Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000458/19900311990-11-19019 November 1990 Insp Rept 50-458/90-31 on 901105-09.No Violations or Deviations Noted.Major Areas Inspected:Verification of Isolation Component Exemptions IR 05000458/19900251990-11-0707 November 1990 Insp Rept 50-458/90-25 on 900924-28 & 1015-19.Noncited Violation Identified.Major Areas Inspected:Quality Verification Function Including Condition Rept Program, Internal Audit Program ML20058A5461990-10-17017 October 1990 Insp Rept 50-458/90-23 on 900910-14.No Violations or Deviations Noted.Major Areas Inspected:Engineering Evaluation in Response to NRC Bulletin 88-004,action of Previously Identified Items & Review of Root Cause Analysis IR 05000458/19900281990-10-17017 October 1990 Insp Rept 50-458/90-28 on 901009-12.No Violations or Deviations Noted.Major Areas Inspected:Installation & Testing of Mods & Installation of Heat Shrinkable Insulation Tubing IR 05000458/19900221990-09-27027 September 1990 Insp Rept 50-458/90-22 on 900827-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Liquid & Gaseous Radwaste Mgt Program ML20059D6471990-08-28028 August 1990 Insp Rept 50-458/90-15 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Followup to Previous Insp Findings & Equipment IR 05000458/19900201990-08-21021 August 1990 Insp Rept 50-458/90-20 on 900723-26.No Violations or Deviations Noted.Major Areas Inspected:Training & Qualification Effectiveness IR 05000458/19902001990-07-26026 July 1990 Electrical Distribution Sys Functional Insp Rept 50-458/90-200 on 900521-0622.No Violations Noted.Major Areas Inspected:Design & Implementation of Plant Electrical Distribution Sys & Adequacy of Engineering Support IR 05000458/19900171990-07-19019 July 1990 Advises That Insp 50-458/90-17 Canceled,Therefore,No Insp Rept Will Be Issued IR 05000458/19900141990-06-19019 June 1990 Insp Rept 50-458/90-14 on 900521-22.One self-identified Violation Noted.Major Areas Inspected:Licensee Occupational Radiation Protection Program Including High Radiation Area Controls IR 05000458/19890331989-09-21021 September 1989 Insp Rept 50-458/89-33 on 890801-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Test Observation,Ler Followup & Followup on 10CFR21 Repts IR 05000458/19890311989-08-29029 August 1989 Insp Rept 50-458/89-31 on 890701-31.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Test Observation,Esf Walkdown & Emergency Preparedness Drill IR 05000458/19890301989-08-17017 August 1989 Insp Rept 50-458/89-30 on 890619-23.Violations Noted.Major Areas Inspected:Physical Security Program IR 05000458/19890191989-08-10010 August 1989 Advises That Insp 50-458/89-19 Cancelled & No Insp Rept Will Be Issued for Rept Number IR 05000458/19890321989-07-31031 July 1989 Insp Rept 50-458/89-32 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Testing Program & Plant Instrumentation Calibr Program.Lists of Surveillance Test Performance & Loop Calibr Repts Encl IR 05000458/19890281989-07-27027 July 1989 Insp Rept 50-458/89-28 on 890601-30.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation & Licensee Action on Previous Insp Findings IR 05000458/19890251989-07-27027 July 1989 Insp Rept 50-458/89-25 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing. Conservative Error in Util Procedure for Manual Calculations of Core Thermal Power Identified IR 05000458/19890291989-07-14014 July 1989 Insp Rept 50-458/89-29 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Corrective Actions IR 05000458/19890271989-07-12012 July 1989 Insp Rept 50-458/89-27 on 890605-09 & 19-23.Violations Noted.Major Areas Inspected:Self Assessment Capabilities IR 05000458/19890241989-06-26026 June 1989 Insp Rept 50-458/89-24 on 890501-31.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification & Maint & Surveillance Test Observation IR 05000458/19890221989-06-20020 June 1989 Insp Rept 50-458/89-22 on 890525-27.No Violations or Deviations Noted.Major Areas Inspected:Containment Integrated Leak Rate Test & Review of Results of Local Leak Rate Test IR 05000458/19890261989-06-14014 June 1989 Insp Rept 50-458/89-26 on 890515-19.No Violations Noted. Major Areas Inspected:Action on Previously Indentified Insp Findings,Inservice Insp Data Review & Corrective Actions IR 05000458/19890011989-06-0707 June 1989 Insp Rept 50-458/89-01 on 890501-05.No Violations Noted. Major Areas Inspected:Facility Mods & Nonlicensed Staff Training ML20244C3561989-06-0505 June 1989 Insp Rept 50-458/89-18 on 890501-05 & 15-19.Violations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves,Welding Activities Associated W/Repairs to Svc Water Sys & Activities Re Instrument Air Sys Insp IR 05000458/19890231989-05-25025 May 1989 Insp Repts 50-458/89-23 on 890501-05.No Violations or Deviations Noted.Major Areas Inspected:Programs for Station Design Changes & Mods for Installation of Raychem Electrical Splices IR 05000458/19890111989-05-24024 May 1989 Insp Rept 50-458/89-11 on 890315-0430.