|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments 05000413/LER-1999-009-01, Forwards LER 99-009-01,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits. Commitments Are Contained in Planned Corrective Actions Section of Attached Rept1999-09-15015 September 1999 Forwards LER 99-009-01,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits. Commitments Are Contained in Planned Corrective Actions Section of Attached Rept ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010-01, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam 05000414/LER-1999-004, Forwards LER 99-004-00,re Containment Isolation Valve 2NM-221A Returned to Service Without Testing.Revised Rept Will Be Submitted to Include Addl Details When Rept Is Finalized1999-07-15015 July 1999 Forwards LER 99-004-00,re Containment Isolation Valve 2NM-221A Returned to Service Without Testing.Revised Rept Will Be Submitted to Include Addl Details When Rept Is Finalized 05000414/LER-1999-001-01, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Perfor1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 05000414/LER-1999-003, Forwards LER 99-003-00,re Unplanned Actuation of Esfa Sys. Supplemental LER Is Expected to Be Submitted by 9908311999-07-0808 July 1999 Forwards LER 99-003-00,re Unplanned Actuation of Esfa Sys. Supplemental LER Is Expected to Be Submitted by 990831 ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided ML20209E2701999-07-0101 July 1999 Forwards Insp Repts 50-413/99-03 & 50-414/99-03 on 990425- 0605.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209E3931999-06-28028 June 1999 Informs of 990618 Meeting Conducted at Facility to Present Results of Most Recent Periodic Plant Performance Review for Plant.List of Attendees Encl ML20196G8861999-06-24024 June 1999 Discusses GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structrual Integrity 950816 & 960729 Responses.Rvid,Version 2 Released as Result of Review.Rvid Should Be Reviewed & Comments Should Be Received by 990901 If Not Acceptable for Plant ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20196E9541999-06-18018 June 1999 Forwards SG Tube Insp Conducted During Unit 1 End of Cycle 11 Refueling Outage.Attachments 1,2,3 & 4 Identify Tubes with Imperfections in SGs A,B,C & D,Respectively ML20196G6541999-06-17017 June 1999 Confirms 990614 Telephone Conversation Re Rescheduling of Two Predecisional Enforcement Conferences Originally Scheduled for 990623.SSS Conference Rescheduled for 990712 & Ice Condenser Conference Rescheduled for 990720 ML20195K4571999-06-14014 June 1999 Forwards MORs for May 1999 & Revised MORs for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A5781999-06-14014 June 1999 Discusses Notice of Enforcement Discretion for Duke Energy Corp Re Catawba Nuclear Station Unit 1 TSs 3.5.2 & 3.7.12 1999-09-08
[Table view] Category:NRC TO UTILITY
MONTHYEARML20058J1251990-11-13013 November 1990 Advises That Re Martin Recently Assigned as Project Manager for Facility ML20058F6161990-10-26026 October 1990 Forwards Insp Repts 50-413/90-28 & 50-414/90-28 on 901001-04.Violation Re Corrective Actions Which Appear to Be Ineffective in Preventing Recurrence of Similar Violation Noted.Enforcement Conference Scheduled for 901105 ML20058F0891990-10-22022 October 1990 Confirms 901031-1102 & 12-16 & 26-30 as Dates for Maint Team Insp of Plant Per 901011 Telcon ML20058B4551990-10-17017 October 1990 Forwards Insp Repts 50-413/90-25 & 50-414/90-25 on 900924-28.No Violations or Deviations Noted ML20062B7051990-10-12012 October 1990 Requests Completion of Analysis of Liquid Samples Spiked W/ Radionuclides within 60 Days of Receipt of Ltr ML20062A0951990-10-0303 October 1990 Forwards Insp Repts 50-413/90-24 & 50-414/90-24 on 900803- 0905 & Notice of Violation ML20028H0561990-09-26026 September 1990 Forwards Notice of Withdrawal of Util 880726 & 900423 Applications for Amends to Licenses NPF-35 & NPF-52.Amends Would Have Modified Tech Specs Re Control Room Area & Annulus Ventilation Sys & Containment Purge Sys ML20059L4141990-09-14014 September 1990 Forwards Insp Repts 