IR 05000413/1978012

From kanterella
Jump to navigation Jump to search
IE Inspec Repts 50-413/78-12 & 50-414/78-11 on 781114-17 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Work Activities,Quality Related Records for Safety Related Components & Concrete Testing Lab Equip
ML20147E351
Person / Time
Site: Catawba  Duke energy icon.png
Issue date: 11/30/1978
From: Ang W, Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20147E297 List:
References
50-413-78-12, 50-414-78-11, NUDOCS 7812210048
Download: ML20147E351 (5)


Text

- - _ _ - _

.

UNITED STATES

. [pm8toug]o NUCLEAR REGULATORY COMMISSION REGloN 11 e ) 3.,, g 101 M AR IETT A STR E ET, g

  • f AT L ANT A, GEORGI A 30303

\...../

Report Nos.: 50-413/78 12 and 50-414/78-11 Docket Nos.: 50-413 and 50-414 License Nos., CPPR-116 and CPPR-117 .

Category: A2 and A2 Licensee: Duke Power Company Power Building 422 South Church Street Charlotte, North Carolina 28242 Facility Name: Catawba Nuclear Power Station, Units 1 and 2 Inspection at: Clover, South Carolina Inspection conducted: November 14-17, 1978 Inspector: W. P. Ang Reviewed by: bca J .' C . B r'y a'nt', CfN ef s Il!30]78

~Date Engineering Support Section No. 1 Reactor Construction and Engineering Support Branch Inspection Summary In_syection on November 14-17, 1978 (Report Nos. 50-413/78-12 and 50-414/78-11)

Areas Inspected: Procedures, work activities and quality related records for safety-related components (Unit 1); procedures and work activities for safety-related pipe supports and restraints (Unit 1); concrete testing laboratory equipment, batch plant work activities, and concrete placement of auxiliary building roof (Unit 2). This inspection involved 24 inspector-hours on site by one NRC inspector.

  • Results: No items of noncompliance or deviations were identifie a10o W

- -

,

. .

RII Rpt..Nos. 50-413/78-12 I-1 and 50-414/78-11 DETAILS I Prepare'd by: k %e tm m U 30 7/

W'.~P.Ang;MdchanicalEngip6er Date Engineering Support Section No. 1 R2 actor Construction and Engineering Support Branch Dates of Inspection: November 14-17, 1978 Reviewedbh': O rh 7m I 36!7 d'

J. C. Bryant) Chief

~

i 'Da te Engineering Support Section No. 1 Reactor Construction and Engineering Support Branch Persons Contacted Duke Power Company (DPC)

  • D. G. Beam, Project Manager
  • L. R. Barnes, QA Manager, Construction
  • D. L. Freeze, Project Engineer
  • R. A. Morgan, Senior QA Engineer
  • S. W. Dressler, Senior Construction Engineer
  • Denotes those present at the exit intervie . Licensee Actions on Previous Inspection Findings l

Licensee actions on previous inspection findings were not reviewed during this inspectio . Unresolved Items No unresolved items were identified during this inspectio . Independent Inspection Effort A walk-through inspection of the concrete testing laboratory and concrete batch plant was performed. General work activities were observed and the condition of equipment was note Concrete placement on the Unit 2 auxiliary building was observe No items of noncompliance or deviations were identifie .

- _ _ _ _ _ _ _ _ _ _ _ _ _ _

- - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ '

. .

J RII Rpt. Nos. 50-413/78-12 I-2 and 50-414/78-11 1 Safety-Related Pipe Support and Restraint Systems (Unit 1)

DPC Epecification No. CNS-1206.00-4.3 Rev. 1 " Procedure Requirements for Fabrication and Erection of Hangers, Supports and Seismic Supports" and the following drawings were examined to ascertain that they have been approved by authorized licensee personnel:

. Isometric Drawings CN-NV048-R Rev. O CN-NV047-R Rev. O CN-NV046-R Rev. O CN-NIO11-R Rev. O CN-NIO50-R Rev. O Hanger Details Drawings 1-R-NV-1119, -1120, -1121, -1122, -1147, -1146 1-R-NV-1123, -1124, -1125 1-R-NV-1126, -1127, -1148, -1149 1-R-NI-1421, -1422, -1423, -1424, -1425, -1428, -1429 1-R-NI-1168, -1169, -1170 All the above listed drawings had DPC drawing title blocks. All had been reviewed and approved. However, the inspector was informed by the licensee that the initials on the drawings for the preparer, reviewer and approver were initials of EDS, San Francisco, personnel. The title blocks of the drawing did not identify them as EDS personnel. The licensee also informed the inspector that no approval by DPC is required for the drawings but that DPC does audit EDS. DPC's QA supplier audit on EDS performed on June 20 to 22, 1977, and DPC vendor surveillance reports on EDS dated 8-21-78, 2-23-78, and 11-17-77 were examined by the inspector at DPC corporate offices in Charlotte, North Carolin QA Procedure M-51 Rev. 0 " Component Supports," was reviewed and found to contain provisions for verification of conformance of installed hangers and supports to detailed drawings; showing type, location and configuration of the hangers and supports. QAP M-51 also provided for verification of fastener installation for restraints and support QA procedure P-1 provides for a general receiving inspection of materials ar.d equipment. QA procedure M-51, DPC Specification CNS-162, QAP M-4 and QAP L-100 provide welding and NDE instructions and requirements for supports and restraint The storage of restraint and support material was inspected for conformance to DPC storage requirement Ten stored mechanical

_ _ _ _ _ - _ _ _ _ _ - - - _ _ - _ _ _ - _ _ _ -

. _ _

-

. .

>

RII Rpt. Nos. 50-413/78-12 1-3 and 50-414/78-11 snubbers were checked for smoothness of shaft travel and unit activation. The ten snubbers are:

15,000 # Rating: Pacific Scientific Serial Nos. 3230, 3234 and 3235 6,000 # Rating: Pacific Scientific Serial Nos. 4033, 4046 and 4083 1,500 # Rating: Pacific Scientific Serial Nos. 2624, 2886, 2932, 2964 No items of noncompliance or deviations were identifie . Safety-Related Components - Review of QA Implementing Procedures (Unit 1)

This is a follow-on inspection to report No. 50-413/78-6. The following procedures provide post-installation cleaning, preservation and inspec-tion requirements for safety-related components: QA Procedure P-3, Rev. 9 " Storage Inspection" QA Procedure M-24, Rev. 5 " Piping System Cleanliness Inspection" QA Procedure M-28, Rev. 5 " Inspection of Housekeeping Requirements" QA Procedure L-72, Rev. 2 " Housekeeping Requirements" No items of noncompliance or deviations were identifie . Safety-Related Components - Observation of Work and Work Activities TUnit 1)

This is a follow-on inspection to report No. 50-413/78-6. The chemical and volume control pumps were selected as representative components for this inspectio Installation of these pumps had been partially complete Safety-related component storage warehouses were inspected for environment, protection, handling, identification, issue, records, cleanliness preservation, and storage surveillance inspections. The inspector noted that,in general, nonconforming material was being segregate However two areas noted contained unsegregated noncon-forming material . The inspector informed the licensee of the condition and immediate action was taken by the licensee to correct the conlitio The location and size of the unsegregated nonconforming material provided some question as to the practicality of segregation. Duetothenote4 question, the immediate licensee corrective action and the apparent limited magnitude of the problem, the inspected storage area for safety-

_ _ _ _ _ - .

'. , , .

A RII Rpt. Nos. 50-413/78-12 I-4 and 50-414/78-11 related components was considered to be in compliance with licensee PSAR commitment The partially completed installation of the chemical and volume control pumps was inspected for workmanship, location, placement and mountin Records were examined to determine what inspectio,ns had been performed and what inspection records had been generated and maintained. The in-place storage conditions of the pumps were also inspected. In place storage inspection and preventative maintenance records were examine Nonconforming components records, identification, segregation and corrective action was inspecte No items of noncompliance or deviations were identifie Safety-Related Components I - Review of Quality Records (Unit 1)

This is a follow-on inspection to report No. 50-413/78- Quality records for the chemical and volume control pumps were inspecte These included storage inspectica, installation inspection, receiving inspection and nonconforming condition records. Specifically, the following chemical and volume control pumps' records were examined:

(a) P-1A - Receiving Inspection Information Report (b) P-3A - Equipment Special Storage and Maintenance Inspection -SER M-66 and M-67 (c) M-9B - Equipment Release Document for the Installation of Rotating and Non-Rotating Equipment (d) M-9D - Process Control Sheet for Installation of Rotating and Non-Rotating Equipment (e) H-9A - Rotating Equipment Alignment Record (initial alignment only)

(f) M-10A - Process Control and Inspection of Torque to Bolts and Studs No items of noncompliance or deviations were identifie Exit Interview The inspector met with licensee representatives identified in paragraph 1

,

at the conclusion of the inspectio The inspector suiamarized the scope and findings of the inspection of safety-r< elated supports and restraints, safety-related components, the concrete testing laboratory and batch plant, and the concrete placement on Unit 2 auxiliary building roof. The licensee acknowledged the inspection findings.