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation,Refueling Activities & Licensee Action on Previous Findings IR 05000458/19890171989-05-16016 May 1989 Insp Rept 50-458/89-17 on 890409-19.Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Planning & Preparation for in-reactor Pressure Vessel Repair of Feed Water Spargers ML20244D4511989-05-15015 May 1989 Partially Withheld Insp Rept 50-458/89-15 on 890402-06 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support,Security Program Plans & Audits & Protected & Vital Area Access IR 05000458/19890131989-05-15015 May 1989 Advises That Insp Rept 50-458/89-13 Cancelled.No Rept Will Be Issued for Rept Number IR 05000458/19890211989-05-10010 May 1989 Insp Rept 50-458/89-21 on 890424-28.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Test Observation & Followup on Operating Events IR 05000458/19890101989-05-0909 May 1989 Insp Rept 50-458/89-10 on 890327-0406.No Violations or Deviations Noted.Major Areas Inspected:Review of Inservice Insp,Welding & Associated Documents & Procedures.Mod to RHR Sys Also Reviewed IR 05000458/19890141989-04-20020 April 1989 Insp Rept 50-458/89-14 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Testing of Pipe Supports & Restraint Sys ML20244B6001989-04-0606 April 1989 Insp Rept 50-458/89-12 on 890327-31.Violation Noted.Major Areas Inspected:Welding Activities.Welding Program Well Defined & Includes Monitoring by Qc.Weakness in Welder Qualification Program Noted IR 05000458/19890071989-04-0505 April 1989 Insp Rept 50-458/89-07 on 890201-0314.No Violations or Deviations Noted.Major Areas Inspected:Plant Events, Emergency Preparedness Exercise,Operational Safety Verification & Surveillance Test Observation IR 05000458/19890091989-03-30030 March 1989 Insp Rept 50-458/89-09 on 890301-03.No Violations or Deviations Noted.Major Areas Inspected:Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000458/19890081989-03-10010 March 1989 Insp Rept 50-458/89-08 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Calibr Program, Emergency Diesel Fuel Oil Program Into QA Program & Receipt, Storage & Handling of Diesel Generator Fuel Oil IR 05000458/19890061989-03-0808 March 1989 Insp Rept 50-458/89-06 on 890206-10.No Violations or Deviations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves IR 05000458/19890051989-02-24024 February 1989 Insp Rept 50-458/89-05 on 890101-31.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Radiological Protection,Security,Surveillance Test Observation & Maint Observation IR 05000458/19890031989-02-23023 February 1989 Informs That Insp 50-458/89-03 Cancelled.No Insp Rept Will Be Issued for Subj Rept Number IR 05000458/19880291989-01-31031 January 1989 Partially Withheld Insp Rept 50-458/88-29 on 881212-16 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program Included Mgt Support, Security Program Plans,Audits & Records & Repts IR 05000458/19880191988-10-14014 October 1988 Insp Rept 50-458/88-19 on 880801-0917.Violation Noted.Major Areas Inspected:Surveillance & Maint Observation,Safety Sys Walkdown,Operational Safety Verification,Radiological Protection Observation & Security ML20155G8291988-10-0303 October 1988 Insp Rept 50-458/88-21 on 880912-15.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program ML20155E2471988-09-27027 September 1988 Insp Rept 50-458/88-22 on 880829-0915.Violations Noted.Major Areas Inspected:Fuel Bldg Ventilation Charcoal Filtration Sys IR 05000458/19880201988-09-14014 September 1988 Insp Rept 50-458/88-20 on 880822-25.No Violations Noted. Details Withheld (Ref 10CFR73.21) ML20153E4051988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records IR 05000458/19880181988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records ML20151Z8021988-08-22022 August 1988 Partially Withheld Insp Rept 50-458/88-14 on 880613-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Lers, Allegations,Security Procedures,Mgt Effectivenss,Security Program Audits & Records & Repts IR 05000458/19880171988-08-12012 August 1988 Insp Rept 50-458/88-17 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on NRC Bulletin 88-005,surveillance Test & Maint Observation, Operational Safety Verification & Security IR 05000458/19880161988-07-27027 July 1988 Insp Rept 50-458/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Release Program & Allegations Re Training & Qualifications of Supervisory Personnel ML20151G0971988-07-15015 July 1988 Insp Rept 50-458/88-13 on 880501-0630.Violation Noted.Major Areas Inspected:Previous Insp Findings,Nrc Bulletins 88-001 & 88-007,NRC Info Notices,Surveillance Test Observation, Maint Observation & Safety Sys Walkdown 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support ML20212L9771999-10-0505 October 1999 Notice of Violation from Insp on 990710.Violation Noted:From 990224-0325,River Bend Station Operated in Mode I Without Three Operable EDGs IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20205A4131999-03-23023 March 1999 NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222- 