y i

1 4

' 9' p

[ YANKEE ATOMICELECTRIC COMPANY "CW".s*s];*;*l" 580 Main Street, Bolton, Massafhusetts 01740-1398 v.-

September 6, 1990 BYR 90-120 s

United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20553 j

Reference:

(a)

License No. DPR-3 (Docket.No. 50.29)

Subject Emergency Diesel Generator Surveillance Testing

Dear Sir:

'l The purpose of this letter is'to inform you of our intent and commitment

i to modify the Technical Specifications for the Yankee Nuclear Power Station" (YNPS). As you may be aware, Yankee -is' currently. replacitig thetthree j

Emergency Diesel Generators with' units having approximately 50% greater.

standby capability. This modification-is being performed 1under.the provisions of.'10CFR50.59 and the Safety Evaluation for the change has concluded that'the q

provision of the present Technical Specifications are satisfied following this.

j change.

Yankee's position, however, is that there.may be a benefit associated.

with acknowledging the increased capacity by modifying theLTechnical' Specifications and performing routine.~ surveillance testing.to prove this capability. This position.has been discussed with the Resident inspe: tor at-1 YNPS and it has been agreed to outline the changes anticipated in advanceLof j

the formal Proposed Change process.

!l The changes would be made to Specification 3/4 8.1 in accordance with' guidance provided by Westinghouse Standard Techn{r'el Spec { fication.

Revision 4, November 1981 as follows:

1.

Specification 4.8.1.1.2.a.4 would be modifled to, test the.three Emergency -

't Diesel Generators quarterly on a staggered basis at' greater'than 450:kW.

(continuous rating) for a period of one hour.

2.

Specification 4.8.1.1.2.d.4 would be modified to test.the-three' Emergency Diesel' Generators during each refueling' outage interval for a; period of '

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at loads of at least 495 kW (110% of continuous rating) for~the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />;and at least 450 kW for the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />.

l 1

\\.

O'0?3 9009.120099 900906

~

PDR ADOCK 05000029 OO/

P PDC

/

2

4 3-

,.s',

i United States Nuclear Regulatory Commission:

-September 6,;1990 Bocument Control Desk Page-2a BYR 90-120 i

These changes are curre*.itly being prepared-and, reviewed for submittal under the provisions of 100FR50.90. Until such time as these changes receive final Commission review and approval, Yankee will continue to follow the testing prescribed by: Plant Technical Specifications. Additionally, we.will-develop procedures and begin the new' quarterly' surveillance program outlined; i

in.1 above.. Testing'in accordance with 2 above isibeing performed as part of-i the preoperational test program for the new Emergency Diesel Generator sets' l

and will also be performed at'the next scheduled refueling outage-(currently.

March - April'1992).

l We trust that tiils clarifics our intentions with'regards= to revisions -to our Emergency. Diesel Generator testing programs.

Should you'have any.

questions, please do not hesitate to contact us.

Very truly yours,

.i YANKEE ATOMIC ELECTRIC COMPANY' s

Georg apanic, Jr.

Senior Licensing Engineer Yankee Project I

CP/gjt/WPP72/94

~

l cet USNRC Region I USNRC Resident Inspector I