Forwards Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424.One Violation Occurred & Being Considered for Escalated Enforcement Action Involving Inoperability of Standby Shutdown Sys from 981216-29
ML20206U409
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/10/1999
From: Plisco L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Gordon Peterson
DUKE POWER CO.
Shared Package
ML20206U413 List:
References
50-413-99-10, 50-414-99-10, EA-99-094, EA-99-94, NUDOCS 9905250202
Download: ML20206U409 (6)


See also: IR 05000413/1999010

Text

.

,

.

(

May 10,1999

EA 99-094

Duke Energy Corporation

ATTN: Mr. G. R. Peterson

Site Vice President

Catawba Nuclear Station

4800 Concord Road

York, SC 29745

SUBJECT:

NRC SPECIAL INSPECTION REPORT NOS. 50-413/99-10 AND 50-414/99-10

Dear Mr. Peterson:

This refers to a special inspection conducted on March 14,1999 through April 24,1999, at the

e

Catawba Nuclear Station. The purpose of this inspection was to followup on an earlier

configuration control problem that rendered the Standby Shutdown System inoperable. The

enclosed report presents the results of this inspection, which were discussed with your staff at

an exit conducted on May 3,1999.

Based on the results of this inspection, an apparent violation was identified and is being

considered for escalated enforcement action in accordance with the " General Statement of

Policy and Procedures for NRC Enforcement Actions" (Enforcement Policy), NUREG-1600.

The apparent violation involved the inoperability of the Standby Shutdown System from

December 16 through 29,1998, and its potential unavailablity to perform its intended safety

function of maintaining reactor coolant pump seal integrity during certain events involving the

loss of normal seal injection. The inoperability was caused by two mispositioned circuit breakers

that were required to be ON [ closed) during Standby Shutdown System operation. The breakers

were left OFF [open) following maintenance activities on December 16,1999, because of a

~ human error during the development of a tag-out restoration procedure. No Notice of Violation

is presently being issued for these inspection findings. In addition, please be advised that the

characterization of the apparent violation described in the enclosed inspection report may

change as a result of further NRC review.

An open, predecisional enforcement conference to discuss this apparent violation has been

scheduled for June 7,1999. The decision to hold a predecisional enforcement conference does

not mean that the NRC has determined that a violation has occurred or that enforcement action

l

will be taken. This conference is being held to obtain information to enable the NRC to make an

l

enforcement decision, such as a common understanding of the facts, root causes, missed

/

opportunities to identify the apparent violation sooner, corrective actions, significance of the

/

issues, and the need for lasting and effective corrective action. In particular, we expect you to

address the safety and risk significance of the Standby Shutdown System inoperability for not

only loss of power and flooding events (as discussed in Licensee Event Report 50-413/98-19),

but for fire and security events as well. Additionally, this is an opportunity for you to point out

any errors in our inspection report and for you to provide any information concerning your

perspectives on: (1) the severity of the violation; (2) the application of the factors that the NRC

considers when it determines the amount of a civil penalty that may be assessed in accordance

9905250202 990510

,

PDR

ADOCK 05000413

g

PM

.220) \\

1

.

DEC

2

with Section VI.B.2 of the Enforcement Policy; and (3) any other application of the Enforcement

Policy to this case, including the exercise of discretion in accordance with Section Vll.

~ You will be advised by separate correspondence of the results of our deliberations on this

matter. No response regarding the apparent violation is required at this time.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

(Original signed by)

Loren R. Plisco, Director

Division of Reactor Projects

Docket Nos. 50-413 and 50-414

License Nos. NPF-35 and NPF-52

Enclosure: NRC Inspection Report 50-413/99-10, 50-414/99-10

cc w/ encl:

G. D. Gilbert

Regulatory Compliance Manager

Duke Energy Corporation

4800 Concord Road

. York, SC 29745-9635

Lisa Vaughn -

Legal Department (PB05E)

Duke Energy Corporation

422 South Church Street .

Charlotte, NC 28242

Anne Cottingham

Winston and Strawn

1400 L Street, NW

Washington, D. C. 20005

North Carolina MPA-1

Suite 600

,

P. O. Box 29513

Raleigh, NC 27626-0513

cc w/enci cont'd: (See page 3)

t

(

,

.

.

DEC

3

cc w/enci cont'd:

Virgil R. Autry, Director

Div. of Radioactive Waste Mgmt.