0303.All 14 Applicants Passed Exams ML20203A5351999-01-27027 January 1999 EN-99-005:on 990201,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Two Severity Level III Violations Involving Design Deficiency,Caused Uncertainty as to Ability of Div I & II IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E2111999-01-0707 January 1999 Notice of Violation from Insp on 981101-1212.Violation Noted:On 971022,radiation Protection Technicians Released One Container with Two Items Contaminated Above Limits Specified in Procedure RSP-0213 ML20199A2161999-01-0505 January 1999 Notice of Violation from Investigation Conducted on 971231. Violation Noted:On 971015,A Wells,Employee on Entergy Operations,Inc,Submitted to NRC Info Known to Be Inaccurate in Some Respect Matl to NRC ML20198T0691999-01-0505 January 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Info Was Provided to Senior Resident Inspector That Was Not Complete & Accurate in All Matl Respects Re 971010 of RWP 97-0002 ML20203A6601999-01-0505 January 1999 EN-99-001:on 990105,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Violation Involving Superintendent of Radiation Control at Licensee River Bend Station Facility ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9151998-12-29029 December 1998 Notice of Violation from Insp on 980720-0807.Violation Noted:On 980724,licensee Made Change to Facility as Described in Safety Analysis Rept,Which Created Unreviewed Safety Question,Without Prior Commission Approval IR 05000458/19980991998-12-22022 December 1998 SALP Rept 50-458/98-99 Canceled.Process Suspended for Two Yrs.No Insp Rept Will Be Issued for Number IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20154L7021998-08-17017 August 1998 Corrected Notice of Violation from Insp Completed on 980218. Corrected NOV Sent to Make Consistent with Ltr Sent on 980722 & to Make Clear That No Response Required ML20236V2081998-07-29029 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980601,while Accomplishing Clearance Order 98-0583, Operator Did Not Follow Sequence Shown on Clearance Order While Positioning Components IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154M5531998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980323. Violation Noted:On 970908,WJ Ginn,Employee of Contractor to Entergy Operations,Inc,Deliberately Submitted Info to Licensee That Was Incomplete & Inaccurate ML20154L7351998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980218. Violation Noted:On 970711,DL Brown Employee of Contractor to Util Deliberatly Submitted Info to Licensee That Brown Knew Incomplete & Inaccurate on Security Questionnaire IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4461998-04-17017 April 1998 Notice of Violation from Insp on 980222-0404.Violation Noted:Established Measures Did Not Assure That Deviation from Environ Design Criteria Was Controlled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support PNO-IV-98-016, on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing1998-04-14014 April 1998 PNO-IV-98-016:on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing ML20217B4701998-03-24024 March 1998 Notice of Violation from Insp on 980223-26.Violation Noted: Licensee Not Maintained Records of Reviews of Radiation Protection Program Content & Implementation ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability 1999-09-08
[Table view] |
See also: IR 05000458/1986020
Text
. _ __ _ . _ .
.
,
APPENDIX B
, U. S. NUCLEAR REGULATORY COMMISSION
<
REGION IV
NRC Inspection Report: 50-458/86-20 License: NPF-47
'
Docket: 50-458
Licensee: Gulf States Utilities Company (GSU)
P. O. Box 2951
Beaumont, Texas 77704
Facility Name: River Bend Station (RBS)
Inspection At: River Bend Station, St. Francisville, Louisiana
Inspection Conducted: May 1 through June 15, 1986
Inspectors: {
D. D. diamberlain, Senior Resident Inspector
'
Date
(pars. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 and 12)
% , ~
W. B.FJones, Resident inspector l
b'h$b
Date
(pars. 1,2,3,4,5 6,7,8 9, and 11)
/
'
Approved: _ _ /w MYl 72 Y/[
J./.Jfudon,Ghiel,ProjectSectionA Dafe /
Eeactor Proj& cts Branch
8608050087 860730
, PDR ADOCK 05000458
G PDR
't
. . , - - ,- r__- ,_-.r,_m..-,.m-m_ _,.,_..,m , _y _, ,. . - - , , _ _ _ , , . , . ,, . . - _
.
-2-
Inspection Summary
Inspection Conducted Iby 1 through June 15, 1986 (Report 50-458/86-20)
Areas Inspected: Routine, unannouncad inspection of licensee action on
previous inspection findings, status of operating license conditions,
Nuclear Review Board activities, startup test witness, safety system
walkdown, operational safety verification, maintenance witness, surveillance
witness, licensee plans for coping with strikes and status of IMI action
item.
Results: Within the ten areas inspected, two violations were idantified
(failure to follow administrative procedures for issue of temporary
change notices, paragraph 9, and failure to implement procedures to
maintain safety system drawing configuration, paragraph 6).
