IR 05000413/1984106

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Repts 50-413/84-106 & 50-414/84-48.Corrective Actions Will Be Examined During Future Insp
ML20127F582
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 04/09/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20127F586 List:
References
NUDOCS 8505200515
Download: ML20127F582 (1)


Text

- - .

ggg i

.

.

APR 091985 Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church. Street Charlotte, NC 28242 SUBJECT: REPORT NOS. 50-413/84-106-and 50-414/84-48 Thank you for your response of March 29, 1985, to our Notice of Violation issued on March 1,1985, concerning activities conducted at your Catawba facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We. will examine the implementation of your corrective actions during future' inspection We appreciate your cooperation in this matte

Sincerely, l h h d RRE.ll M Roger D. Walker, Director Division of Reactor Projects cc: R. L. Dick, Vice President -

Construction J. W. Hampton, Station Manager bec: NRC Resident Inspector Document Control Desk State of South Carolina G. Johnson, ELD i;4 8505200515 850409 gDR ADOCK 05000413 PDR

.

RII .

RII RI C rger:jk hh HCdance VBrownlee 4/f"/85 4/f/85 4/$ /85 g