ML20206N419

From kanterella
Jump to navigation Jump to search

Informs That Team Will Inspect Dam at Standby Nuclear Service Water Pond on 990609.Purpose of Insp Will Be to Confirm That Structure Conforms with Design Documents & Capability of Performing Design Functions
ML20206N419
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/06/1999
From: Tam P
NRC (Affiliation Not Assigned)
To: Gordon Peterson
DUKE POWER CO.
References
TAC-MA4694, TAC-MA4695, NUDOCS 9905170222
Download: ML20206N419 (4)


Text

-. .

- May 6,1999

}, ,

, .A - , -c

, g.5

.S

' Mr. G. R. Peterson -.

Site Vice President

. Catawba Nuclear Station ~. '

Duke Energy Corporation 4800 Concord Road York, South Carolina 29745-9635

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 RE: INSPECTION OF THE

, DAM AT THE STANDBY NUCLEAR SERVICE WATER POND (SNSWP)

- (TAC NOS. MA4694 AND MA4695)

Dear Mr. Peterson:

As discussed with Ms. Martha Purser of your staff, a team consisting of Mr. Daniel S. Rom (team leader, NRC Office of Nuclear Material Safety and Safeguards), Messrs. Robert Bryant -

and Ronald Spath (members, both of the Federal Energy Regulatory Commission), will inspect the dam at the SNSWP on June 9,1999. This inspection is a routine function of the NRC's Dam Safety Program. The purpose of the inspection is to confirm that the structure conforms with the design documents, and that it is capable of performing its design functions. The previous inspection was done on February 26,1997, and the report was transmitted to you by my letter dated January 13,1998.

Mr. Rom can be reached at 301-415-6704. Please feel free to contact him to work out logistic details of the inspection.

Sincerely, original signed by:

Peter S. Tam, Senior Project Manager, Section 1 Project Directorate 11

. DMsion of Licensing Project Management

' Office of Nuclear Reactor Regulation Docket Nos. 50-413 and 50-414 cc: See next page Distribution: J. Zwolinski/S. Black C. Ogle, Ril g Docket File ' OGC / g PUBLIC - ACRS @

PD ll-1 R/F M. Satorius, Ril DOCUMENT NAME: G:\ CATAWBA \LTR4694.WPD To receive a copy of this document, indicate in the box C= Copy w/o attachrnent/ enclosure E= Copy with attachment / enclosure N = No copy OFFICE PDil-1/PM PDil 1/LA NMSS (A)BC/NM_SS G3PDil-1/SC NAME. PTam:cn - I CHaweh' DRom @ REmch DATE T / [/99' f /4 /99 J / S /99 .T /of /99 '5 / h /99 OFFICIAL RECORD COPY 9905170222 990506

  • PDR ADOCK 05000413

I-l t

) [- t UNITED STATES V

g j NUCLEAR REGULATORY COMMISSION

, WASHINGTON. D.C. 20666 4001 May 6, 1999

. Mr. G. R. Peterson

! Site Vice President l Catawba Nuclear Station Duke Energy Corporation j 4800 Concord Road  !

York, South Carolina 29745-9635 1

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 RE: INSPECTION OF THE DAM AT THE STANDBY NUCLEAR SERVICE WATER POND (SNSWP)

(TAC NOS. MA4694 AND MA4695)

Dear Mr. Peterson:

i 1

As discussed with Ms. Martha Purser of your staff, a team consisting of Mr. Daniel S. Rom (team leader, NRC Office of Nuclear Material Safety and Safeguards), Messrs. Robert Bryant and Ronald Spath (members, both of the Federal Energy Regulatory Commission), willinspect the dam at the SNSWP on June 9,1999. This inspection is a routine function of the NRC's Dam Safety Program. The purpose of the inspection is to confirm that the structure conforms with the design documents, and that it is capable of performing its design functions. The '

previous inspection was done on February 26,1997, and the report was transmitted to you by my letter dated January 13,1998.

Mr. Rom can be reached at 301-415-6704. Please feel free to contact him to work out logistic  !

details of the inspection.

l Sincerely, W

Peter S. Tam, Senior Project Manager, Section 1 l Project Directorate ll l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-413 and 50-414 cc: See next page l l

l t

I i ,

I I

~ k, h I a.

Catawba Nuclear Station cc' 1

Mr. Gary Gilbert North Carolina Electric Membership

- Regulatory Compliance Manager Corporation l Duke Energy Corporation P. O. Box 27306 1 4800 Concord Road Raleigh, North Carolina 27611 {

York, South Carolina 29745 i Senior Resident inspector l Ms. Lisa F. Vaughn U.S. Nuclear Regulatory Commission j Legal Department (PB05E) 4830 Concord Road j Duke Energy Corporation York, South Carolina 29745 i 422 South Church Street  !

Charlotte, North Carolina 28201-1006 Virgil R. Autry, Director l Division of Radioactive Waste Management Anne Cottington, Esquire Bureau of Land and Waste Management Winston and Strawn Department of Health and Environmental 1400 L Street, NW Control l Washington, DC 20005 2600 Bull Street i Columbia, South Carolina 29201-1708 l North Carolina Municipal Power Agency Number 1 L. A. Keller l 1427 Meadowwood Boulevard Manager - Nuclear Regulatory  :

P. O. Box 29513 Licensing  ;

Raleigh, North Carolina 27626 Duke Energy Corporation  ;

526 South Church Street l County Manager of York County Charlotte, North Carolina 28201-1006 j York County Courthouse j York, South Carolina 29745 Saluda River Electric i P. O. Box 929 i Piedmont Municipal Power Agency Laurens, South Carolina 29360 l 121 Village Drive Greer, South Carolina 29651 Mr. Steven P. Shaver Senior Sales Engineer  !

Ms. Karen E. Long Westinghouse Electric Company  !

Assistant Attorney General 5929 Carnegle Blvd. j North Carolina Department of Justice Suite 500 P. O. Box 629 Charlotte, North Carolina 28209 >

Raleigh, North Carolina 27602 i

Elaine Wathen, Lead REP Planner Division of Emergency Management 116 West Jones Street Raleigh, North Carolina 27603-1335 i

~,,

1,'- .

i.

g Catawba Nuclear Station cc:

Mr. T. Richard Puryear Owners Group (NCEMC)

Duke Energy Corporation 4800 Concord Road York, South Carolina 29745 Richard M. Fry, Director ..

Division of Radiation Protection North Carolina Department of Environment, Health, and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609 7721 I

i I

i