Forwards LER 85-002-00
ML20128F130
Person / Time
Site: Yankee Rowe
Issue date: 06/21/1985
From: St Laurent N
YANKEE ATOMIC ELECTRIC CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8507080131
Download: ML20128F130 (1)


LER-2085-002, Forwards LER 85-002-00
Event date:
Report date:
0292085002R00 - NRC Website

text

YANKEE ATOMIC ELECTRIC COMPANY rzi:e non. <sia> s2s s2s,

( ,

Star Route, Rowe, Massachusetts 01367

=. )

, i . e e n t i E.f June 21,1985 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Dr. Thomas E. Murley, Regional Administrator

Subject:

Licensee Event Report 50-29/85-02 CS-V-621 Not Tested in Accordance with the ISI Program

Dear Sir:

In accordance with 10 CFR 50.73(a)(2)(i), the attached Licensee Event Report is hereby submitted.

Very truly yours, l)is%u.,/ "'l U& lite Normand N. St. Laurent Plant Superintendent DWE/nm Enclosure cc: [3] NSARC Chairman (YAEC)

[1] Institute of Nuclear Power Operations (INP0)

! B507000131 850621 ADOCK 050 9 gDR p, . A

+

1

o a RC Feem See U s. 3:UCLE t44 [EGULt. TORY COMMISSION IS 033 APPROYEO OMG NO 3150 4 104 LICENSEE EVENT REPORT (LER) ^""'""

DOCAET NUMSER (21 PAGE 138 F ACILITY NAME (Il Yankee Nuclear Power Station 015101010101219 1 lOFl 012 TITLE let CS-V-621 Not Tested in Accordance wi th the ISI Program EVENT OATE (Si LE R NUMBER 16) REPORT DATE 179 OTHER F ACILITIES INVOLVED (St 8' DAY VEAR f ACILIYv s eAMES DOCKET NUMBER 131 MONTH DAY YEAR VEAR 'n" f, MONTH 015!01010 1 I l

~ ~

0] 5 2l 4 85 8l5 0l 0l 2 0l0 0l6 2l 3 8l5 oistoioioi i i Twis REPORT is susMiTTEo PuRsuA=T TO THE REOuiREMENTs 0, 30 CF R 6 <Ca.ca eae e,-ore er ,a. r.<< . el o n MODE W l 20 402(bl 20 406(si 60.73(ell 2Havl 73.71lb)

R 20 406teHtHJ 60 3steHH 60.73(eH2 Hv) 73.71 lei nOS i 20 406i.niHa .0 3.i.H2, 60.73(.H2Hv

_ gl.E gsg.,g,,,,,,

20.406(eH1Hdil XX 60.73tell2H4 60.73(ell 2HumHA) J6dA) 20 406teH1Hivl 60.73teH2l led 60.73(ell 211,iiiHel 20.406tell1Het 60.73teH2Hdd 60 73IsH2)lai LICENSEE CONTACT FOR THis LE R 1121 NIME TELEPHONE NUM8ER Douglas W. Ellis, Plant Engineer 4 11 ( 3 4 12 14 l- 15 12 1611 COMPL ETE ONE LINE FOR E ACH COMPONENT F AILURE DESCRISED IN THIS REPORT 4131 MA C. R E 80R,T,A LE ** C' "

CiUSE $v8 TEM COMPONENT CAUSE SYSTEM COMPONENT "fD PR I I I I I I I I I I I I I I I I l i I I I I I I I I I i i

$UPPLEMENTAL REPORT EXPECTED (14 MONTH DAY YEAR Yt B 199 ven, e.m,<ete IXPECTED SU0 Mission QA fil NO l l A.uACTrt,,,.,....,,......,,..,,,,,,,,,,.,,..,,,,,n.,

On May 24, 1985 while operating in Mode 1 at 100 percent thermal power, an inadequacy of an Inservice Inspection (ISI) Program implementing procedure was identified. The inadequacy concerned the frequency and method of testing a containment isolation check valve, CS-V-621. The procedure as performed quarterly did not demonstrate a positive stroke (closed position) of the valve. ASME Section XI permits stroke testing quarterly or during cold shutdown (refueling). A positive stroke of CS-V-621 is not practical during plant operation due to system configuration and Technical Specifications (TS) operability requirements for the Safety Injection System. This procedural inadequacy did not properly implement T.S.