50-413/90-23 & 50-414/90-23 on 900730-0803.No Violations or Deviations Noted ML20059L5241990-09-0505 September 1990 Ack Receipt of 900810 Supplemental Response to Violations Noted in Insp Repts 50-413/90-09 & 50-414/90-09 ML20059H0121990-08-31031 August 1990 Forwards Insp Repts 50-413/90-19 & 50-414/90-19 on 900624- 0802 & Notice of Violation.Util Should Detail Measures to Be Taken to Place Addl Emphasis on Compensatory Actions Program ML20059E3121990-08-30030 August 1990 Advises That Util Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Further NRC Review,If Any,Will Be Performed Either by Insp or Audit ML20059G6171990-08-28028 August 1990 Forwards Insp Repts 50-413/90-20 & 50-414/90-20 on 900724-26.Unresolved Item Identified Re Procedure of Equating self-referral to Employee Assistance Program as First Positive Drug Test ML20056A5571990-08-0202 August 1990 Requests Addl Info Re DPC-NE-2004, Core Thermal-Hydraulic Methodology Using VIPRE-01 for McGuire & Catawba. Requests Response Expeditiously ML20058P8761990-07-31031 July 1990 Forwards Insp Repts 50-413/90-22 & 50-414/90-22 on 900709-13.No Violations or Deviations Noted ML20055H9131990-07-27027 July 1990 Forwards Safety Evaluation Accepting Actions Taken to Resolve NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes ML20055J2931990-07-23023 July 1990 Forwards Request for Addl Info Re Util 900315 Submittal of General Relief Request for Pumps in Inservice Testing Program.Addl Info Re Certain Areas That Deviate from OM-6, Identified in Encl,Required to Complete NRC Review ML20056A5071990-07-20020 July 1990 Forwards Insp Repts 50-413/90-15 & 50-414/90-15 on 900527-0623 & Notice of Violation.Violations,Refs Pertinent to Requirements & Elements to Be Included in Response Presented in Encl Notice of Violation ML20055H4191990-07-19019 July 1990 Forwards Insp Repts 50-413/90-21 & 50-414/90-21 on 900627-29.No Violations or Deviations Noted ML20055H4101990-07-18018 July 1990 Forwards Summary of Enforcement Conference on 900712 Re Unit 1 Inadvertent Diversion of Higher Pressure Reactor Coolant Water to Refueling Water Storage Tank on 900611,per Insp Repts 50-413/90-17 & 50-414/90-17.Handouts Also Encl ML20055H5881990-07-13013 July 1990 Forwards Insp Repts 50-413/90-16 & 50-414/90-16 on 900611-15.Violations Noted But Not Cited ML20058M9361990-07-13013 July 1990 Forwards Insp Repts 50-413/90-18 & 50-414/90-18 on 900625-29.No Violations or Deviations Noted ML20055H3601990-07-10010 July 1990 Advises That Reactor Operator & Senior Operator Licensing Exams Scheduled for Wk of 901015.Encl Ref Matls Requested by 900806 ML20055E3711990-07-0909 July 1990 Ack Receipt of Re Payment of Civil Penalties in Amount of $100,000,per NRC ML20055H4411990-07-0202 July 1990 Ack Receipt of 900607 Response to Violations Noted in Insp Repts 50-413/90-09 & 50-414/90-09.Implementation of Corrective Actions Will Be Examined During Future Insp ML20044B1031990-06-28028 June 1990 Forwards Insp Repts 50-413/90-17 & 50-414/90-17 on 900611-19.Violations Noted.Enforcement Conference to Discuss Apparent Violation Re Operator Failure to Follow Procedure for Transfer of Reactor Coolant Water Scheduled on 900712 ML20055C9911990-06-27027 June 1990 Confirms Region II Insp of fitness-for-duty Program on 900724-26.Brief Itinerary to Expedite Util Support of Program Encl ML20044B0851990-06-26026 June 1990 Forwards Insp Repts 50-413/90-13 & 50-414/90-13 on 900604-08.No Violations or Deviations Noted ML20059M9241990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C8421990-06-13013 June 1990 Forwards Insp Repts 50-413/90-14 & 50-414/90-14 on 900521-25.No Violations or Deviations Noted ML20043F9721990-06-11011 June 1990 Forwards Interfacing Sys LOCA Insp Repts 50-413/90-200 & 50-414/90-200 on 900416-27.No Significant Deficiencies Identified ML20043A9361990-05-10010 May 1990 Forwards Insp Repts 50-413/90-09 & 50-414/90-09 on 900304-0413 & Notice of Violation ML20042G4281990-05-0909 May 1990 Informs That Util Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, Complete IR 05000413/19900081990-05-0303 May 