Category:CORRESPONDENCE-LETTERS
MONTHYEARIR 05000412/19990071999-10-21021 October 1999 Refers to Special Team Insp 50-412/99-07 Conducted from 990720-29 & Forwards Nov.Two Violations Identified.First Violation Involved Failure to Implement C/A to Prevent Biofouling of Service Water System ML20217M1591999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments L-99-143, Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct1999-10-11011 October 1999 Informs That Subsequent Review of Approval Ltrs & SE for Relief Requests 1TYP-2-B5.40-1 (Rev 0),BV1-RV-AUG (Rev 1), BV2-RV-AUG (Rev 1),BV3-IWA-1 (Rev 1) & BV3-IWA-2 (Rev 1) Identified Erroneous Statements Which Dl Wishes to Correct L-99-152, Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections1999-10-11011 October 1999 Submits Relief Request BV3-N-533-1,rev 0,requesting Use of ASME Approved Code Case N-553-1, Alternative Requirements for VT-2 Visual Examination of Class 1,2 & 3 Insulated Pressure Retaining Bolted Connections ML20217C6741999-10-0808 October 1999 Forwards RAI Re Licensee 970128 Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, . Response Requested within 60 Days of Receipt of Ltr ML20217E0301999-10-0707 October 1999 Forwards Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violation Noted Involving Failure to Correctly Translate Design Change Re Pertinent Operating Logs & Plant Equipment Labeling L-99-151, Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program1999-10-0707 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-412/99-07.Corrective Actions:Condition Repts Were Written for Listed Issues So That Repts Could Be Addressed Using BVPS Corrective Action Program ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML20216J9621999-09-30030 September 1999 Forwards Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Ncvs.One Violation Re Failure to Follow Operation Manual Procedure Associated with Configuration Control Identified ML20212K8071999-09-30030 September 1999 Informs That on 990916,NRC Staff Completed mid-cycle Plant Performance Review (PPR) of Facility.Staff Conducted Reviews of All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility ML20212M2661999-09-30030 September 1999 Forwards Order Approving Transfer of Licenses for Beaver Valley from Dlc to Pennsylvania Power Co & Approving Conforming Amends in Response to 990505 Application ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. L-99-149, Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion1999-09-28028 September 1999 Informs NRC That Items Identified in 990629 Response to GL 98-01 Have Been Completed.Attached Table Submitted with Has Been Updated to Reflect Completion L-99-148, Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 9908171999-09-24024 September 1999 Notifies NRC of License Withdrawal of M Linch,License SOP-11478 IAW 10CFR50.74.M Linch Resigned from Employment at Bvps,Effective 990817 ML20212G0601999-09-23023 September 1999 Forwards Answer of Duquesne Light Co to Petition to Waive Time Limits & Suppl Comments of Local 29, Intl Brotherhood of Electrical Workers.Copies of Answer Have Been Served to Parties & Petitioner by e-mail or Facsimile ML20212C5521999-09-21021 September 1999 Forwards for Filing,Answer to Firstenergy Nuclear Operating Co & Pennsylvania Power Co in Opposition to Petition to Waive Time Limits & Suppl Comments of Local 29 Intl Brotherhood of Electrical Workers L-99-144, Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-031999-09-20020 September 1999 Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-03 ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML20212B3291999-09-16016 September 1999 Forwards for Filing,Petition to Waive Time Limits in 10CFR2.1305 & Supplemental Comments of Local 29,Intl Brotherhood of Electrical Workers Re Beaver Valley Power Station,Units 1 & 2 L-99-134, Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC1999-09-15015 September 1999 Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC ML20211Q3431999-09-0808 September 1999 Informs That During 990903 Telcon Between L Briggs & T Kuhar,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant,Unit 1.Insp Planned for Wk of 991115 ML20211Q5601999-09-0707 September 1999 Forwards Insp Rept 50-412/99-07 on 990720-29.Three Apparent Violations Noted & Being Considered for Escalated Ea. Violations Involve Failure to Implement C/As to Prevent bio- Fouling of Svc Water Sys L-99-138, Forwards Rev 37 to Issue 4 for BVPS Physical Security Plan (PSP) (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Changes to Plan Are Listed.Encls Withheld Per 10CFR2.790(d)1999-09-0303 September 1999 Forwards Rev 37 to Issue 4 for BVPS Physical Security Plan (PSP) (Base Plan,Safeguards Contingency Plan & Training & Qualification Plan).Changes to Plan Are Listed.Encls Withheld Per 10CFR2.790(d) L-99-098, Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods1999-09-0202 September 1999 Forwards Proposed Changes to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Change Would Reduce Operations QA Program Description Commitments by Limiting Required Onsite Safety Committee Reviews of Mods L-99-136, Forwards Data Point Library (Dpl) Changes,Iaw Provisions of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6, Administrative Implementation Requirements. Ten Listed Dpls Have Specific Setpoint Values Removed,Per Unit 2 Dpls1999-09-0202 September 1999 Forwards Data Point Library (Dpl) Changes,Iaw Provisions of 10CFR50,App E,Section VI.3.a & NUREG-1394,Rev 1,Section 3.6, Administrative Implementation Requirements. Ten Listed