_- - __ - ____-_
-
o
-3-
DETAILS
1. P_ersons Contacted
Principal Licensee Employees
M. Arant, Technician, Ir.strumentation and Control (I&C)
- R. J. Backen, Supervisor (Acting), Operations Quality
' Assurance (QA)
W. J. Beck, Supervisor, Reactor Engineering
- W.E H. Cahill, Jr. , Senior Vice President, River Bend
Nuclear Group
- E. M. Cargill, Supervisor, Radiation Programs
- T. C. Crouse, Manager, QA
- J. R. Cummings, Procedure Coordinator,
- P. E. Freehill, Superintendent, Startup and Test
A. O. Fredieu, Assistant Operations Superviser
P. F. Gillespie, Senior Compliance Analyst
D. R. Gipson, Assistant Plant Manager, Operations
- E. R. Grant, Supervisor, Nuclear Licensing
- B. R. Hall, Supervisor, Plant Services,
- R. W. Helmick, Director, Projects,
- G. K. Henry, Supervisor, Electrical Engineering i
K. C. Hodges, Supervisor, Quality Systems
- R. J. King, Licensing Engineer
- A. D. Kowalczuk, Assistant Plant Manager, Maintenance
- W. H. Odell. Manager, Administration
- T. F. Plunkett, Plant Manager
- S. R. Radebaugh, Assistant Plant Manager, Services
W. J. Reed, Director, Nuclear Licensing
D. Reynerson, Director, Nuclear Plant Engineering (NUPE)
N. Simpson, Technician I&C
- M. H. Small, Acting Supervisor, Operations Quality Control (QC)
R. B. Stafford, Director, Operations QA
- K. E. Suhrke, Manager, Projects
^ P. c. Tomlinson, Director, Quality Services
D. Williamson, Operations Supervisor
The NRC senior resident inspector (SRI) and resident inspector (RI) also
interviewed additional licensee personnel during the inspection period.
- Denotes those persons that attended the exit interview conducted on
June 19, 1986. NRC Region IV Section Chief, J. P. Jaudon, NRC resident
inspector (RI), W. B. Jones and Nuclear Reactor Regulation (NRR)
licensing Project Manager, S. Stern also attended the exit interview.
.
-4-
2. Licensee Action on Previous Inspection Findings
a. (Closed) Violation (458/8569-01): Failure of design document control
program.
i s
This violation was a failure to post approved design changes against
the effected design documents and a failure to distribute design
change documents to document control stations. NUPE revised
procedures NUPE-AA-54 and 59 to provide more control for the posting
and routing of design change documents. A 100 percent audit of
s design change files was conducted, and all noted discrepancies were
-
?' corrected. Training was conducted on the revised procedural
requirements, and-subsequent quality assurance surveillances revealed
no recurrence of.the problem. The SRI reviewed the revised
-
. ,
procedu'res and,the"other corrective actions.
This, viol'ation is_ closed.
~
~
_ b. (Closed) Violation (458/8569-02): Improper use of a field change
, , notice.
'
NUPE issued procedure NUPE-AA-64, " Control and Approval of Field
Change Notices (FCN's)" which provides detailed instructions and
'
restrictions for the use of FCNs. The licensee had conducted an
audit of the design change files and the discrepancies noted had been
corrected. Training of NUPE personnel responsible for completing
FCN's had been completed.
This violation is closed.
i
c. (Closed) Violation (458/8604-01): Failure to control temporary
circuit alterations administratively. .
The licensee actions in response to this violation included: a
complete inspection of control room panels for unauthorized lifted
leads or jumpers; QC hold points included in electrical maintenance
work requests to inspect for proper restoration; implementation of a
main control room cabinet access and work monitoring program; the
change of control room panel locks; a maintenance procedure revision
serialized tagging of any lifted lead or jumper for accountability
and the temporary alterations program was suspended and replaced by
design modification request procedures. The SRI has monitored
licensee actions relative to temporary alterations, and the
additional controls appear to be effective.
! Ihis violation is closed.
d. (Closed) Violation (458/8581-01): Failure to maintain a controlled
copy of a temporary change notice (TCN) in front of the affected
. controlled procedure in the control room Station Operating
Manual (50M)
_ . _ _ _ -- _-
_
- _ _ . . . _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ . __
.
,
-5-
'
'
<The licensee :took immediate corrective actions by performing a
~ departmental review of all station operating procedures (SOPS),
, , abnormal' operating procedures (A0Ps), and emergency operating
-
procedures (EOPs). . During the review,.the licensee identified
several SOP's with duplicate copies of the same TCN and a few TCN's
filed with the wrong S0P. These conditions were immediately
corrected.'
,
m Responsibility for maintaining and ensuring that updates to the Main
' Control- Room procedure manual are properly filed has been reassigned
to Station Document Control (SDC). Periodic reviews of the Main
Control Room SOMs are being conducted by the SDC in accordance with
administration procedure ADM-005, " Station Document Control,"
Section 6.6.
'
_
This violation is closed.
3. Status of Operating License Conditions
Facility Operating License NPF-47 for River Bend Station was issued on
November 20, 1985, and Attachment 1 to this license contains items which
must be completed to the satisfaction of NRC Region IV. The following
status is provided for the Attachment 1 license conditions:
a. (Closed) License Condition 1.a.: Verify the station electric
distribution voltage analyses are in accordance with the guidelines
of Branch Technical Position PBS-1, Position 4, prior to completion
of the initial test program.
GSU has completed special situation test 1-SST-6, ." Bus Load Test,"
and the results were provided to Stone and Webster (S&W) for
comparison to analytical model results. Memorandum S-CRB-9031 dated
June 4, 1986, summarizes the results of that comparison and indicates
that the test versus analytical results are acceptable with no test
voltage drops more than 3 percent lower than the analytical values as
recommended by Branch Technical Position PSB-1.