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-413/90-08 & 50-414/90-08.Corrected Date of Occurrence Confirmed IR 05000413/19900021990-04-30030 April 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-413/90-02 & 50-414/90-02 IR 05000413/19900101990-04-30030 April 1990 Forwards Summary of 900425 Enforcement Conference Re Insp Repts 50-413/90-10 & 50-414/90-10,including Unit 1 Pressurization Event on 900320,mod to Control Ciruitry Logic for RHR Suction Valve & Reportability of Subj Event ML20034B6721990-04-20020 April 1990 Forwards Request for Addl Info Re Steam Generator Tube Rupture (SGTR) Operator Actions by 900531,per Submission of 871207 & 29,880329,0504,18,0616,0701,0808,24 & 1215 & 891023 & 1215 Ltrs Re SGTR Accident Analysis ML20034B0351990-04-17017 April 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-413/89-27 & 50-414/89-27.Response to Question 91 in Meeting Minutes Discusses Backfit Issues of Generic Ltr 89-04 ML20034B0151990-04-16016 April 1990 Forwards Insp Repts 50-413/90-10 & 50-414/90-10 on 900322-26.Violations Noted.Insp Found Several Problems Including Lack of Mgt Control Over Plant Status & Failure to Rept Event as Required IR 05000413/19890321990-04-0606 April 1990 Forwards Correction to SALP Repts 50-413/89-32 & 50-414/89-32 ML20033G9851990-03-28028 March 1990 Forwards Insp Repts 50-413/90-08 & 50-414/90-08 on 900305- 09.Violations Noted.Notice of Violation Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000413/19900051990-03-0606 March 1990 Forwards Notice of Violation & Enforcement Conference Summary Re Insp Repts 50-413/90-05 & 50-414/90-05.Violation Involved Failure to Maintain Adequate Procedures to Preclude Unauthorized Operation of Containment Air Return Fan ML20248J3891989-10-16016 October 1989 Forwards Insp Repts 50-413/89-28 & 50-414/89-28 on 890911-15.Violations Noted ML20248D2921989-09-28028 September 1989 Discusses Util Response to Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Boundary Components in PWR Plants ML20248B6881989-09-25025 September 1989 Forwards Insp Repts 50-413/89-25 & 50-414/89-25 on 890801-28 & 0912-15.No Notice of Violation Issued for Violations Identified.Enforcement Conference to Discuss Violations Scheduled for 890928 ML20248B0921989-09-22022 September 1989 Confirms Arrangements for Enforcement Conference on 890928 to Discuss Failure to Take Adequate Corrective Action in Response to Failed Surveillance Test on Unit 2 Turbine Driven Auxiliary Feedwater Pump.Items to Discuss Encl IR 05000413/19890161989-09-20020 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-413/89-16 & 50-414/89-16 ML20248B7431989-09-20020 September 1989 Forwards Insp Repts 50-413/89-26 & 50-414/89-26 on 890821-24.No Violations or Deviations Noted.Attention Invited to Unresolved Items Identified IR 05000413/19890091989-09-20020 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-413/89-09 & 50-414/89-09.Extension of Reply Due Date to 891010 for Weaknesses Identified in Insp Approved in 890823 Telcon IR 05000413/19890021989-09-20020 September 1989 Ack Receipt of Util Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-413/89-02 & 50-414/89-02 ML20247G7421989-09-12012 September 1989 Forwards Insp Repts 50-413/89-24 & 50-414/89-24 on 890807-11.No Violations or Deviations Noted 1990-09-05
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20209E2701999-07-0101 July 1999 Forwards Insp Repts 50-413/99-03 & 50-414/99-03 on 990425- 0605.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided ML20209E3931999-06-28028 June 1999 Informs of 990618 Meeting Conducted at Facility to Present Results of Most Recent Periodic Plant Performance Review for Plant.List of Attendees Encl ML20196G8861999-06-24024 June 1999 Discusses GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structrual Integrity 950816 & 960729 Responses.Rvid,Version 2 Released as Result of Review.Rvid Should Be Reviewed & Comments Should Be Received by 990901 If Not Acceptable for Plant ML20196G6541999-06-17017 June 1999 Confirms 990614 Telephone Conversation Re Rescheduling of Two Predecisional Enforcement Conferences