S. C. Department of Health

and Environmental Control

2600 Bull Street

Columbia, SC 29201

Richard P. Wilson, Esq.

Assistant Attorney General

S. C. Attomey General's Office

P. O. Box 11549

Columbia, SC 29211

Elaine Chan

Federal Emergency Management Agency

500 C Street, SW, Room 840

Washington, D. C. 20472

North Carolina Electric

Membership Corporation

P. O. Box 27306

Raleigh, NC 27611

Peggy Force

Assistant Attorney General

N. C. Department of Justice

P. Box 629

Raleigh, NC 27602

Saluda River Electric

Cooperative, Inc.

P. O. Box 929

Laurens, SC 129360

Cetunty Manager of York County

York County Courthouse

York, SC 29745

Piedmont Municipal Power Agency

121 Village Drive

Greer, SC 29651

L. A. 'Keller, Manager

Nuclear Regulatory Licensing

Duke Energy Corporation

526 S. Church Street

Charlotte, NC 28201-0006

cc w/ encl cont'd: (See page 4)

.

DEC

4

cc w/enci cont'd:

Steven P. Shaver

'

Senior Sales Engineer

Westinghouse Electric Company

5929 Carnegie Boulevard, Suite 500

i

Charlotte, NC 28209

i

Distribution w/ encl:

L. Plisco, Ril

P. Tam, NRR

R. Carroll, Ril

C. Payne, Ril

l

B. Summers, OE (2)

1

,

J. Lieberman, OE

'

PUBLIC

',

NRC Resident inspector

U.S. Nuclear Regulator Commission

4830 Concord Road

I

York, SC 29745

.

4

l

-

4

  • See previous concurrence pages for siggatures.

OFFICE

Rit: Catawba

Ril: Catawba

Ril:DRP

W

slGNATuRE

V /

[M(/\\

NAME

RFranovich

DRoberts

COgle

ABoland/

DATE

5/ 199

5/ 199

5/L9 199

A \\t) 199

W 199

5/ 199

5/ 19 9

i

COPY 7

YEs

NO

YES

NO

YES

No

/YES}

NO

YES

NO

YEs

NO

YES

NO

OFFICIAL RECORD COPY

DOCUMENT NAME: G:\\C Tli910.WPD

."

l

a

i

e

J

05-07-1999 08:57AM

FROM USNRC CATAWEA STATION

TO

BYRON

P.02

.339 07: 17

004bb24ble

'= "

.

.

DEC

5

Distributionw/ encl:

L Pilsco, Ril

P. Tam, NR9

R. Cerroll, Ril

C. Payne, Ril

PUBLIC

'

NRC Resident inspector

U.S. Nucieer Regulator Commission

4830 Concord Road

York, SC 29745

m.-

.m

nu.cesswee

ari. nr

aiimo,.

sIONATURE ',74I

NAlfE

Irrenowleh

Omotorte

cogie

Aeoland

DAin

eq t

u a

u m

e m

u m

u m

u m

heir

YES # 10 0 )

YES

90 0

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

OFFICIAL fkCORD COPY

DOCURRENT NARAE: 0:\\CATM10.WPD

d

05-07-1999 08:58AM

FROM UStRC CATAWBA STATION

TO

BYRON

P.03

.

.

.

DEC

4

cc w/enci cont'd:

Steven P. Shaver

Senior Sales Engineer

Westinghouse Electric Company

5929 Camogie Boulevard, Suite 500

Chariotte, NC 28209

Distnbution w/enct

L. Plisco, Ril

P. Tam, NRR

R. Carroll, Ril

C. Payne, Ril

PUBLIC

NRC Resident inspector

U.S. Nuclear Regulator Commission

4830 Concord Road

York,SC 29745

I

I

I

/

[c %

ornca

m:catowne

Ril:DRP

RN:Elc5

EAN

b

i

NARM!

l

NYWatkins

W

COgle

A8oland

DATE

/

W 199 /

S/ 6 199

SI 199

El 199

5/ 199

51 199

51 199

COPY?

W YES M

YES

  1. 66 4

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

OFFICIAL RECORD COPY

WURIENT NAME: C:\\WP61\\ DOCUMENT \\ REPORTS \\SO42 Cat 9910.wpd

TOTAL P.03