This license condition is closed.
b. (Closed) License Condition 1.b: Evaluate and complete modifications
on battery powered lighting systems used in areas of the plant
outside the main control room required for safe shutdown and
personnel evacuation prior to completion of the initial test program.
The RI reviewed the licensee's emergency lighting plan as detailed on
Stone and Webster Lighting Plan drawings 12210-EE-65 thru 79.
Emergency lighting stations were selected from the drawings and
verified to be installed and operational for areas identified in
Final Safety Analysis Report (FSAR) Table 9.5-2, " Illumination Level
and Type of Fixtures used in Plant Areas Necessary for Safe Shutdown
and Evacuation of Personnel." In addition, areas previously
__
,
, -
.
,
. . . .
-
.. , -
. .
,
-6-
,
identified as being deficient in illumination were selectively
observed to meet the requirements of Table 9.5-2. As a result of
this walkdown, one area was identified which did not meet the minimum
illumination requirements. The area identified was an egress
stairwell located on the east side of the turbine building between
the elevation 95'0" and 123'6". The licensee initiated modification
request (MR)86-162 and maintenance work request (MWR) 41124 to
install the emergency light. This work was completed on June 15,
1986.
This license condition is closed.
4. Nuclear Review Board Activities
The RI reviewed the Nuclear Review Board (NRB) minutes for the period
February 1985 thru December 1985, to assess the overall effectiveness of
the licensee's implementation of the off-site review committee. These
minutes were evaluated against the NRB responsibilities outlined in
Section 6.5.3 of the Technical Specifications (TS) and the NRB Manual.
The RI noted during the above review, that the NRB has chartered four
subcommittees to assist the NRB in fulfilling their responsibilities.
These subcommittees are:
o "Unreviewed Safety Questions Committee" (USQC);
o " Quality Assurance Program Audit Committee" (QAPAC);
o " Quality Concern Subcommittee;" and
o "NRB/FRC Committee"
The USQC was established to assist the NRB in meeting its responsibilities
for reviewing proposed changes to the plant and its documentation to
ensure that changes are not made which constitute an unreviewed safety
question. Specifically, the USQC will review:
o all safety evaluations for changes to procedures, equipment, systems
or experiments which were determined not to involve unreviewed safety
questions;
o selected procedures, equipment, systems, tests and experiments which
did not receive an evaluation to verify that they were properly
classified and did not require a safety evaluation;
o changes which were determined to be unreviewed safety questions and
the associated changes to licensing documents;
o. proposed changes to the Operating License or TS; and
o violations of codes, regulations, orders, TS license requirements,
procedures and instructions having nuclear safety significance.
-
.
-7-
The QAPAC was chartered to advise the NRB on the effectiveness of the
'
Quality Assurance Program. This is accomplished thru the QAPAC's
participation in and review of audits performed by the QA audit group for
the areas required by 6.5.3.8 of the TS. The requirement of the QAPAC to
audit the Operational Quality Assurance Program every 24 months for
compliance with 10 CFR part 50, Appendix B, is being fulfilled thru the
Joint Utility Audit Group (JUAG).
The Quality Concern Subcommittee receives and coordinates quality concern
inquiries dealing with the operation of the quality assurance department
and management of the River Bend Nuclear Group. This committee insures
that proper action is taken by all departments to allegations or inquiries
which are received.
The NRB established the NRB/FRC Committee to monitor the FRC's activities.
This Committee assesses the FRC's fulfillment of its responsibilities by:
o reading all FRC minutes and other reports issued by the FRC;
o occasional attendance at FRC meetings;
o occasional verification of an FRC review item; and
o semi-annual meetings to discuss FRC activities.
The above subcommittees chartered by the NRB appear to be adequate to meet
the function and responsibilities established in the Technical
Specifications for the licensee's off-site review committee. The NRB
meeting' minutes reviewed by the RI for the period February 1985 thru
December 1985 demonstrate that the NRB members are cognizant of their
responsibilities and have established programs to fulfill these
responsibilities. The NRC inspectors will evaluate the effectiveness of
the NRB during future inspections.
No violations or deviations were identified in this area of the
inspection.
5. Startup Test Witness
During this inspection period, the SRI and RI witnessed startup testing
conducted under the startup testing program. The NRC inspectors observed
that: personnel conducting the test were cognizant of the test acceptance
criteria, precautions and prerequisites prior to beginning the test; the
test was conducted in accordance with an approved procedure; the test
procedure was being used and signed off by the personnel conducting the
test; and data were being collected and recorded as required. The NRC
inspectors witnessed the following startup tests:
'
.