Originally Scheduled for 990623.SSS Conference Rescheduled for 990712 & Ice Condenser Conference Rescheduled for 990720 ML20196A5781999-06-14014 June 1999 Discusses Notice of Enforcement Discretion for Duke Energy Corp Re Catawba Nuclear Station Unit 1 TSs 3.5.2 & 3.7.12 NUREG-1600, Forwards Synopsis of Results of OI Investigation 2-1998-020 Completed on 990505,summary of Apparent Violations from Three Previous Insps & Specific Concerns to Be Addressed During 990623 Open Predecisional Enforcement Conference1999-06-0808 June 1999 Forwards Synopsis of Results of OI Investigation 2-1998-020 Completed on 990505,summary of Apparent Violations from Three Previous Insps & Specific Concerns to Be Addressed During 990623 Open Predecisional Enforcement Conference IR 05000413/19990101999-06-0303 June 1999 Confirms Conversation with Bradshaw on 990526 Re Rescheduling 990607 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Repts 50-413/99-10 & 50-414/99-10.Conference Will Be on 990623 in Atlanta,Ga ML20195F4141999-06-0202 June 1999 Forwards Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503.Apparent Violation Identified & Being Considered for Escalated Enforcement Action.Violation Involved Failure to Maintain Unit 1 Ice Condenser Lower Inlet Door Operable ML20207D0671999-05-20020 May 1999 Informs That During Meeting on 990512,arrangements Modified for Administration of Licensing Exams at Catawba Nuclear Station During Weeks of 990524 & 0607,respectively ML20207C8721999-05-20020 May 1999 Forwards Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.Three Violations Occurred & Being Treated as non-cited Violations.Activities Generally Characterized by Safety Conscious Operations & Sound Engineering & Maint ML20207C7761999-05-19019 May 1999 Informs That on 990618,NRC Will Meet with Mgt of Duke Energy Corp to Discuss Performance of Catawba Facility & Extends Invitation to Attend Meeting as Observer ML20207C8061999-05-19019 May 1999 Confirms 990510 Telcon with R Jones Re Predecisional Enforcement Conference Requested by NRC & Scheduled for 990607 in Atlanta,Ga to Discuss Apparent Violation Associated with Potential Inoperability of SSS ML20206P4911999-05-14014 May 1999 Forwards Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206M4201999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation (NRR) Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt (DLPM) Created.Reorganization Chart Encl ML20206U4091999-05-10010 May 1999 Forwards Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424.One Violation Occurred & Being Considered for Escalated Enforcement Action Involving Inoperability of Standby Shutdown Sys from 981216-29 ML20206N4191999-05-0606 May 1999 Informs That Team Will Inspect Dam at Standby Nuclear Service Water Pond on 990609.Purpose of Insp Will Be to Confirm That Structure Conforms with Design Documents & Capability of Performing Design Functions ML20205S5491999-04-21021 April 1999 Forwards SE Discussing DPC Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. Response Acceptable ML20206B7941999-04-16016 April 1999 Confirms 990331 Telcon Between M Purser of Util & R Franovich of NRC Re Public Meeting Scheduled for 990618 in York,Sc to Discuss Results of NRC Recent Plant Performance Review for Catawba Nuclear Station ML20205N3471999-04-12012 April 1999 Forwards Safety Evaluation & Eri/Nrc 95-506, Technical Evaluation Rept on Submittal Only Review of IPE of External Events at Catawba Nuclear Station,Units 1 & 2 ML20205T3491999-04-0909 April 1999 Informs That on 990317,T Beedle & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Catawba Nuclear Station for Y2K.No Y2K Exam Scheduled.Initial Exam Requested for Apr 2001 for Approx 18 Candidates ML20205N0531999-04-0606 April 1999 Forwards Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313.DPC Conduct of Activities at Catawba Facility Generally Characterized by Safety Conscious Operations & Sound Engineering.Five Violations Noted & Treated as NCVs ML20196K9961999-03-30030 March 1999 Forwards Synopsis of NRC OI Completed Rept Re Alleged Compromise of Initial