FO-178 7/15/86 6/30/87 6/15/88 - -

yes Note 2 046F H2O2 Analyzer'A' Retum SV-5065-26A 7/18/86 4/8/87 7/22/88 - -

yes Note 2 046F H2O2 Analyzer *A' Retum SV-5065-24A 7/18/86 4/8/87 7/22/88 - -

yes Note 2 047 DrywNITestConnection 45-HO-102 7/14/86 4/20/87 7/8/88 -

5/10/89 no Note 2 047 DrywellTestConnection 45-HO-103 7/14/86 4/20/87 7/8/88 -

5/10/89 no Note 2

, 047 DrywellTest Connedion 45-HO-104 - 7/14/86 4/20/87 7/8/88 -

5/10/89 no Note 2 .

l 047 DrywellTest Connection 45-HO-105 7/14/86 4/20/87 7/8/88 -

5/10/89 no Note 2 050Ad WO!AnalyzerU SV-5065-13B 7/24/86 4/16/87 8/11/88 - -

yes Note 2 050Ad WOzAnalyzerH SV-5065-20B 7/25/86 4/16/87 8/11/88 - -

ye* Note 2 051A RHR Vesselln. MO-1001-28A 6/4/86 8/14/87 -9/8/88 12/1/88 -

yes Note 2 051A RHR Vesselln. MO-1001-29A 7/10/86 8/13/87 6/24/88 12/1/88 -

yes Note 2 Note 1: Approved Exemption dated September 27,1989

. . Nota 2: Will be tested in RFO #8 l N6te 3: Tested in accordance with 10CFR50 Appendix J.lil.D.2.b and PNPS Technical Specifications Page 7 of 9 l

l

' Letter Attachment 2 Pilarim Nuclear Power Station Successful' Local' Leak Rate Tests Pre-ILRT Post ILRT/ Pre-Startuo Scheduled Tests Pont # Description Set 1 Set 2 Set 3 Set 4 3/90 M/O RFO 88 051B RHR Vesselin. MO-1001-28B 4/18/86 8/11/87 9/2/88 - -

yes Note 2 05iB RHR Vesselin. MO-1001-29B 4/18/86 8/12/87 9/27/88 - -

. yes Note 2 052 HPCI Steam to Turb. MO-2301-4&S 7/16/86 9/29/87 3/18/88 12/16/88 2/27/89 yes Note 2 053 RCIC Steam to Turb. MO-1301-16&17 7/15/86 9/22/87 6/23/88 12/16/88 -

yes Note 2 106Ab HaQ Analyzer'A' SV-5065-14A 7/18/86 4/8/87 7/22/88 - -

yes- . Note 2 106Ab HaQ Analyzer *A' SV-5065-21 A 7/18/86 4/8/87 7/22/88 - -

yes Note 2 205 Torus Makeup Gas 9-CK-341 7/7/86 3/27/87 7/29/88 - -

yes Note 2 205 Torus Makeup Gas AO-5033C 7/7/86 9/23/87 8/1/88 9/16/88 -

yes T .-/"e 2 205 Torus Purge inlet AO-5036A/B 7/2/86 4/6/87 8/1/88 - -

yes . , it 205 Post-Accident Purge & Vent SV-5087A, SV-50888 7/8/86 3/27/87 7/29/88 - -

yes Tue2 205 Post-Accident Purge & Vent SV-50878 SV-5088A 7/8/86 3/27/87 7/29/88 - -