Dpls Have Specific Setpoint Values Removed,Per Unit 2 Dpls ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant L-99-137, Forwards Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing Program for Pumps & Valves. Encl 1 Provides Summary of IST Program Changes Which Have Been Incorporated Into Issue 3, Rev 31999-08-31031 August 1999 Forwards Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing Program for Pumps & Valves. Encl 1 Provides Summary of IST Program Changes Which Have Been Incorporated Into Issue 3, Rev 3 L-99-022, Forwards Issue 2,Rev 1 to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves. Summary of Changes,Encl1999-08-31031 August 1999 Forwards Issue 2,Rev 1 to Bvps,Unit 2 Inservice Testing (IST) Program for Pumps & Valves. Summary of Changes,Encl L-99-037, Forwards Proposed Change to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Attachment 1 Further Describes Proposed Change & Identifies Reason for Change1999-08-30030 August 1999 Forwards Proposed Change to Bvps,Units 1 & 2 Operations QA Program Description,Iaw 10CFR50.54(a)(3)(ii).Attachment 1 Further Describes Proposed Change & Identifies Reason for Change L-99-012, Forwards Proposed Change to Bvps,Units 1 & 2,operations QA Program Description,Per 10CFR50.54(a)(3)(ii),including Description of Proposed Change,Reason for Change & Basis for Concluding Revised Program Satisfy 10CFR50,App B1999-08-30030 August 1999 Forwards Proposed Change to Bvps,Units 1 & 2,operations QA Program Description,Per 10CFR50.54(a)(3)(ii),including Description of Proposed Change,Reason for Change & Basis for Concluding Revised Program Satisfy 10CFR50,App B ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 L-99-132, Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 21999-08-26026 August 1999 Forwards fitness-for-duty Program Six Month Rept for 990101-990630 for Bvps,Units 1 & 2 05000412/LER-1999-007, Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info1999-08-19019 August 1999 Forwards LER 99-007-00, Forced Shutdown Due to Inoperable EDG, Per 10CFR50.73(a)(2)(i).Rept Is Delayed Due to Util Needing Addl Three Days to Address Event Issues on Reportability & Provide Addl Safety Implications Info ML20211A5111999-08-18018 August 1999 Forwards Insp Repts 50-334/99-04 & 50-412/99-04 on 990613- 990724.One Violation Noted & Treated as Non-Cited Violation Involved Failure to Maintain Containment Equipment Hatch Closed During Fuel Movement L-99-127, Provides Response to NRC Ltr Requesting Review & Comment of NRC Reactor Vessel Structural Integrity Database by 990901.Inconsistencies Noted in Way Data Characterizes Condition of Reactor Vessel1999-08-17017 August 1999 Provides Response to NRC Ltr Requesting Review & Comment of NRC Reactor Vessel Structural Integrity Database by 990901.Inconsistencies Noted in Way Data Characterizes Condition of Reactor Vessel ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors L-99-124, Requests Withdrawal of Editorial Changes That Do Not Pertain to Transfer of Operating Authority or Plant Ownership That Are Proposed in LARs 269 & 144.Revised mark-up License Pages Reflecting Changes,Attached1999-07-30030 July 1999 Requests Withdrawal of Editorial Changes That Do Not Pertain to Transfer of Operating Authority or Plant Ownership That Are Proposed in LARs 269 & 144.Revised mark-up License Pages Reflecting Changes,Attached ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR L-99-121, Submits Data Point Library (Dpl) Changes,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,rev 1,Section 3.6, Administrative Implementation Reqiurements1999-07-28028 July 1999 Submits Data Point Library (Dpl) Changes,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394,rev 1,Section 3.6, Administrative Implementation Reqiurements L-99-118, Forwards Response to NRC AL 99-02,request for Info Re Estimate of Number of New Licensing Actions Expected to Be Submitted in Fy 2000 & 20011999-07-25025 July 1999 Forwards Response to NRC AL 99-02,request for Info Re Estimate of Number of New Licensing Actions Expected to Be Submitted in Fy 2000 & 2001 L-99-120, Forwards Annual Rept of Facility Changes,Tests & Experiments for BVPS Unit 1,IAW 10CFR50.59.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of Safety Evaluations1999-07-22022 July 1999 Forwards Annual Rept of Facility Changes,Tests & Experiments for BVPS Unit 1,IAW 10CFR50.59.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of Safety Evaluations L-99-119, Forwards Rev 17 to UFSAR for Beaver Power Station,Unit 1. Submittal Reflects Changes to Facility & Procedures as Described in UFSAR That Were Completed During Annual Reporting Period Endinig 9901221999-07-20020 July 1999 Forwards Rev 17 to UFSAR for Beaver Power Station,Unit 1. Submittal Reflects Changes to Facility & Procedures as Described in UFSAR That Were Completed During Annual Reporting Period Endinig 990122 1999-09-08
[Table view] Category:NRC TO ENGINEERING/CONSTRUCTION/CONSULTING FIRM
