Issue date | Title | Topic | |
---|---|---|---|
ML20059J668 | 7 September 1990 | Forwards Operator Licensing Natl Exam Schedule Through FY94, Per Generic Ltr 90-07 | |
ML20059G041 | 7 September 1990 | Lists Util Organizational Changes.Ac Kadak Named President & CEO & Jk Thayer Named vice-president,effective 901001 | |
ML20059G035 | 6 September 1990 | Advises That Util Intends to Modify Tech Specs Re Emergency Diesel Generator Surveillance Testing.Util Will Continue to Follow Testing Prescribed by Plant Tech Specs Until Such Time as Approval Received | |
ML20059E108 | 28 August 1990 | Forwards Revised Diesel Generator Test Plan,Which Includes Addl Commitments Made During 900822 Discussions | |
ML20059B812 | 24 August 1990 | Provides fitness-for-duty Program Performance Data for Period Ending 900630 | |
ML20059B394 | 17 August 1990 | Advises That Util Performed Automated Ultrasonic Insp of Pressurizer Vessel Cladding Interface at Plant During 1990 Refueling Outage.Results of Insp Continue to Indicate No Evidence of Any Cladding Indication | |
ML20058N081 | 9 August 1990 | Request Relief from ASME Section XI Requirements for Low Pressure Surge Tank Cooling Pumps,Per Generic Ltr 89-04 as Result of Review of Facility Inservice Testing Program | |
ML20058L224 | 3 August 1990 | Forwards Peer Review of 900705 Reactor Pressure Vessel Evaluation,Prepared by Le Steele.Review Indicates Agreement W/Methodology in Chapter 5 of Evaluation | |
ML20058L221 | 2 August 1990 | Forwards Results of PTS Sensitivity Study for Mean Values of Ref Temps for Four Matls in Beltline Region | |
ML20055J201 | 27 July 1990 | Provides Steam Generator Insp Results & Advises of Nine Defective Tubes Discovered During Jul 1990 Insp.Complete Results Will Follow within 12 Months,Per Tech Spec 4.4.10.5.b | |
ML20055H670 | 25 July 1990 | Forwards Decommissioning Funding Assurance Rept & Certification, Per 10CFR50.75.Rept Includes Certification That Reasonable Assurance Will Be Provided That Funds Will Be Available for Decommissioning | |
ML20055G696 | 20 July 1990 | Forwards YAEC-1731, Yankee Nuclear Power Station Core 21 Performance Analysis. Results of Analysis Demonstrate That Plant Performance Well within Acceptable Limits | |
ML20055G665 | 20 July 1990 | Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Model 1153 Series D Transmitters Not Currently in Use at Plant | |
ML20055G678 | 19 July 1990 | Forwards, Yankee Plant Small Break LOCA Analysis | |
ML20055G703 | 19 July 1990 | Forwards Rev 0 to Yankee Cycle 21 Core Operating Limits Rept. Cycle Scheduled for Startup on 900811 | |
ML20055H829 | 16 July 1990 | Forwards Response to Request for Addl Info Re YAEC-1710, Yankee Nuclear Power Station Pilot Evaluation Rept for Plant License Renewal, & YAEC-1727P, Methodology for Identifying Potential Fluid Component Age-Related.. | License Renewal |
ML20055H002 | 16 July 1990 | Forwards Rev 24 to Security Plan.Rev Withheld | |
ML20055E153 | 5 July 1990 | Forwards Reactor Pressure Vessel Evaluation Rept, in Response to NRC 900501,07 & 15 Requests for Addl Info. Specific Chapters Re Requests Listed | |
ML20055D037 | 2 July 1990 | Responds to 900319 Commitment to Provide Scope & Schedule for Confirmatory Analysis for Steam Generator Overfill Protection by 900702.Scope of Analysis Will Include Identification of Potential Overfill Scenarios | |
ML20058K360 | 28 June 1990 | Forwards Addl Info to Support Proposed Change 234,modifying Tech Specs to Incorporate Wording Consistent w/NUREG-0452, STS for Westinghouse PWRs Re Min Discharge Pressure | |
ML20058K302 | 27 June 1990 | Provides Addl Info for Proposed Change 227 to License DPR-3. One Addl LPSI Pump Must Be Capable of Being Placed in Operable Status When Utilizing Spec 3.10.6 | |
ML20248G747 | 3 October 1989 | Responds to Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Program. Flow Monitoring Will Be Performed on Emergency Feedwater Pumps & Baseline Flow Data Will Be Established Using clamp-on Flow Device | |
ML20248G824 | 2 October 1989 | Forwards Rev 19 to YOQAP-I-A, Operational QA Program, Re Organizational & Programmatic Changes to Stated Plants | |
ML20247B776 | 1 September 1989 | Forwards Addl Info Re Topical Rept YAEC-1659 on SIMULATE-3 Validation & Verification | |
ML20247B605 | 31 August 1989 | Responds to Generic Ltr 89-12, Operator Licensing Exams. Formats for Proposed Operator Licensing Exam & Requalification Exam Schedules Encl | |
ML20247N152 | 27 July 1989 | Advises That Util Has No Agreements W/Employees That Contain Restrictive Clauses Re Notifying NRC of Potential Safety Issues,Per V Stello | |
ML20247N161 | 24 July 1989 | Informs That Util Intends to Utilize NRC Incident Response Ctr Data Handling Capabilities to Suppl Util Communications W/Nrc.New Communication Link Will Be Implemented During Facility Annual Emergency Exercise Scheduled for 891128 | Health Physics Network |