Licensed Operator Exam at Cns.Oi Did Not Substantiate Allegation That Initial Operator Exam Compromised.Plans No Further Action Re Matter ML20205M2651999-03-25025 March 1999 Discusses PPR Completed 990201.Advises of Planned Insp Effort Resulting from Catawba PPR Review.Forwards Plant Issues Matrix & Insp Plan ML20207L7741999-03-15015 March 1999 Requests That NRC Exercise Discretion Not to Enforce Compliance with Actions Required by Plant,Units 1 & 2 Re TS Limiting Conditions for Operation 3.3.7 & 3.3.8 ML20207M9091999-03-0505 March 1999 Informs That Info Submitted by Application, Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20207A5821999-02-17017 February 1999 Forwards Insp Repts 50-413/98-12 & 50-414/98-12 & Notice of Violation.One Violation Being Considered for Escalated Enforcement Action ML20203G5161999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML20203A2421999-02-0505 February 1999 Forwards SE Accepting Proposal to Revise Methodology in TR DPC-NE-3002-A,to Permit Use of single-node Model,Instead of multi-node Model,To Represent SG Secondary Sys for post-trip Phase of Loss of Normal Feedwater Analysis for Plant,Unit 2 ML20202J4751999-01-29029 January 1999 Responds to Concern Raised on 981020 Re Appropriateness of Interaction of NRC Headquarters Operations Officer with on-shift Operations Staff During Event ML20202C2511999-01-27027 January 1999 Forwards Request for Addl Info Re Util 980331 Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, for Catawba Nuclear Station. Response Requested within 60 Days of Date of Ltr ML20199J8521999-01-11011 January 1999 Forwards Insp Repts 50-413/98-11 & 50-414/98-11 on 981101-1212.No Violations Noted ML20206R4511999-01-0606 January 1999 Discusses Arrangements Made During 981230 Telephone Conversation for Administration of Licensing Exams at Catawba Nuclear Station During Wks of 990524 & 990607. Requests Proposed Exam Outlines by 990308 1999-09-24
[Table view] |
Text
r 1
G-r yn p
4 OCT 2 2 Iguu Docket No.(50-413, 50-414-License No. NPF-35, NPF-52 DukeiPower Company:
ATTN: LMr.,H.-B. Tucker, Vice President Nuclear Production-Department P. 0. Box 1007 Charlotte, NC 28201-1007-Gentlemen:1
SUBJECT:
MAINTENANCE TEAM. INSPECTION OF THE CATAWBA NUCLEAR PLANT November 2,
.This. letter is :to confirm the dates of October 31 November _12616, and_26-30,1990, 'for the Maintenance Team Inspection at the 2'
Catawbas Nuclear Plant.
The dates for this. inspection were discussed during the1 telephone conversation' between Mr. J._ W. Hampton of your staff and.
_Mr. M. B. Shymlock of this office on' October 11, 1990.
. As wasidiscussed. during the. telephone conversation, the purpose of the October 31"and November 1 and 2Lvisit is to:
.1. '
Meetiwith-plant management involved 'with maintenance to describe the purpose. of - the~ inspection, the ' inspection plan, and -to discuss
= arrangements such-as," contacts, space for inspectors,~etc.
2.
Receive site specific"trafning for the team.
+
3.
cHave~ plant personnel present a description of the Catawba maintenance f,
programL(a brief written description would be helpful).
6
=with the location of'the maintenance facilities.
'9 4.
Have the )lant personnel provide a site tour to familiar.ize the team 7
15;
~ Coll'ecti selected procedures, documents,--and program descriptions, by the team,-for review during preparation for the inspection.
Thexinspectioniteam will-consist of a team leader and eight inspectors.
The.
f,J lteam leader and most of-the inspectors-will be NRC Headquarters personnel.
lThe materials / that the team would like to have' available for the first three
~
. days are identified in the enclosure to this letter.
During these days, L'g selectediprocedures and documents will :be. requested. for use during inspection
~
preparation.
9011080081 901022 t'
$DR ADOCK 05000413:
,,j b, PNV '
\\
4 Of
in l
% ec e.
e 2
00T 2 21990 Duke Power Company _
F Should you= have questions regarding this inspection please contact
'3 Mr'. M. :. B.~ ' Shyml oc k - a t -
404) 331-4196 or the Inspection Team Leader Mr. J. D. Wilcox at-(301 -492-0965.