-8-
o 1-ST-27 Turbine Trip and Generator Load Reject
o 1-ST-28 Shutdown from Outside the Control Room
o 1-ST-25B Main Steam Isolation Valve (MSIV) Full
Closure
o 1-ST-19 Core Performance
The following observations were made during the performance of the above
startup tests:
o Test 1-ST-27 Turbine Trip and Generator Load Reject:
The SRI and RI observed the performance of Section 6.3, "High Power
Generator Load Rejection" to startup test 1-ST-27, " Turbine Trip and
Generator Load Rejection" on May 29, 1986. The reactor was at
approximately 96 percent thermal power when a generator load
rejection was initiated by tripping a generator differential relay.
This caused both generator output breakers to open and a turbine
control valve fast closure (TCVFC) to occur. The reactor scrammed,
as expected, when the TCVFC signal was initiated. The peak reactor
pressure reached during the transient was 1106 psig. The NRC
inspectors noted that the bypass valves opened along with nine safety
relief valves (SRV) to reduce and control reactor pressure.
Following the initial SRV blowdown, only 1 SRV was observed to
reopen, which is consistent with the test acceptance criteria. The
licensee is presently evaluating SRVs B21*F041D and B21*F041F which
apparently opened briefly in their safety mode. The results of this
evaluatior, will be reviewed by the NRC inspectors during their review
of 1-ST-27 test results. The licensee has collected test data to
evaluate for conformance to acceptance criteria.
No violations or deviations were identified in this area of
inspection.
o 1-ST-28 Shutdown from Outside the Control Room:
The SRI and RI observed the performance of Section 6.3, " Cold
Shutdown from Outside the Control Roem", on May 30, 1986. Following
the reactor scram initiated during 1-ST-27, reactor pressure was
reduced to 120 psig from the main control room (MCR). The licensee
had previously demonstrated the ability to scram and maintain the
reactor in hot shutdown from outside the control room on February 15,
1986. With reactor pressure at 120 psig, control of the Division I
residual heat removal (RHR) system was transferred from the MCR to
the remote shutdown panel (RSP). When the nucleer control operators
(NCO) began to realign the RHR system from the low pressure coolant
injection (LPCI) mode to the RHR mode, the suppression pool suction
valve 1E12*F004A indication failed in the intermediate position.
- _
. . _ . ._. . - - __
. _ _ _ . _ . . _ _ . . . __ _ _ . _ _ _ _
.
-9-
l
After verifying locally that 1E12*F004A was closed, the NCO attempted
to open 1E12*F006A valve as required to establish shut down cooling.
This attempt failed however because of the interlock that prevents
4 -the F006A valve from opening if the F004A is not in the closed
. (indicated) position. Control of the division II RHR system was then
transferred to the division II RSP and the system aligned to the shut -r
down cooling mode without incident. The NCO established a cooldown
rate of approximately 80 F per hour with the heat transfer path to
the' standby, service water system. The licensee has collected the
test data to evaluate for conformance to acceptance criteria.
,
'
% violation or deviations were observed in this area of inspection.
,
.
,
-
,o' '
.T,est 1-ST-25B Main Steam Isolation Valve (MSIV) Full Closure:
.
2
,
Th'e RI witnessed the pefformance of startup test 1-ST-25B, "MSIV Full
Closure", on-June 8,1986 with reactor power at 100 percent and rated
- ., . core f, low at 96 percent. The licensee initiated the test at
1733 hours0.0201 days <br />0.481 hours <br />0.00287 weeks <br />6.594065e-4 months <br />.by simulating a loss of condenser vacuum which results in
the MSIVs closing when in the run mode. Upon initiation of the MSIV
full closure, the reactor tripped and the SRVs opened momentarily to
control pressure. Following the initial opening of the SRVs, only
'
, 1 SRV was observed to reopen. The high pressure core spray (HPCS)
and reactor core isolation cooling (RCIC) systems initiated on
reactor vessel water level reaching the level 2 setpoint. The
reactor vessel water level recovered quickly because of the
subsequent swell of vessel water and the continuous feed from the
reactor feed water pumps. The NC0 secured the HPCS injection valve
prior to the system injecting based on the rising vessel water level. ,
Approximately 3 minutes into the transmit, the reactor feed pumps
tripped on vessel high level. The reactor feed water B pump was
subsequently restarted and vessel level maintained within the normal
band. Control room conduct during the test was observed to be well
coordinated and efficient. The licensee has collected the test data
to evaluate for conformance to acceptance criteria.
"
No violations or deviations were identified in this area of
inspection,
i
! o Test 1-ST-19 Core Performance
The SRI witnessed the running of traversing incore probe (TIP) traces
in preparation for computer calculation of reactor power / thermal
limits. The required data was extracted and inserted into startup
- test procedure 1-ST-19, " Core Performance" by the licensee for test
- condition (TC) 6 verification of core thermal limits and core thermal
i power. A preliminary review of the test data by the SRI revealed
i-
that core thermal limits were well within the TS limits and core
thermal power was approximately 99.3 percent of rated thermal power.
1
.
i
. _ _ _ _ , . _ . , , , , _ , m . _ , _ _ _ _ . _ . _ . . .,.-,,...,_,_...,,_,_,,,.,,m._,,,_,,_._,_, -
,m.__~_. .m-- - _-
l
-10-
L
~
,
No violations or deviations were identified in this area of
. inspection.