MONTHYEARML20059P0481990-09-27027 September 1990 Ltr Contract NRC-03-90-028,Task Order 2,definitizes Task Order IA-89-382, Final Response to FOIA Request for Records.App a Records Available in Pdr.App B Record Encl & Available in PDR1989-09-18018 September 1989 Final Response to FOIA Request for Records.App a Records Available in Pdr.App B Record Encl & Available in PDR ML20247N1321989-09-18018 September 1989 Final Response to FOIA Request for Records.App a Records Available in Pdr.App B Record Encl & Available in PDR ML20247G2781989-09-13013 September 1989 Partial Response to FOIA Request for Records.Apps F & G Records Available in Pdr.App H Records Partially Withheld & App I Record Completely Withheld (Ref FOIA Exemption 5) ML20247P9581989-08-0101 August 1989 Partial Response to FOIA Request.App a Records Available in Pdr.App B Records Encl & Available in PDR ML20206H0361988-11-18018 November 1988 Responds to to Chairman Zech Urging NRC to Proceed Immediately to Restart Pilgrim & License Seabrook. Restart & Licensing Will Not Take Place Until NRC Fully Satisfied That Safe Operations Can Be Performed ML20154H5231988-09-0909 September 1988 Forwards Rept of NRC Investigation Re Harassment & Intimidation of Authorized Nuclear Inspectors.Investigation Revealed That Four Authorized Operators Were Either Coerced, Pressured,Harassed or Intimidated by Mgt.W/O Encl ML20154A1521988-08-17017 August 1988 Final Response to FOIA Request for Documents.Forwards Documents Listed in App A.Documents Also Available in Pdr. App B Documents Totally Withheld (Ref FOIA Exemption 5).App C Documents Partially Withheld (Ref FOIA Exemption 5) ML20153F1951988-08-10010 August 1988 Partial Response to FOIA Request for Documents.App a Documents Available in Pdr.Nrc Reviewing Item F of Request ML20207E0771988-07-21021 July 1988 Final Response to FOIA Request for Documents Re Total Insp Hours & Total Number of Violations for Region IV Plants for CY87.Forwards App a Document.App a Document Also Available in PDR ML20151G1391988-07-19019 July 1988 Informs That Request for Withholding Proprietary Info from Public Disclosure Re Reactor Protection Sys Mod Granted. Reasons for Exemption Listed ML20196L5781988-06-16016 June 1988 Ack Receipt of Discussing Info Notice 88-021 on Inadvertent Criticalities.Discovery of Three Repts Dealing W/Three Events Mentioned in Ltr Noted ML20147G8591988-03-0404 March 1988 Partial Response to FOIA Request for Documents Re Regional Evaluation of Plant.Forwards App B Documents.App a & B Documents Available in PDR ML20147G2781988-03-0303 March 1988 Final Response to FOIA Request for All Documents Re NRC Investigation of Wg Dick Allegations About S&W & Lilco. Forwards App a & B Documents.Documents Available in Pdr.App C Documents Partially Withheld (Ref FOIA Exemption 6) ML20147B5101988-02-26026 February 1988 Partial Response to FOIA Request Re Pressure Vessel Surveillance Program.App a & B Documents Available in Pdr. Forwards App B Documents IA-87-807, Final Response to FOIA Request for Documents,Including Johnson Ltr to NRC Transmitting Rev 1 to LER 85-005.Forwards App B Document.App a & B Documents Also in Pdr.Nrc Not in Possession of Item 2 of Request1987-12-14014 December 1987 Final Response to FOIA Request for Documents,Including Johnson Ltr to NRC Transmitting Rev 1 to LER 85-005.Forwards App B Document.App a & B Documents Also in Pdr.Nrc Not in Possession of Item 2 of Request ML20237B8171987-12-14014 December 1987 Final Response to FOIA Request for Documents,Including Johnson Ltr to NRC Transmitting Rev 1 to LER 85-005.Forwards App B Document.App a & B Documents Also in Pdr.Nrc Not in Possession of Item 2 of Request ML20236V3351987-12-0101 December 1987 Final Response to FOIA Request for SECY-87-146 & SECY-87-164.App a Document Partially Withheld (Ref Exemtion 5).App B Document Totally Withheld (Ref FOIA Exemption 5) ML20236T2841987-11-25025 November 1987 Partial Response to FOIA Request for Encls to Listed Documents.App a Documents Encl & Available in Pdr.App B Documents Partially Withheld (Ref FOIA Exemption 6) ML20236U5291987-11-25025 November 1987 Final Response to FOIA Request for LERs for Listed Plants. App a Document Available in Pdr.Forwards Partially Withheld App B Documents (Ref FOIA Exemption 4) IA-87-711, Final Response to FOIA Request for LERs for Listed Plants. App a Document Available in Pdr.Forwards Partially Withheld App B Documents (Ref FOIA Exemption 4)1987-11-25025 November 1987 Final Response to FOIA Request for LERs for Listed Plants. App a Document Available in Pdr.Forwards Partially Withheld App B Documents (Ref FOIA Exemption 4) ML20236S4361987-11-20020 November 1987 Final Response to FOIA Request for Documents Listed in App A.Documents Also Available in PDR ML20236G9031987-11-0202 November 1987 Partial Response to FOIA Request.Forwards Documents Listed in App A.Documents Also Available in PDR ML20245C3591987-10-29029 October 1987 Requests Brief Note Expressing Desire to Remain on Mailing List.Response Requested Before 871120 ML20238E4021987-09-10010 September 1987 Final Response to FOIA Request.App a Documents Available in Pdr.Apps B & C Documents Partially Withheld (Ref FOIA Exemption 4) IA-87-410, Final Response to FOIA Request.App a Documents Available in Pdr.Apps B & C Documents Partially Withheld (Ref FOIA Exemption 4)1987-09-10010 September 1987 Final Response to FOIA Request.App a Documents Available in Pdr.Apps B & C Documents Partially Withheld (Ref FOIA Exemption 4) ML20238D1401987-09-0909 September 1987 Final Response to FOIA Request for Documents Re 790313 Order Shutting Down Facility Due to Concerns Re Over Stresses in safety-related Piping Sys & Supports.Forwards App E Documents.Documents Also Available in PDR ML20237H6231987-08-20020 August 1987 Partial Response to FOIA Request for Documents Re Plant Pipe Stress.Forwards App B Documents.App a Documents Available in Pdr.App B Documents Being Made Available in PDR ML20237J5101987-08-14014 August 1987 Partial Response to FOIA Request.App a Documents Re EA-86-09 for Comanche Peak Electric Station Available in Pdr.App B Documents Encl & Available in PDR ML20236K8851987-08-0404 August 1987 