Forwards IE Inspec Repts 50-413/78-12 & 50-414/78-11 on 781114-17 During Which No Items of Noncompliance Were Noted
ML20147E307
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/01/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML20147E297 List:
References
NUDOCS 7812210039
Download: ML20147E307 (2)


See also: IR 05000413/1978012

Text

. - - _ - _ - _ - _ - - _ _ _ _ _ _ _ _ _ _

. ..

. ,

># 8 8 0o, UNITED sT ATEs

' o NUCLEAR REGULATORY COMMISSION

n REGloN 11

[ 101 M ARIETT A sTRE ET, N.W.

5

0 '9 /. $f ATLANTA, GEORGIA 30303

%% ,,, w4/ DEC 011978

In Reply Refer To:

RII:WPA

50-413/78-12

50-414/78-11

.

Duke Power Company

ATTN: Mr. L. C. Dail, Vice President

Design Engineering

Post Office Box 33189

Charlotte, North Carclina 28^42

Gentlemen: ._

This refers to the inspection conducted by Mr. W. P. Ang of this office

on November 14-17, 1978 of activities authorized by NRC License Nos.

CFPR-116 and CPPR-117 for the Catawba Nuclear Power Station, Units 1 and

2 facilities, and to the discussion of our findings held with hr. D. G.

Beam at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be place:.i in the !!RC's Public

Document Room. If th report contains any informatior that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this of fice to withhold

such information from putlic disclosure. Any such application must

include a full statement of the reasons on the bssis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document. If we do not hear from you in this

regard within the specified period, the report will be placed in the -

Public Document Room.

781221DO99

- - - - - _ - - _ _ _ - --_ _

___ _ _ - - __ _ _ _ . -

'

.

t

DEC 011978

Duke Power Company -2-

1

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

f

Charles E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-413/78-12

and 50-414/78-11

cc w/ enclosures:

Mr. D. G. Beam, Project Manager

Catawba Nuclear Station

Post Office Box 223

Clover, South Carolina 29710

.

-- - - - - - - _ _ - - - - _ _ - _ _ _ . _ . _ _ __