,
6., Safety System Walkdown.
l'Duringthisinspebtionperiod,theSRIandRIperformedawalkdownofthe
'
"C",RHR system to verify proper system alignment for operability as
required by TS for Operational Conditions 1, 2, 3, 4, and 5. It was
observed that:
,
o sy' stem valves were properly aligned;
o abnormal control-room instrumentation readings or alarms were
-
present;
o no leakage from major components was present;
o the "C" RHR pump upper and lower bearing oil reservoirs were properly
filled; and
o accessible hangers and supports were intact.
No anomalies were noted that would have affected "C" RHR system
operability for low pressure coolant injection (LPCI). However, certain
discrepancies were noted when comparing the system condition / lineup with
the engineering piping and instrument diagrams (PIDs). It was noted that
pipe caps were missing from five vent and drain locations where PID-27-7C
indicated caps were installed; valve E12*MOVF064C which was open showed
closed on PID-27-7C; and valve E12*VF063C was not locked as shown on
PID-4-3C. Also, several valves were locked closed although the drawings
did not indicate locks installed. The failure to implement procedures to
maintain a safety system condition / lineup as shown on design output
drawings or to modify the design output drawings to reflect the required
system condition was identified by the SRI as an apparent violation
(458/8620-02). Subsequent discussions with licensee management revealed
that minimum flow valve E12*MOVF064C is open for standby operation and
condensate fill and flush valve E12*VF063C (not a major flow path valve)
had been identified as unlocked during an operations review of all valves
on the locked valve list. It had been noted that the valve was unlocked
and inaccessible without a scaffold or ladder. No action had been taken
to gain access to the valve to install a lock. The licensee took
immediate action to obtain ladders, and the valve was locked as shown on
PID-4-3C when the SRI identified that the valve was not locked. It was
also noted that the system operating procedure valve lineup did not
indicate that valve E12*VF063C was to be locked closed as show on the PID.
In response to the identified violation, the licensee should address how
they will assure that PID drawing, Stone and Webster flow diagrams, system
operating procedure valve lineups, locked valve lists and actual system
configuration are consistent for an identified system operational
condition and they should identify procedural controls which allow
deviation from drawing requirements. For example, procedures may allow
-
,
s a--
..
,
.
-11-
the locking of more valves than shown on the drawings at the discretion of
the operations staff. This issue should also be addressed for other
drawings / documents used routinely by operations and/or maintenance for
performance of work activities.
7. Operational Safety Verification
The SRI and RI observed operational activities throughout the inspection
period and closely monitored operational events. Control room activities
and conduct were observed to be well controlled and efficient. Proper
control room staffing was maintained and access to the control room
operational area was controlled. The licensee was adhering to limiting
conditions for operation (LCO) as they occurred. Operators were
questioned regarding lit annunciators and they understood why the
annunciators were lit in all cases. Selected shift turnover meetings were
observed, and all necessary information concerning plant status was
apparently being covered in these meetings. A walkdown of the "C" RHR
system was conducted, and the valves were observed to be in the proper
position for standby operation. Several plant tours were conducted and
overall plant cleanliness was good. During these plant tours, radiation
protection area postings were observed to be accurate.
During this inspection period the licensee completed a 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />
verification run at full power operation, and all planned startup testing
was completed.
No violations or deviations were identified in this area of inspection.
8. Maintenance Witness
During this inspection period, the RI observed portions of selected
corrective maintenance activities to verify that maintenance activities
are being conducted in accordance with approved procedures, TS and
appropriate industrial codes and standards. The RI verified through
direct observation and review of records that:
o maintenance activities did not violate LCOs;
o redundant components were available;
o required administrative approvals and tagouts were obtained before
initiating work;
o procedures were adequate to control the work;
o radiological controls were properly implemented where applicable;
o QC hold points were established and observed; and
o replacement parts and materials used were properly certified.
, o
-12-
The_following two corrective maintenance activities were observed:
o Control Rod Drive (CRO) Cooling Water Check Valve:
On May 7, 1986, the licensee experienced a failure of control
rod 24-33 to insert or withdraw during control rod manipulations.
Trouble shooting of the hydraulic control unit (HCU) revealed that
CRD cooling water check valve C11-V138 was not reseating when drive
water was applied to HCU 24-33. This condition allowed the drive
water to flow back thru the cooling water line and thus the necessary
lift was not being provided to the CRD drive piston to insert the rod
or retract the collet finger to allow withdraw of the control rod.
This condition would not have prevented the control rod from
inserting during a reactor scram.
~The. licensee initiated prompt maintenance work request (MWR) 39099 to
clean', inspect and replace if necessary the ball checks to CRD
cooling water check valve C11-V138 on HCU 24-33. The RI verified
prior to initiating work that the MWR had been properly initiated; QC
notification points were established, the job plan was appropriate to
control the work; and a job briefing had been performed as evidenced
by maintenance personnel signatures on the job briefing sheet. In
addition, the RI verified the requirements of T.S. 3.1.3.1 for an
inoperable control = rod were being complied with.
