Mr. G. R. Pet:rson
(, Sita Vice PrIsid nt Catawba Nuclear Station Duke Energy Cerporation E OE E 4800 Concord Road York, South Carolina 29745-9635
SUBJECT:
L CATAWBA NUCLEAR STATION, UNITS 1 AND 2 RE: OPERATOR LICENSING
' REQUALIFICATION PROGRAM SCHEDULE CHANGE (TAC NOS MA5890 AND MA5891)
Dear Mr. Peterson:
By [[letter::05000413/LER-1999-007, :on 990426,operation Prohibited by TS 3.4.7 Was Noted Due to Inoperable Train of Rhr.Caused by Inadequate Work Sequencing.Returned B Train RHR to Operable Status by Restoring Power to Valve 1NI136B|letter dated May 26,1999]], you requested NRC approval to change the schedule of the current two-year requalification training program. This change will allow you to schedule requalification examinations 'n non-outage dates. The current Catawba licensed operator requalification training program cycle started January 1,1999, and is scheduled to end December 31,2000. You proposed an attemate ending date of September 30,2000, to shorten the current cycle.
Title 10 of the Code of Federal Reaulation_g (10 CFR) Section 55.59(a)(1) specifies that such
.requalification program."not to exceed 24 months in duration." You have provided sufficient information to demonstrate conformance with the regulations goveming licensed operator requalification requirements. Therefore, we approve the requested schedule change. The next two-year cycle will start on October 1, 2000, and will end on September 30, 2002. Subsequent two-year cycles will also begin on October 1 and end on September 30.
Sincerely, Y s' o%s(C A a d I'
~
Peter Tam,Se Project M nager, Section 1 Project Directorate 11 Division of Licensing Project Management Office of Nuclear Reactor Regulation j
~ Docket Nos. 50-413 and 50-414 cc: See next page h gy
' Distribution:
COgle, Rll E-Mail Docket File OGC Brian Hughes PUBLIC CHawes Charlie Payne, Ril
[
PDil-1 Reading -
PTam D
ACRS DOCUMENT NAME: G:\\PDil-1\\ CATAWBA \\C5890LTR.WPD To receive a copy of this document, indicate in the box C= Copy w/o attachment / enclosure E= Copy with attachment / enclosure N = No copy OFFICE PDil-1/PM PDil-1/LA (PPDil-1/SC CHawes k Nmch PTarn:cn kk NAME DATE' 7 / [ /99
/N /99 7 / O /99 4 n n n p.y OFFICIAL RECORD COPY 9907120273 990708 PDR ADOCK 05000413 V
p rte g
,p UNITED STATE!'
{
j NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. 20565 4 001
%"***/
JUL 0 81999 Mr. G. R. Peterson Site Vice President Catawba Nuclear Station Duke Energy Corporation 4800 Concord Road York, South Carolina 29745-9635
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 RE: OPERATOR LICENSING REQUALIFICATION PROGRAM SCHEDULE CHANGE (TAC NOS. MA5890 l
AND MA5891)
Deer Mr. Peterson:
By [[letter::05000413/LER-1999-007, :on 990426,operation Prohibited by TS 3.4.7 Was Noted Due to Inoperable Train of Rhr.Caused by Inadequate Work Sequencing.Returned B Train RHR to Operable Status by Restoring Power to Valve 1NI136B|letter dated May 26,1999]], you requested NRC approval to change the scMile of the current two-year requalification training program. This change will allow you to schedule requalification examinations to non-outage dates. The current Catawba licensed operator requalification training program cycle started January 1,1999, and is scheduled to end December 31,2000. You proposed an attemate ending date of September 30,2000, to shorten the current cycle.
Title 10 of the Code of Federal Reaulations (10 CFR) Section 55.59(a)(1) specifies that such requalification program "not to exceed 24 months in duration." You have provided ~ sufficient information to demonstrate conformance with the regulations governing licensed operator i
requalification requirements. Therefore, we approve the requested schedule change. The next two-year cycle will start on October 1, 2000, and will end on September 30, 2002. Subsequent two-year cycles will also begin on October 1 and end on September 30.
Sincerely, l
/
A P
am, Senior Project Manager, Section 1 Project Directorate ll Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-413 and 50-414 cc: See next page
c
,r.
Catawba Nuclear Station cc:
Mr. Gary Gilbert.
North Carolina Electric Membership L;
Regulatory Compliance Manager Corporation Duke Energy Corporation P. O. Box 27306 4800 Concord Road,
Raleigh, North Carolina 27611 l
. York, South Carolina 29745 L
Senior Resident inspector Ms. Lisa F. Vaughn U.S. Nuclear Regulatory Commission l-Legal Department (PB05E)
- 4830 Concord Road Duke Energy Corporation :
York, South Carolina 29745 422 South Church Street I
Charlotte, North Carolina 28201-1006 Virgil R. Autry, Director Division of Radioactive Waste Management Anne Cottington, Esquire Bureau of Land and Waste Management Winston and Strawn Department of Health and Environmental
' 1400 L Street, NW Control Washington, DC 20005 2600 Bull Street Columbia, South Carolina 29201-1708 North Carolina Municipal Power l
Agency Number 1 L. A. Keller i-1427 Meadowwood Boulevard Manager-Nuclear Regulatory P. O. Box 29513 Licensing Raleigh, North Carolina 27626 Duke Energy Corporation 526 South Church Street County Manager of York C.ounty Charlotte, North Carolina 28201-1006 j;
l York County Courthouse L
York, South Carolina 29745 Saluda River Electric i
P. O. Box 929 Piedtront Municipal Power Agency Laurens, Gouth Carolina 29360 121 Village Drive-Greer, South Carolina 29651 Mr. Steven P. Shaver Senior Sales Engineer Ms. Karen E. Long Westinghouse Electric Company Assistant Attorney General 5929 Carnegie Blvd.
North Carolina Department of Justice Suite 500 l-P. O. Box 629 -
Charlotte, North Carolina 28209 l
- Raleigh, North Carolina 27602 L
Elaine Wathen, Lead REP Planner-l-
Division of Emergency Management 116 West Jones Street Raleigh, North Carolina 27603-1335 n
c x
i Catawba Nuclear Station ec:
Mr. T. Hicnard Puryear Owners Group (NCEMC).
Duke Energy Corporation -
4800 Concord Read '
York, South Carolina 29745 Richard M. Fry, Director Division of Radiation Protection North Carolina Department of Environment, Health, and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 l
I l
s 1
l