Final Response to FOIA Request for SECY-87-016.Forwards App a Document.Document Also Available in Pdr.Portions of SECY-87-016 Withheld (Ref FOIA Exemption 5) ML20236A8741987-07-21021 July 1987 Partial Response to FOIA Request Re Plant.App a Documents Available in Pdr.App B Documents Encl & Available in PDR ML20235B2661987-07-0101 July 1987 Final Response to FOIA Request for Documents Re Tech Specs. Forwards App B Documents.App a & B Documents Also Available in PDR ML20234D0481987-06-30030 June 1987 Partial Response to FOIA Request for Documents Re Status of Plants Readiness for Ol,Ie Manual,Chapter 94300.Apps a & B Documents Available in PDR & Encl.App C Documents Partially & Completely Withheld (Ref FOIA Exemption 5) ML20215F9981987-06-18018 June 1987 Final Response to FOIA Request.Documents in App a Already Available in Pdr.Documents in App B Being Made Available in PDR & Encl ML20214V9111987-06-0909 June 1987 Partial Response to FOIA Request for Documents Re Status of Preparedness for Licensing.Forwards App F Documents.App E & F Documents Available in PDR ML20214T1301987-06-0404 June 1987 Partial Response to FOIA Request for Region Input to NRR Re Status of Plant Readiness for Ol.Forwards App D Documents. App C & D Documents Also Available in PDR ML20214T0161987-06-0404 June 1987 Partial Response to FOIA Request.App Documents Re Diablo Canyon Available in Pdr.App T Documents Encl & Also Being Made Available in Pdr.App U & V Documents Partially & Completely Withheld Respectively (Ref FOIA Exemption 5) ML20214R4261987-06-0202 June 1987 Partial Response to FOIA Request for Info Re OL for Seabrook & Shoreham.Forwards App a Documents.App a & B Documents Available in PDR ML20214F4461987-05-15015 May 1987 Final Response to FOIA Request.App C Documents Available in Pdr.Forwards App D Documents Re Seabrook Probabilistic Safety Study.Addl Records Available in PDR in Folder FOIA-87-10.Records Referred to Another Agency for Review ML20214A8721987-05-14014 May 1987 Final Response to FOIA Request for Documents.Forwards App a Document.Document Also Available in PDR ML20213H1481987-05-14014 May 1987 Partial Response to FOIA Request for Documents Re USI A-46, Seismic Qualification of Equipment in Operating Plants. Forwards App B Documents.App a & B Documents Available in PDR ML20209A9891987-04-22022 April 1987 Final Response to FOIA Request.App a Documents Re Inservice Insp Repts for McGuire 1 & Surry 1 & NRC SALP Rept on Nine Mile Point 2 Encl & Being Placed in Pdr.App B Document Withheld (Ref FOIA Exemption 7) ML20206E2191987-04-0909 April 1987 Partial Response to FOIA Request for Documents.Forwards Apps G & H Documents.Records Also Available in Pdr.Portions of App G Documents Withheld (Ref FOIA Exemption 6).Documents Listed in Apps E & F Withheld (Ref FOIA Exemptions 2,5 & 7) ML20206H0391987-04-0909 April 1987 Forwards Control Room Evaluation Repts Released to Licensees,Per 870323 Request.Other Repts Will Be Forwarded When Released ML20211C0911987-02-17017 February 1987 Informs of Status of IE Bulletins 83-01 & 83-04 for Listed Plants.Based on Verbal Confirmation That Insp Repts Final, Closeouts for Cook,Kewaunee & Point Beach May Be Closed ML20211D5191987-02-12012 February 1987 Partial Response to FOIA Request.Forwards App M Documents. Apps L & M Documents Available in PDR ML20212J0961987-02-0909 February 1987 Partial Response to FOIA Request for Documents Re Facilities.Forwards App K Documents.Documents Also Available in PDR ML20210P0851987-02-0606 February 1987 Final Response to FOIA Request for Encls 1 & 2 to NRC Memo Re Facility Salp.Forwards App a Document ML20209H8151987-02-0202 February 1987 Partial Response to FOIA Request for Secy Papers Re Environ Qualification.App B Documents Available in Pdr.App C & D Documents Partially & Completely Withheld,Respectively (Ref FOIA Exemption 5) ML20209F7801987-01-28028 January 1987 Forwards Handouts Used During 870108 Meeting W/Cpc,Per 870115 Request 1990-09-27
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARIR 05000412/19990071999-10-21021 October 1999 Refers to Special Team Insp 50-412/99-07 Conducted from 990720-29 & Forwards Nov.Two Violations Identified.First Violation Involved Failure to Implement C/A to Prevent Biofouling of Service Water System ML20217M1591999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217C6741999-10-0808 October 1999 Forwards RAI Re Licensee 970128 Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, . Response Requested within 60 Days of Receipt of Ltr ML20217E0301999-10-0707 October 1999 Forwards Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violation Noted Involving Failure to Correctly Translate Design Change Re Pertinent Operating Logs & Plant Equipment Labeling ML20212M2661999-09-30030 September 1999 Forwards Order Approving Transfer of Licenses for Beaver Valley from Dlc to Pennsylvania Power Co & Approving Conforming Amends in Response to 990505 Application ML20216J9621999-09-30030 September 1999 Forwards Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Ncvs.One Violation Re Failure to Follow Operation Manual Procedure Associated with Configuration Control Identified ML20212K8071999-09-30030 September 1999 Informs That on 990916,NRC Staff Completed mid-cycle Plant Performance Review (PPR) of Facility.Staff Conducted Reviews of All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility ML20211Q3431999-09-0808 September 1999 Informs That During 990903 Telcon Between L Briggs & T Kuhar,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant,Unit 1.Insp Planned for Wk of 991115 