4.0.5 and is the result of personnel error during ISI Program development.

Corrective Actions included a review to determine if any similar inadequacies in related valve surveillance procedures existed. The review determined that two additional check valves, located in a separate system, could not be positively stroke tested during plant operation. Corrective Actions to prevent recurrence will include appropriate revisions to the ISI Program and implementing procedures to correctly indicate testing of the check valves during cold shutdown (refueling) in accordance with ASME Section XI requirements. The importance of adequate review of all T.S. implementing procedures will be stressed to all appropriate plant personnel. The ISI program will be revised by 12/31/85 and the ISI implementing procedures will be revised prior to their use for ISI exercising of these valves.

( [$ .

S 3,,. m >..

N C

~Re . m =A u s NuctuR REtutAToa co$ aissica LICENSEE EVENT REPORT (LER) TEXT CONTINUATION smovio OMS No 31so-oios EXPIRES 8/31/85 7 ACILif v NAME (1) DOCKET NUMBER (2) s LER NUM8ER (6) PAGE(31 "D U Yankee Nuclear Power Station 015101010101219 815 -

010l2 -

010 012 oF 0 l2 TEX 1 IN more space a orquwed, use adoone!NRC form 366Ksn1h On May 24, 1985 while operating in Mode 1 at 100 percent thermal power, an inadequacy of an Inservice Inspection (ISI) Program implementing procedure was identified. The inadequacy concerned the frequency and method of testing a containment isolation check valve, CS-V-621.

The ASME Section XI requirements permit testing of this valve quarterly or during cold shutdown (refueling). The ISI Program and implementing procedure required a quarterly stroke test of this valve, however this was not being accomplished during the testing. The piping and valve arrangement is such that CS-V-621 is located in series with check valves upstream and downstream of it. The procedure, as performed quarterly, did not demonstrate a positive stroke of CS-V-621. The procedure did, however, demonstrate positive stroke of one of the check valves in series with CS-V-621. Further, it is not practical to stroke this valve quarterly during plant operation due to system configuration and Technical Specifications (T.S.)

operability requirements for the Safety Injection System. However, the valve has been stroked during the 1984 refueling outage during a system pre-op test.

The procedural inadequacy did not properly implement the T.S. 4.0.5 requirements to accomplish Inservice Inspection and testing surveillances and is the result of personnel error during development of the ISI Program.

Corrective Actions taken have included a review of the ISI Procram and implementing procedures to determine whether a similar valve configuration and resulting methodology existed elsewhere in the Program. The review determined that similar stroking methodology did exist for two Emergency Boiler Feed check valves, EBF-V-813 and 819. The ISI Program requires a quarterly stroke of EBF-V-813 and 819. The procedure used did not demonstrate a positive stroke of these valves. Further investigation however had determined that these valves had been stroked during the prior refueling outage during system flow testing. As in the previous case, stroking of these valves is impractical during plant operation. Similarly, this inadequacy is also the result of personnel error during development of the ISI Program.

There are no significant safety consequences or implications involved since CS-V-621, and EBF-V-813 and 819 were stroked during the 1984 refueling outage.

Corrective Actions planned to prevent recurrence include appropriate revisions of the ISI Program and implementing procedures. The revision (s) will correctly indicate stroking of CS-V-621, EBF-V-813 and 819 on a cold shutdown (refueling) basis. This action is in accordance with ASME Section XI requirements and will correct the procedural deficiency. The ISI program will be revised by 12/31/85 and the ISI implementing procedures will be revised prior to their use for ISI exercising of these valves. The importance of an adequate review of all program Technical Specification implementing procedures will be stressed to all appropriate plant personnel.

There have been no previous Licensee Event Reports of this nature.