Text
&
- y n
YANKEEATOMICELECTRICCOMPANY
'Q";,1 *go?,'l""
n.
S80 Main Street, Bolton, Massachusetts 017401398 Ymus August 28, 1990 BYR 90-118 4
United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Reference:
(a) License No. DPR-3 (Docket No. 50-29)
(b) _ Yankee Letter to USNRC, dated August 20, 1990
Subject:
Diesel Generator Testing, Revision 1
Dear Sir:
. Yankee, in Reference (b), provided the USNRC with its initial YNPS Diesel Generator-Test Plan. This plan has been revised to include our additional commitments made during our discussions on August 22, 1990.
We' trust that this_ revised program outlined in the attachment will be satisfactory;.however, if you have any questions, please contact us.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY l
George apanic, J Senior Project Engineer Licensing GP/gjt/WPP72/95 Attachment cc: USNRC Region I USNRC Resident Inspector, YNPS OO3"?
00 I
9009100027 900828 E~
- PDR ADOCK 05000029"'
P=
PNU A s
4 YNPS EDG Test Plan Revision 1 Page 1 of 3 YMPS DIE 8EL GENERATOR TEST PLEM IRB OUALIFICATION AND PRE-OPERATIOMEY. TESTING EDG UNIT MO.'S 1, 2,
3.
&z Factory Production Tests Performed on Unit Serial No.'s 36431-1, 2.
and 3.
The following testing was performed by the engine e
manufacturer a Western Branch Diesel, Virginia:
- Engine Warm-up
- 15 minutes at 300-KW
- 15 minutes at 450 KW
- 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 600 KW R2 oualification Testina of Unit Serial No. 36431-1. (Procedure No. YRP-EOP-005 Revision 2)
Testing performed per YR-EQP-005 Rev. 2 by Yankee Atomic at Power Products Inc.:
1.
Initial Production Test 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 225 KW (50% of continuous rating) 1 hour-at 338 KW (75% of continuous rating) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 450 KW (100% of continuous rating) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at 495 KW (110% of continuous rating) 2.
Initial Tvoe Tests a) Load Caoability Test
- 1 Hour at 450 KW (100% of continuous rating)
- 2 Hours at 600 KW (short-time load rating)
- 22 Hours at 450 KW (100% of continuous rating) b) Load Reiection Test
- Perform 600 KW (short-time load rating) load rejection and record maximum engine speed.
+
e ii YNPS EDG Test Plan Revision 1 Page 2 of 3 c) No-Load Test
- Operate engine at no-load and apply 225 KW (50%.
of continuous rating) for 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.
3.
Start and Load Acceotance Test' From a diesel engine warm standby condition, a total of 5 start and single step loads Of 427.5
- 450 KW (95% - 100% of continuous rating) will'immediately be applied for one hour. Verify that the load is accepted and that the engine recovers. Record data.-
Et EDG Pre-Ocerational and Reliability Test for Unit Serial No.'s 36431-1.
- 2. and 3.(Procedure No. OP-5000.312)
- 1. Pre-Ocerational ' Test a) Engine controls set-up, alarms testing, No-load governor setpoint, and engine performance monitoring.
b) 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> at 95-100%-continuous load rating (427.5 - 450 KW).
c) 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at 110% continuous load rating (495KW).
- 2. Startina Reliability Test-a)
From an engine warm standby condition (jacket-water and lube oil temperature at or below 130 +/- 10 degrees F (tolerance of heater element)), a total of 30 consecutive start and single step loads of 427.5 - 450 KW (95-100% of continuous rating) will be immediately applied and held for~a 1/2 hour duration with no failurer,to start or maintain load.
NOTE:
Upon completion-of 10 consecutive, successful start & load tests, the EDG can'be declared operable per NRC guidance.
n YNPS EDG Test Plan Revision 1 Page 3 of 3 Ex OP-4209 Technical Soecification Surveillance Test 1)
For each-unit; from a diesel engine warm standby condition, perform the once per 18 month Technical Specification required " Emergency Diesel Generator Test During Refueling Intervals," OP-4209. Each' diesel generator will be monitored during the acceptance of actual plant loads.: Data will be evaluated and utilized as a basis'for final acceptance of each units' performance capability.
4
! s_
l d.