yes twte 2 211A RHR to Torus MO-1001-34A&37A 7/10/86 8/14/87 6/23/88 12/1/88 -

yes Note 2 211B RHR to Torus MO-1001-34B&37B 7/14/86 8/12/87 6/22/88 - -

yes Note 2 219 HPCI Vacuum Breaker MO-2301-33 new 10/16/87 5/24/88 - -

yes Note 2 219 HPCI Vacuum Breaker MO-2301-34 new 10/16/87 5/24/88 - -

yes Note 2 223 HPCI Exhaust 2301-74 new new 9/28/88 - -

yes Note 2 223 HPCI Exhaust 2301-45 new new 9/28/88 - -

yes Note 2 223 HPCI Exhaust 2301-218 new new 9/28/88 - -

yes Note 2 223 HPCI Exhatmt CV-9068A new new 9/28/88 - -

yes Note 2 223 HPCI Exhaust CV-9068B new new 9/28/88 - -

yes Note 2 227 Torus Exh. Valve Bypass AO-5041 A/B 7/9/86 9/23/87 7/26/88 - -

yes Note 2 227 Torus Main Exhaust AO-5042A/B 7/9/86 9/21/87 7/26/88 10/17/88 -

yes Note 2 227 Direct Torus Vent AO-5025 new new 10/17/88 - -

yes Note 2 227 Post Accident Purge & Vent SV-5084A, 5083B 7/9/86 4/7/87 7/27/88 - -

yes Note 2 227 Post-Accident Purge & Vent SV-5083A, 5084B 7/9/86 4/7/87 7/27/88 - -

yes Note 2 227A Torus Vac Breakers AO-5040A, X-212A 7/9/86 12/11/87 7/28/88 .- 2/7/89 yes Note 2 Note 1: Approved Exemption dated September 27,1989

- Note 2: Will be tested in RFO #8 Note 3: Tested in accordance with 10CFR50 Appendix J.lli.D.2.b and PNPS Technica: Specifications Page 8 of 9 wrr <% --4=_- _

~

> ~% ^" );;q -

_l f a.

Lett:r Attachment 2:-

Pilarim Nuclear' Power Station , _

Successful Local Leak ' Rate Tests Scheduled Tests Pre 4LRT Post ILRT/ Pre-Startun Pont #- ' Description ~ Set 1 - Set 2 Set 3 Set 4 3/90 M/O RFO 88

.227B Torus Vac Breakers AO-50408, X-212B : 7/9/86 4/7/87 7/29/88: -

2/7/89- -yes Note 21 :

228C RQ Analyzer B' SV-5065-15B -7/23/86 4/21/87 7/14/88 - -- yes Note 2 -

228C ROAnalyzerH SV-5065-228 7/23/86 4/21/87 -7/14/88 - -

yes Note 2

~228E Air to Torus Vac Breakers CV-5046 -

6/12/87-- . 8/16/88 '12/2/88 - .- yes . Note 2 228E Air to Torus Vac Breakers 31-CK-434 - -

.6/12/87 8/16/88 12/2/88 -

yes Note 2 l 228G Gas Sample Retum (PASS) SV 5065-77 7/23/86 10/7/87 8/9/88 -

7/19/89- no Note 2 228G Gas Sample Retum (PASS) SV-5065-78 7/23/86 10/7/87 8/S!88 -

7/19/89 no Note 2 228H Gas Sample Retum (PASS) SV-5065-71 7/23/86 ~ 4/15/87 8/9/88 -

. 7/19/89. no Note 2 -

228H Gas Sample Retum(PASS) SV-5065-72 7/23/86 4/15/87 8/9/88 -

7/19/89 no Note 2 :

.228J RQAnalyzer*A' SV-5065-11 A 7/23/86 ' 4/21/E7 : 7/15/88 -

7/20/89 no Note 2 228* WQ Analyzer *A* SV-5065-18A 7/23/86 4/21/87 7/15/88 -

7/20/89 -no Note 2 .

228K RQAnalyzerH SV-5065-258 7/23/86 4/17/87 7/12/88 -

7/20/89 no Note 2 228K RQAnalyzer B' SV-5065-278 7/23/86 4/17/87 7/12/88 -

7/20/89' -no Note 2 4

Note 1: Approved Exemption dated September 27,1989 s Note 2: Wdi be tested in RFO #8

' Nota 3: Tested in accordance with 10CFR50 Appendix J.lli.D.22 9nd PNPS Techncal Specircations Page 9 of 9

. . - .- . w , .y ., , . ,