ML20211Q5601999-09-0707 September 1999 Forwards Insp Rept 50-412/99-07 on 990720-29.Three Apparent Violations Noted & Being Considered for Escalated Ea. Violations Involve Failure to Implement C/As to Prevent bio- Fouling of Svc Water Sys ML20211A5111999-08-18018 August 1999 Forwards Insp Repts 50-334/99-04 & 50-412/99-04 on 990613- 990724.One Violation Noted & Treated as Non-Cited Violation Involved Failure to Maintain Containment Equipment Hatch Closed During Fuel Movement ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML20209G5701999-07-12012 July 1999 Discusses Closure of TACs MA0525 & MA0526 Re Response to RAI Concerning GL 92-0,Rev 1,Suppl 1, Rv Structural Integrity. Info in Rvid Revised & Released as Ver 2 as Result of Review of Response ML20207H6621999-07-0808 July 1999 Forwards RAI Re Util 981112 Response to IPEEE Evaluations for Plant,Units 1 & 2.RAI Was Discussed During 990628 Telcon in Order to Ensure Clear Consistent Understanding by All Parties of Info Needed ML20209D8191999-07-0707 July 1999 Forwards Insp Repts 50-334/99-03 & 50-412/99-03 on 990502- 0612.No Violations Noted.Program for Maintaining Occupational Exposures as Low as Reasonably Achievable (ALARA) & for Training Personnel,Generally Effective ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20207G2611999-06-0707 June 1999 Informs That NRR Has Reorganized,Effective 990328.Forwards Organizational Chart IR 05000412/19980091999-05-26026 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-412/98-09 ML20195C4461999-05-21021 May 1999 Forwards Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Were Identified.Licensee Conduct of Activities at Beaver Valley Power Station Characterized by Safe Conduct of Activities During Refueling Outage ML20206P1241999-05-14014 May 1999 Refers to Proposed Changes Submitted by Dl on 990316 to BVPS QA Program Described in BVPS-2 Ufsar,Chapter 17.2.Forwards RAI Re Proposed QA Program Changes ML20206N3161999-05-0606 May 1999 Responds to Ltr to NRC on Continued Events Re Transfer of Generation Assets Between Dl & Firstenergy.Info Will Be Considered as NRC Monitor Pending License Transfer Application of Bvps,Units 1 & 2 & Pnpp ML20206H7931999-04-30030 April 1999 Ack Receipt of 990426 Request for Enforcement Discretion & 990427 Withdrawal of Request for Enforcement Discretion. Resolution Documented.Enforcement Discretion Not Necessary ML20206B2751999-04-22022 April 1999 Forwards Insp Repts 50-334/99-01 & 50-412/99-01 on 990207- 0320.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20205R9071999-04-20020 April 1999 Forwards Second Request for Addl Info Re Response to GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves, for Beaver Valley Power Station,Units 1 & 2 ML20206A8381999-04-20020 April 1999 Forwards Reactor Operator Initial Exam Rept 50-412/99-301 on 990322-25.All Three Reactor Operator Applicants Passed. Initial Written Exam Submittal Was Determined Not to Meet NRC Guidelines in Certain Instances ML20205Q8311999-04-14014 April 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-11 & 50-412/98-11 Issued on 990225.Actions Will Be Examined During Future Insp of Licensed Program ML20205L0341999-04-0909 April 1999 Forwards SER Accepting Util 971209 & 980729 Submittal of Second 10-year Interval ISI Program Plan & Associated Relief Requests for Beaver Valley Power Station,Unit 2.TER Also Encl ML20205P2431999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Ltr Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival ML20205K0901999-04-0505 April 1999 Informs of Individual Exam Result on Initial Retake Exam Conducted on 990322-25 at Licensee Facility.Three Individuals Were Administered Exam & All Three Passed. Forwards Encl Re Exam.Without Encl ML20205R1791999-03-30030 March 1999 Responds to Issue Re Generic Implication of part-length Control Rod Drive Mechanism Housing Leak at Praire Island, Unit 2 & Beaver Valley Power Station,Units 1 & 2 ML20205C0301999-03-26026 March 1999 Informs That Util Responses to GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps Acceptable ML20204D7371999-03-16016 March 1999 Advises That RW Lindsey Authorized to Administer Initial Written Exams to Sh Cencic,Tf Lardin & Ta Pittas on 990322. Region I Operator Licensing Staff Will Administer Operating Tests ML20207E0201999-02-25025 February 1999 Forwards Insp Repts 50-334/98-11 & 50-412/98-11 on 981227- 990206 & Forwards Notice of Violations Re Uncontrolled Reduction of Main Condenser Vacuum ML20203D0691999-02-10010 February 1999 Forwards SE Accepting Approval of Proposed Revs to Plant QA Program Description in Chapter 17.2 of Updated Fsar,Per Util 981224 Submittal ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20206U3011999-02-0505 February 1999 Forwards Insp Repts 50-334/98-09 & 50-412/98-09 on 981116-1217 & Nov.Violation Identified Re Inadequate Design Control in Unit 2 Dc Voltage Drop Calculation ML20203A0811999-02-0404 February 1999 Forwards Request for Addl Info Re Review of Beaver Valley Power Station,Unit 1 License Amend to Allow one-time Extension of Steam Generator Insp Interval ML20199E6681999-01-14014 January 1999 Forwards RAI Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, for Plant,Units 1 & 2 ML20199F1961999-01-13013 January 1999 Forwards Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Informs That Overall Fire Protection Program Functioning Well ML20199F5101998-12-29029 December 1998 Discusses Third 10-year Interval ISI Program Plan & Associated Relief Requests for BVPS-1 Submitted by Dlc on 970917 & 980618.Informs That NRC Has Adopted Ineel