Sincerely, l
7 Al n R. Herdt, Chief i
r>
Reactor Projects Branch 3 i
Division of Reactor Projects bc
Enclosure:
? Inspection Materials cc w/ encl:
J.;W. Hampton,. Station Manager K
? Catawba Nuclear Station
-P 0.- Box 256 Clover, SC.29710 p
A.LV.Carr,-Esq.
~
. Duke Power Company
- l P.s0. Box 1007 Char 1otte NC 28201-1007 J. Michael McGarry, III, Esq.
Bishop,- Cook, Purcell-and Reynolds
- 1400
- L: Street,-NW
- Washington,- D.-C.
20005 q
ENorth Carolina MPA-1~
3100 Smoketree'Ct., Suite 600 a
~P. O. Box 29513 Raleigh,'NC.27626-0513 HeywardLG. Shealy, Chief..
L' JBureau of Radiological Health
~
South -Carolina Department of Health
-and Environmental-Control 2600. Bul1 :Stree t
- Columbia, SC. 29201
-Richard P. Wilson, Esq.
~
. Assistant Attorney General S. C. Attorney General's Office P.-0. Box 11b49 Columbia, SC 29211-
-(cc w/ enc 1 cont'd:- see page 2) 4
n c
V, % l-
,n 1
z.-
, +, -
m
- e... ; <. g OCT 2 *91990 y>
. Duke Power Company 3
y 4.
cc w/ enc 1:.(Continued)
Michael Hirsch lf >
l Federal Emergency Management Agency
!500 C Street,'SW,. Room 840
[,
- Washington,'D. C.
.20472 t
&WW
' North Carolina Electric O
Membership Corporation
'3400:Sumner Boulevard' R'
P. 0. Box 27306 cp
- Raleigh, NC27611 n@M Karen E. Long 1
~
L
- ~ Assistant Attorney General t
" * 'N. C. Department of Justice'
?,
P. O. Box 629
-Raleigh,.NC: 27602.
i 7
k psaluda River Electric 4
gj"a
. Cooperative, Inc..
l#
P.!0.' Box'929
- LL'aurens,.SC -29360-p n
LS', S. Kilborn, Are'a Manager. _
lc
'Mid-South Area-ESSD Projects, E,
- Westinghouse Electric Corporation "f ', "4
- MNC~ West. Tower. " Bay 239
'P.:0. Box 335-
+'
g.,
Pittsburg, PAi 15230-W
... County. Manager of York County..
,i,
' York County > Courthouse 1
tj 3., _
York,SCj(297.45-
. Piedmont. Municipal Power Agency 121 VillageLDrive p-
- Greer, SC;r29651' 4
= State of South Carolina u
t,
', (becw/ encl:
See page 4)-
v7...
j
.'s i'
r
'l a
f.
l;l r,
i li r;:
f
nc :
ppit _
y-,
j.
y u
e s_
e h p v.W
~
nm.
-J p'
p m u.c
,...- lPoweb Companyy o
F w s +,
Duke
-4' g
E
%n 6
<bec w/ encl:-
7
- 9. D.LWilcox,-NRR/RSIB~
!K.iN..Jabbour, NRR1 B.-M111er,1RII-
$y,, ~
,lM.;B..Shymlock,(RII:
lA/RbHerdt,RII'
.w.,,:.-
=-
zDocument' Control. Desk
\\
$F LNRC. Resident Inspector.
d L
y U.S.1 NuclearcRegulatory Comission =
j MO
~ Route.-2, Boxil79-N:
]
47 w ;,,
York,.SC?'29745 j
w$
0
~
]q
).
1
+1
!i) e g
t
. S,e.
a l4., E t
-.(' p i "'
t j
v, h <
+
+
I'J)I l 7_'4 ;
gj, '
e i
4 g
r s
y i
g,y m
)
a s
' g' _
.I iy[
Q :;j yW
~
h..
.em a.at
- 1. _. u-y +, a:
a.
_s
' ~
,5,,s s
4 r
',f.
' lf 1
+.'.}
}
g - -
5:
,U' J
' ' ~
j[ -] ; 4 w.,.. [
l- {
y
+
c 4
v
'5},
' ' j'- }
- f.
