[ YANKEE ATOMICELECTRIC COMPANY "CW".s*s];*;*l" 580 Main Street, Bolton, Massafhusetts 01740-1398 v.-
September 6, 1990 BYR 90-120 s
United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20553 j
Reference:
(a)
License No. DPR-3 (Docket.No. 50.29)
Subject Emergency Diesel Generator Surveillance Testing
Dear Sir:
'l The purpose of this letter is'to inform you of our intent and commitment
- i to modify the Technical Specifications for the Yankee Nuclear Power Station" (YNPS). As you may be aware, Yankee -is' currently. replacitig thetthree j
Emergency Diesel Generators with' units having approximately 50% greater.
standby capability. This modification-is being performed 1under.the provisions of.'10CFR50.59 and the Safety Evaluation for the change has concluded that'the q
provision of the present Technical Specifications are satisfied following this.
j change.
Yankee's position, however, is that there.may be a benefit associated.
with acknowledging the increased capacity by modifying theLTechnical' Specifications and performing routine.~ surveillance testing.to prove this capability. This position.has been discussed with the Resident inspe: tor at-1 YNPS and it has been agreed to outline the changes anticipated in advanceLof j
the formal Proposed Change process.
!l The changes would be made to Specification 3/4 8.1 in accordance with' guidance provided by Westinghouse Standard Techn{r'el Spec { fication.
Revision 4, November 1981 as follows:
1.
Specification 4.8.1.1.2.a.4 would be modifled to, test the.three Emergency -
't Diesel Generators quarterly on a staggered basis at' greater'than 450:kW.
(continuous rating) for a period of one hour.
2.
Specification 4.8.1.1.2.d.4 would be modified to test.the-three' Emergency Diesel' Generators during each refueling' outage interval for a; period of '
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at loads of at least 495 kW (110% of continuous rating) for~the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />;and at least 450 kW for the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />.
l 1
\\.
O'0?3 9009.120099 900906
~
PDR ADOCK 05000029 OO/
P PDC
/
2
4 3-
,.s',
i United States Nuclear Regulatory Commission:
-September 6,;1990 Bocument Control Desk Page-2a BYR 90-120 i
These changes are curre*.itly being prepared-and, reviewed for submittal under the provisions of 100FR50.90. Until such time as these changes receive final Commission review and approval, Yankee will continue to follow the testing prescribed by: Plant Technical Specifications. Additionally, we.will-develop procedures and begin the new' quarterly' surveillance program outlined; i
in.1 above.. Testing'in accordance with 2 above isibeing performed as part of-i the preoperational test program for the new Emergency Diesel Generator sets' l
and will also be performed at'the next scheduled refueling outage-(currently.
March - April'1992).
l We trust that tiils clarifics our intentions with'regards= to revisions -to our Emergency. Diesel Generator testing programs.
Should you'have any.
questions, please do not hesitate to contact us.
Very truly yours,
.i YANKEE ATOMIC ELECTRIC COMPANY' s
Georg apanic, Jr.
Senior Licensing Engineer Yankee Project I
CP/gjt/WPP72/94
~
l cet USNRC Region I USNRC Resident Inspector I