Recommendations in TER INEEL-98-00893.Forwards SE & TER ML20198K5911998-12-24024 December 1998 Forwards Emergency Response Data Sys Implementation Documents Which Include Data Point Library Updates for Fermi (Number 268),Peach Bottom (Number 269) & Beaver Valley (Number 270).Without Encls ML20198K8251998-12-21021 December 1998 Forwards SER Granting Licensee 980611,as Suppl 981015 Pump Relief Request PRR-5 for Third 10-year IST Interval for Beaver Valley Power Station,Unit 1 Pursuant 10CFR50.55(a)(f)(6)(i) ML20198A1301998-12-0909 December 1998 Forwards SE Re USI A-46 Program Implentation for Plant Unit 1.Staff Concludes Program Implementation Met Purpose & Intent of Criteria in Generic Implementation Procedure 2 & Suppl SER 2 for Resolution of USI A-46 ML20198B1301998-12-0909 December 1998 Advises of Planned Insp Effort Resulting from Beaver Valley Power Station mid-year Insp Resource Planning Meeting Held on 981110.Historical Listing of Plant Issues & Details of Insp Plan for Next 6 Months Encl ML20196J2761998-12-0404 December 1998 Forwards Corrected Pages 17 & 18 of NRC Integrated Insp Repts 50-334/98-06 & 50-412/98-06 for Exercise of Enforcement Discretion ML20196H3051998-12-0202 December 1998 Forwards Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Conduct of Activities at Beaver Valley Power Station Facilities Characterized by Safe Plant Operations ML20196H2781998-12-0202 December 1998 Forwards Insp Repts 50-334/98-08 & 50-412/98-08 on 981026- 30.No Violations Noted.Plant Operations Witnessed by Team Were Conducted in Safe & Controlled Manner ML20196G9921998-12-0101 December 1998 Forwards Ltrs from Fk Koob, to JW Pack & CF Wynne Re Plant Deficiencies Assessed During 981006 Exercise Against Hancock County,Wv & Beaver County,Pa,Respectively ML20196D4371998-11-25025 November 1998 Discusses Concerns Re Announced Asset Transfer Between Firstenergy Corp & Duquesne Light Co ML20196A7101998-11-24024 November 1998 Forwards Notice of Withdrawal of Amend to License NPF-73. Proposed Change Would Have Extended on one-time Only Basis, Surveillance Interval for TSs 4.8.1.1.1.b & 4.8.1.2 Until First Entry Into Mode 4 Following Seventh Refueling Outage ML20195K3331998-11-18018 November 1998 Informs That Effective 981214,DS Collins Will Become Project Manager for Beaver Valley Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
- _ _ _ _ _ _ _ _ - _ _ . _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ __
U S. NUCLEAR REGULATORY COMMISSION Nuc sca ntuutu Nuvaine
. . F01A-87-807
- [..~.sk / Rt$ PONS! TYPt f# 5 RESPONSE TO FREEDOM OF M"*^'
^"
I I"' * '
"E' / INFOFN WON ACT (FOIA) REQUEST
%. ggg 1 4 1987 i,
..... r 5 ooat t Nuustn+ urerac.w atOUESTM Hr.dyle Graber PART 4.-RECORDS RELEASEO OR NOT LOCATED (See checked bones) -
No agency e sco, Js subtect to the request t-eve been located-No additeor,al agency records subiect to the request have been located X
' * " ' ' ' ' ' ' ' * * " ' ' ' ' **""''"*d'"^***"d'"
^1717 H St'est, N W.,W p V 'p'"n, DC A '"d**''''""'" "'^#'""8'"""C""' '"**"'"*-
Agency records sublect to the request thet are identifed in Appendia b are being made available for public mpection and copying in the NRC Pubhc Document Room,1717 H Street. N W.. Washington, DC, in e aloer unoer this FOIA number and requester name The n< proprietary varaion of the proposal (s) that you agreed to accept in a telephone conversation with a rrember of my sta ff is now being made availabie for public enspecteon and coying at the NRC Public Document Room,1717 H Street. N W , Washington, DC , in a fomer under this FOIA numbe and 'equester name.
Enclosed es information on how rou may obtain access to and the charges for copying records placed in the NRC Pubhc Docu nent Room,1717 H Street, N W., Washington, DC.
Agency records subject to the request are enclosed. Any apphcable charge for copes of the records provided and payment .nocedures are noted in the comments sectson Recorde subtect to the request have been referred to another Federal agencybes) for review and direct response to you.
in view of PRC's response to the request, no further action a beeng taken on appeal letter dated ;
i PART ll A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE _
I
\
Certain Information it' the teoW records e being withheld from pubhc desclosure pursuant to the FOIA anemptions desenbad in and for the reasons stated in Part II, sec- l
< sons e. C and D An, reieasee %rtions of the documents for which oniy part of ine reco,d s be,no w,thheid are being made avai i ebie for pubhc inspection and copying ni ;
the NRC Pubhc Document Room, '.717 ** Street, N W . Washington. OC, in a folder under this FOI A number and requester name l
. I Comments 1
i A search of pertinent files indicates that the NRC is not in possession of Item l No. 2 of your requet+. ,
I s ,
- l l
l'
\
l e
+
871P370175 071214 FOR FOIA GRf0EHO7-807 PDR
, 's i
' > g
, .E de% - w h:&
NRC FORM 4 4t> (
n u
, .\
g ., - - .s ,. ,, . - --y
,y ~ q r,, ,
.llid:' F01 A.87-807 APPENDIX A ,
-v.
.c RECORDS MAINTAINED AM0hG'0DR FILES I
NUMBER DATE DCJt2!PTION ITEM N01-3
. ftIf
- 1. 9/17/87' Letter from Johnson to NRC transmitting fy, .
LER 005 Revision 1. (3 pay,Q M , PDR Accession No. 87092203M 1 i. .!
.L <. ,
i
,, 1.
7.
!' j i
f 9
/ I L
T t'
- - \'
'1 I '
l '
h kii
- i. 1 f
,}
7 i
+
F ,
\
l
I
?
j Re: FOIA 87-807 _
L APPEND:t B j RECORDS BEING PLACED IN THE PDR Date_ Description i ITEM NO. 1
- 1. 9/23/87 Enclosure to MC letter transmitting Amendment No.1 to Facility Operating License on Beaver Valley 2 (Accession No. 8710080457) - (8 pages)
l.
! 6. .