1 t'r j y-
\\
., b E l
'/j.lti.f y;'i
.,4
'i'
!i
.J-f[h. se) c o.
f^'>
,, c Si
~
d
.y g,
iWh 1 0 :. (
- m%;,,
s e
';. t.
fu x
r i
. g t
g }'. I.
'r*
) A~j f _I ~ ^&
s
~
i
/. a$':'}W.,
m 4_.
, n. -
s<
N.jt/
f{d:
t
~
.pi a,
s g'
~
t
^{
i i
7p.
'g JRII:0RP RT :Ns
'p. My
- Q[
90
'}
4 f
ik
.ll h r
e
_'.k-
';l ' M i.
.d (i,g
'n t
.f, 1
y.
i
,- f N, '(
4, _. '-
,4,>
e:Q VN E
s m
.,^
,e
-- ; nr r
.g
7 y ;u
+,i Fp.
,ag,
.i
8 i
?>,
s.;~.-
OCT 2 21990 ENCLOSURE INSPECTION MATERIALS To help in preparation for the maintenance team inspection to be conducted 'on October 31, November 1, 2,.12-16 and 26-30, 1990, we request that you provide the. following documents for review, during the first three days of the ir.spection. ' During' these days the first week the team will select documents to -
Ebe used during_.the preparation phase of the inspection.
If you do not have the requested document or information, it is not necessary to generate it to comply-with this-request.-
We recognize that many of the documents requested separately may:be inclusive in a larger single document.
= Administrative procedures for Corrective,' Preventive, and Predictive maintenance activities.
Organization chart (with names) for site organization.
Detailed organization charts (with names, including craf t personnel) for the maintenance organizations, n:
Description of planning and scheduling activities.
Definition of y
priorities for ' maintenance work _ orders and how priorities are assigned.. Who makes assignments relative to which craft has lead responsibility on work orders and which craft will perform what type
.of' work..
Description of Maintenance / Operations interface during planning,
. scheduling, work close-out, and post-maintenance / functional testing-.
_ Description of work control process,1.e. :how work orders are initiated, planned executed, completed, closed out, and equipment is returned to service.
Description - or interface / communication procedures for actions involving other departments such as ! Technical / Engineering Support, Plant -Modifications, -QA/QC, Health Physics, etc.
-Description of.. maintenance personnel training and --retraining programs.
Methods used to measure the performance of the maintenance depart-
_ ments;- e.g. rework statistics, backlog number, etc.
'How is the information -used, how frequently are measurements taken, and who is informed of the results.
Procedures for communications with vendors for technical services and a
relative to the latest technical information on equipment and systems
' installed. at the plant.
Interface with vendors /NSSS for training, modification and replacement.
, a 1
1 i..
I.^'
O.CT 2 21990~
x p.-
Enclosure-2 3
Procedures for the control / monitoring of outside contractors (including NSSS and other-vendors) activities in support of maintenance.
a.
J Procedures' for.the conduct of QC inspections and QA surveillances during conduct of Maintenance activities.
Description of preventive maintenance program.
Description of predictive maintenance program, l
j; List' of all aaintenance work orders requiring rework over the last 6-i y
months.
1
~ List and description of forced outages occurring over the last'two'
'i of years.
List ofJ all equipment' nonconforming. requirements documents issued.
during-the last 12 months (chronologically by system).
Procedures'for preparation of and1 list of all Technical Specification
- LC0 tracking and. equipment deficiency mode restraint. documents issued -
O
.during the last 12 months.
3
-f+
q fDescription of licensee ' application of-industry initiatives (INPO,-
.i
-t owners group, NPRDS, EPRI.-NUMARC, etc.) to the maintenance program.-
1 E
~
- Brief description of data
- bases ;used in. support of maintenance 1
^
i
- (current and historical - work' orders, materials ad parts, tools, 4
y; health -physics, etc. ),
-.Brief chronologyJof significant changes.to mainienance program 4
e--
.(historical'and p1anned).
4 jfor ithe ltems listed,- above, where there is no formal 'procejure governing the:
l
. activity, please provide a short-written description on ho e the activity is-
. conducted (or list of contacts) to the; team at the beginninj of'the inspection.
s:
+
a 1
T.
F
[h '
w W f"'i 3 i
',E j -
i L-p ^
6
/s 1.
3 $ ':.
'i
- /
r
/
-t
,t
-