ML20247H741 | 21 July 1989 | Provides Addl Info Re Program to Address Concerns in Insp Rept 50-029/89-05 Re Vendor Technical Info Program.Master Inventory of Vendor Technical Manuals,Located at Plant & Engineering Ofcs,Completed | |
ML20247K072 | 21 July 1989 | Responds to Generic Ltr 89-08, Erosion/Corrosion Induced Pipe Wall Thinning, Per Guidelines in NUREG-1344.No Significant Pipe Wall Thinning Other than That Attributed to Normal Wear Occurred in Single Phase Piping | |
ML20248C929 | 19 July 1989 | Informs That Bl Drawbridge Will Be Replaced by Nn St Laurent as Acting Manager of Operations,Effective on 890724. Tk Henderson Will Become Acting Plant Superintendent | |
ML20246A586 | 30 June 1989 | Informs of Implementation of Upgraded Emergency Operating Procedures,Based on Westinghouse Owners Group Emergency Response Guidelines & Util Procedures Generation Package | |
ML20245C872 | 24 June 1989 | Forwards Rev 8 to Plant Security Training & Qualification Plan.Changes Reflect Upgrading Firearms Qualification Courses to practical,performance-based,combat-oriented Programs to Survive Lethal Confrontation.Rev Withheld | |
ML20245C885 | 24 June 1989 | Forwards Rev 22 to Plant Security Plan.Changes Reflect Required Retention Period for Security Records.Rev Withheld | |
ML20245H313 | 23 June 1989 | Forwards RELAP5YA:Computer Program for LWR Sys Thermal- Hydraulic Analysis,Vol 1:Code Description & RELAP5YA: Computer Program...Vol 2:Users Manual & Response to 197 Questions from NRC | |
ML20245F316 | 16 June 1989 | Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Determination That Westinghouse Mechanical Plugs from Heat Numbers 3279,3513, 3962 & 4523 Not Installed at Plant Noted | |
ML20247Q779 | 1 June 1989 | Responds to NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Util Committed to Addressing All Actions of Bulletin by 910103.Justification for Continued Operation Encl | Nondestructive Examination |
ML20247E784 | 24 May 1989 | Forwards Response to NRC Re Violations Noted in Insp Rept 50-029/89-04.Response Withheld (Ref 10CFR2.201) | |
ML20246D685 | 2 May 1989 | Forwards Response to NRC Review Questions on Plant Revised Reflood Heat Transfer Model for LOCA Analysis.To Address Recent Change in App K,Blowdown Heat Transfer Logic Modified to Prevent Use of Dougall-Robsenow Correlation | |
ML20245B498 | 18 April 1989 | Forwards Printout of Status of Implementation of TMI Action Items,Per NRC 890414 Request | |
ML20244C759 | 14 April 1989 | Provides Supplemental Info to Util 890321 Proposed Change 218 to Add Snubber to Pressurizer Drain Piping to Enhance Seismic Capability of Piping | |
ML20244C552 | 13 April 1989 | Responds to Station Blackout Rule 10CFR50.63.Review of Existing Battery Capacity Calculations Verifies That Batteries Have Sufficient Capacity to Meet Station Blackout Loads for 1 H | Safe Shutdown |
ML20244B810 | 10 April 1989 | Forwards Inservice Insp Exam Rept for 881113-890117. Form NIS-I as Required by Provisions of ASME Section XI Also Included | |
ML20244C538 | 10 April 1989 | Informs That Util Will Not Propose Change to Tech Spec 6.5.2.10,per Discussion.Nuclear Safety & Audit Review Committee Will Now Rept to President of Yankee,Instead of vice-president.Tech Spec Change Unwarranted | |
ML20247Q642 | 31 March 1989 | Responds to NRC Re Violations Noted in Insp Rept 50-029/88-22.Corrective Actions:Mod to Original Engineering Design Change & Evaluation of Engineering Deficiency Performed W/Actions Specific to Prevent Recurrence | High Radiation Area |
ML20247Q485 | 31 March 1989 | Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Util Maintaining Stored Spares for safety-related Applications,Per Criteria for Action Item 7 | Commercial Grade Dedication |
ML20247B308 | 22 March 1989 | Informs of Present Level of Nuclear Property Insurance Coverage for Plant as of 890401.Coverage Carried W/American Nuclear Insurers & Mutual Atomic Energy Reinsurance Pool | |
ML20247A901 | 22 March 1989 | Forwards Yankee Atomic Electric Co Annual Rept 1988. Rept Covers 3-yr Period Ending 881231 | |
ML20236D596 | 17 March 1989 | Responds to NRC Re Violations Noted in Insp Rept 50-029/88-09.Corrective Actions:Specific Remedial Training Included in Prestartup Training Program Attended by All Licensed Operators & Shift Technical Advisors | |
ML20235Z057 | 7 March 1989 | Forwards Proposed Rev 21 to Security Plan.Rev Withheld | |
ML20235V849 | 3 March 1989 | Responds to NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Bulletin Action Item 1a Completed During Last Refueling Outage & No Indication of Piping or Support Degradation Observed.Plant Analysis Being Performed |