4 }/* "*'%o UNITED STATES
[ g NUCLEAR REGULATORY COMMISSION
- . t; y WASHINGTON, D. C. 20655 ,
A..../
i f DUQUESNE LIGHT COMPANY OHIO EDISON COMPANY c
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY THE TOLEDO EDISON COMPANY DOCKET NO. 50-412 BEAVER VALLEY POWER STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 1 License No. NPF-73
- 1. The Nuclear Regulatory Commission (the Comission) has found that:
A. The application for amendment by Duquesne Light Company *, Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company (the licensees) dated July 14, 16, 22, 31 September IA (3 letters), 17 and 18, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; N B. The facility will operate in conformity with the application, the e,
provisions of the Act, and the rules and regulations of the Commission;
"! C. There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endar.gering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51'of the Comission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by the addition of paragraph 2.B.(7) as indicated in the attachment to this license amendment.
Duquesne Light Company (DLCo) is authorized to act as agent for Ohio Edison ,
Company, The Cleveland Electric Illuminating Company, and The Toledo Edison ;
Company and has exclusive responsibility and control over the physical ,
construction, operation, and maintenance of the facility.
g aom gy \
'c 2-
- 3. This amendment is effective on issuance.
FOR THE NUCLEAR REGULATORY COMISSION l 1 l
1 0)20A1 1
, . . e n n .- ga r Division of Reactor ects I/II
Attachment:
Pages 3 and 3a of License Date of Issuance: September 23, 1987 T
~ er n
l f I L - - _ --- _ --- - _ a
. , ~.
l
y ..
y
, (2) Pursuant to the Act and 10 CFR Part'50, Ohio Edison Company, The Cleveland Electric Illuminating Company, and The Toledo Edison Company to possess the facility.at the designated i location in Beaver County, Pennsylvania, in accordance with p the procedures and limitations set forth in the" license;,
-(3)- Pursuant to the Act and 10 CFR Part 70, Duquesne Light Company to receive, possess, and use at any time special nuclear material as' reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended;
.(4). Pursuant to the Act and 10 CFR Parts 30, 40, and 70, Du'quesne Light Company to receive, possess, and use at any time any byproduct, source, and special nuclear material such as sealed.
neutron sources for reactor startup,' sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) Pursuant to the Act and 10 CFR Parts 30, 40, and 70. Duquesne
, Light Company to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample
-analysis or instrument calibration or other activity associated with radioactive apparatus or components; (6) Pursuant to the Act and 10 CFR Parts 30, 40, and 70, Duquesne Light Company to possess, but not separate, such byproduct and
. special nuclear materials as may be produced by the operation
- f. , of the facility authorized herein. 1
[ (7) '(a) Duquesne Light Company Ohio Edison Company The Cleveland r
Electric Illuminating Company and The Toledo Edison Company are authorized to transfer any portion of their respective 13.74%, 41.88%, 24.47% and 19.91% ownership interests in BVPS Unit 2 and a proportionate share of their ownership interests in the BVPS comon facilities to certain potential investors identified in their submittals of July 14, 16, 22 and 31, and September 14,17 and 18,1987, and at the same time to lease back from such purchasers such interest transferred in the BVPS Unit 2 facility. The tenn of the lease is for approximately 29-1/2 years subject to a right of renewal. Such sale and leaseback transactions are subject to the representations and conditions set forth in the aforementioned submittals. Specifically, a lessor and anyone else who may acquire an interest under these transactions are prohibited from exercising directly or indirectly any control over the license of BVPS Unit 2.
For purposes of this condition the limitations in 10 CFR 50.81, as now in effect and as may be subsequently amended, are fully applicable to the lessor and any successor in interest to that lessor as long as the license for BVPS Unit 2 remains in effect; these financial Amendment No. 1
0
- 3a -
transactions shall have no effect on the license for the BVPS Unit 2 facility throughout the term of the license.
(b) Further, the licensees are also required to notify the NRC in writing prior to any change in: (1) the term or conditions of any)
(11 thelease agreements BVPS Operatingexecuted Agreement, as part of these (iii) the transactions; existing property insurance coverage for BVPS Unit 2, and (iv) any action by a lessor or others that may have an adverse effect on the safe operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Comission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Comission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level DLCo is authorized to operate the facility at reactor core power levels not in excess of 2652 megawatts thermal (100 percent power) in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this
. license. DLCo shall operate the facility in accordance with the
- , Technical Specifications and the Environmental Protection Plan.
l Amendment No. I l
l~ - - --
. ~:
., *g UNITED STATES
,,. J' g NUCLEAR REGULATORY COMMISSION
.L ,j. L WASHINGTON, D. C 20655 A...../
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION
-SUPPORTING AMENDMENT NO. 1 TO FACILITY OPERATING LICENSE NO. NPF-73 DUQUESNE LIGHT COMPANY THE OHIO EDISON COMPANY THE CLEVEL 6 MG COMPANY TOLEDD EDISOM COMPANY BEAVER YAllTDWIT5TATTE UNIT 2 -
DOCKET NO. 50-412
1.0 INTRODUCTION
By letters dated July 14,'16, 22 and 31, 1987, September 14. (3 letters),
17 and 18 1987, the licensees (named above) requested approval to sell and lease back parts or all of their ownership interests in Beaver Valley Power Station', Unit 2 (BVPS-2) and associated comon facilities. The basic tem of the leases is expected to be approximately 291/2 years and the licensees will have the option to renew each lease for at least two years.
2.0 DISCUSSION AND EVALUATION Duquesne. Light Company (DLC), one of the owners, is the only authorized
, agent to have exclusive responsibility and control over the physical
'- construction, operation and maintenance of the faellity.
The sale and leaseback transactions described in these applications are similar in all significant respects to the transactions previously approved by the Commission with respect to various ownership interests in the Palo Verde Nuclear Generating Station (PVNGS). The first of these involved the sale and leaseback transactions by the Public Service Company of New Mexico relative to PVNGS Unit I which were authorized by an amendment to the PVNGS Unit 1 license on December 26, 1985 (see 51 FP.
1883). Since then, additional similar transactions were authorized for PVNGS Unit l'by license amendments issued on June 2, 1986, and December 1, 1986, and for PVNGS Unit 2 by license amendments issued on August 12, 1986, August 15, 1986, and December 11, 1986. These amendments all contain license conditions identical to those which were included in the aforementioned December 26, 1985 amendment pursuant to a Counission order of December 12, 1985.
l Subsequent to the above amendments, the Commission issued a similar amendment to the Cleveland Electric Illuminating Company, part-owner of the Perry Nuclear Power Plant, Unit No. 1 on March 16, 1987.
[
The licensees proposed that the BVPS-2 license be amended in the same manner by adding the following new paragraph 2.8.(7):
L _-_- _ _
. . 4 (7)(a) Duquesne Light Company, Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company are authorized to transfer any portion of their respective 33.74%, 41.88%, 24.47% and 19.915. ownership interests in BVPS Unit 2 and a proportionate share of their ownership interests in the BVPS connon facilities to certain potential equity investors identified in their submittals of July 14,16, 22, 31, September 14, 17 and 18, 1987, and at the same time to lease back from such purchasers such interest transferred in the BVPS Unit 2 facility. The term of the lease is for approximately 29-1/2 years subject to a right of renewal..
Such sale and leaseback transactions are subject to the representations and conditions set forth'in the aforementioned submittals. Specifically, a lessor and anyone else who may I acquire an interest under these transactions are prohibited from exercising directly or indirectly any control over the license of BVPS Unit 2. For purposes of this. condition the limitations in 10 CFR 50.81, as now in effect and as may be subsequently amended, are fully applicable to the lessor and
' any successor in interest to that lessor as long as the license for BVPS Unit 2 remains in effect; these financial transactions shall have no effect on the license for the BVPS Unit 2 facility throughout the tem of the license.
l (b) Further, the licensees are also required to notify the NRC in writing prior to any change in: (1) the term or conditions of any)
(ii thelease BVPS agreements executed as (iii)
Operating Agreement, partthe of existing' these transactions; property insurance coverage for BVPS, Unit 2, and (iv) any action by a
. lessor or others that may have an adverse effect on the safe operation of the facility.
Consistent with the above condition 2.B.(7), the licensees' various submittals stated that: "Neither the owner trustee nor any of the equity investors will have (1) any ability to restrict or inhibit compliance with she security, safety, or other regulations of the Commission, (ii) any capacity to control the use or disposal of BVPS Unit 2 nuclear fuel, or (iii) any right to use or direct the use of BVPS Unit 2 or any other part of BVPS Unit 2. The current regime of control, supervision, and responsibility will be unaltered by the proposed transactions. DLC is and will remain responsible to the Commission for the proper operation and maintenance of Unit 2."
Our review of the application materials reveals no infomation that reflects negatively on the licensees' financial qualifications under the license. Indeed, the source of funds for unit operating and maintenance expenses will be unaffected by the transactions. That source is the utility revenues derived from the regulated rates charged to utility customers. The utility licensees will continue to be responsible for their pro-rata shares of all nuclear unit costs under provisions of the Beaver Valley Power Station Operating Agreement. Any needed capital improvements or additions to the nuclear unit would be financed by the
~
- .L '
q utility licensees as at present through a combination of internally generated funds (derived from customer revenues) and security issues..
. The equity investor-lessors, through agreement with the utility i
,1icensees, may opt to provide capital for such improvements or ,
additions.. The proposed sale / leaseback is a capital refinancing '
mechanism that does not impair the licensees' financial capability to comply with NRC requirements.
. The. licensees' submittals of September 14 and 18,1987, identified who the potential investors might be but discussions with these' investors are continuing. The -licensees, however, stated that. some investors may be affiliates and subsidiaries of electric utilities, thus raising the question of antitrust possibilities. The staff determined that where the investor owners do not acquire the right to electric power generation at the facility, and such electricity will continue to be distributed in the same manner as is now set forth in the operating agreement "the transaction does not present any antitrust considerations not previously considered at the time of the license." (SECY-85-367 at 9). The potential sale.to investors who are affiliates and subsidiaries of electric utilities described above would he fully consistent with the policy. stated above in
'SECY-85-367. None of the potential investors identified in the licensees' letters are foreign corporations.
3.0 CONTACT WITH STATE'0FFICIAL i The Connonwealth of Pennsylvania has been advised of the proposed determination the amendment (Phone of no significant call with Mr. hazards considerations R. Janati, August 24, 1987 . withNo rec)ard to comments were received.
4.0 ENVIRONMENTAL CONSIDERATION
S This amendment-only involves the administration of the credit and r financial arrangements for BVPS, Unit 2. The parties will enter into agreements which provide for the sale and lease back of ownership shares by the licensees under tems requiring continued full control and responsibility over these ownership shares by the licenstes. The lessors and anyone else who may acquire an interest under these transactions are prohibited from exercising directly or indirectly, any control of the license. The amendment also includes a reporting requirement.that the NRC must be notified in writing prior to any change in the executed lease agreements, the BVPS, Unit 2 participation agreement, the existing
. insurance policies or any action by a lessor or others that may have an adverse effect on the safe operation of the facility. Accordingly this amendment meets the elig)ibility criteria for categorical exclusion set forth in 10 CFR 51.22 (c (10). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.
5.0 CONCLUSION
l The staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and
r, t
, i.
(2) such activities will be conducted in compliance with the Commission's regulations and (3) the issuance of amendments will not be inimical to the common defense and security or to the health and safety of the public.
We, therefore, conclude that the requested authorization is acceptable.
Dated:
i Principal Contributors: '
James C. Petersen, Senior Financial Policy Analyst
- Peter S. Tam, Project Manager l George Johnson, Legal Counsel Benjamin Yogler, Legal Counsel I
<=.