Prior to in'itiating work, the nuclear equipment operator (NE0)
obtained the shift supervisors permission to isolate HCU 24-33. The
, ' HCU was then isolated and tagged out using clearance number 86-192,
and.the ball was removed from the check valve. Inspection of the
ball revealed surface scratches and abrasions. Subsequent flushings
of the cooling water line produced a 1/2" x 1/16" round metal sliver.
'
A new ball was then installed in the check valve and the system
. verified operable using surveillance test procedure STP-052-0101,
" Control Rod Movement Operability Check." LC0 86-394, which was
initiated to track the action requirements of T.S. 3.1.3.1 was closed
based on the acceptable performance of STP-052-0101.
No violations or deviations were identified in this area of
inspection,
o Division II Emergency Diesel Generator:
During the performance of surveillance test STP-309-0202," Diesel
Generator Division II Operability Test," on June 5,1986, the " ready
to load" light did not illuminate after the diesel generator achieved
rated frequency and voltage. The licensee noted this condition and
immediately shut down the diesel. The failure of the " ready to load
light" to illuminate indicates that the standby generator breaker
1 ENS *ACB27 would not have closed onto standby buss IENS*SW618.
Prompt MWR 41549 was then initiated to trouble shoot and restore the
ready to load circuit to operable status. The RI reviewed the MWR
. *
.
-13-
prior to the initiation of work and verified that a deficiency tag
had been placed and the applicable LC0 initiated. The appropriate
hold points were placed in the procedure and a quality control
representative was present during the performance of this MWR. The
RI verified that the lifted leads were identified in the Lifted Lead
and Jumper Log as tag, numbers 86-3101-001 thru 006 and that the
, restored leads were independently verified.
The licensee identified-that relays EGS*UVRA-UVRB needed the pick up
voltages adjusted to within the setpoint limits. This work was
subsequently performed under MWR 41549, and the diesel restored to
operable statuu at 2041 hrs after the successful completion of
surveillance STP-309-0202. LC0 86-472 was then cancelled at
2045 hours0.0237 days <br />0.568 hours <br />0.00338 weeks <br />7.781225e-4 months <br />.
No violations'or deviations were identified in this area of
inspection.
9. Surveillance Witness
The SRI and RI witnessed surveillance testing conducted by the licensee
during this inspection period and the following observations were made:
o Surveillance Test STP-051-4210:
The SRI witnessed a portion of the instrumentation
surveillance STP-051-4210, "RPS/RHR Reactor Vessel Steam Dome
Pressure - High, Monthly Chfunct, 18 Month Chcal, and 18 Month LSFT
(821-N078B,B21-6798)" conducted on May 28, 1986. The portion of the
test observed was known to cause a half scram signal and the
technicians were cautious in verifying the other division was not
tripped prior to test performance. They also limited the time that
the half scram was allowed to be in by close coordination with the
operations staff. During the performance of this test it was noted
that there were more than one copy of certain pages of the procedure
in the official work copy. This created some confusion during test
performance. The SRI discussed this with instrumentation maintenance
supervision and it was discovered that there were seven open TCNs
against this procedure and the preparer of the last TCN (No. 86-0581)
had failed to use copies of previous permanent TCN pages to markup
for the new TCN as required by administrative procedure. This
resulted in the official work copy of the procedure containing three
page eights and three page elevens with a different TCN number on
each page. This failure to follow administrative procedures for
issue of TCNs was identified by the SRI as an apparent violation
(458/8620-01).
The SRI also discussed the status of incorporation of TCNs in
procedure revisions in response to a previous NRC violation and it
was found that there are a total of 38 procedures with more than
three open TCNs out of a total procedure population of
. - - .. - .-- - .
,, .
-14-
approximately 3500. The SRI requested a date from licensee
management for revision of these 38 procedures to incorporate the
'open TCNs and management stated that these procedures would be issued
by September 1, 1986.
o Surveillance Test STP-309-0202:
The RI observed the performance of surveillance STP-309-0202, " Diesel
Generator Division II Operability Test," Revision 5 on June 5, 1986,
.with the plant in operational condition 1. This surveillance is
'
. designed to demonstrate the operability of the Division II diesel
,
generator and satisfie's T.S. Sections 4.8.1.1.2.a.1 through
i 4.8.1.-l.2.a.7;and 4.8.1.1.2.c.1 and c.2.
.
-
) Prior to' initiating the test, communications were established between
'
the NE0 at the remote diesel panel and the NC0 in the Main Control
i Room. LC0 86-472 had previously been initiated in accordance with
! T.S. 3.8.1.1.b because of the preplanned preventive maintenance (PM)
'
which had been performed on this diesel generator prior to beginning
'STP-309-0202. Upon initiation of the STP, the diesel generator was
observed to attain rated frequency and voltage within the required 10
seconds, however the " ready to load" light did not illuminate at
either the remote panel or in the main control room. The diesel
generator was shutdown within 30 seconds of its starting and prompt
MWR 41549 initiated. The failure of the " ready to load" light to
illuminate indicates that the standby generator breaker IENS*ACB27
would not have closed onto standby bus IENS*SW618. After verifying
the diesel generator had failed its surveillance test, the licensee
initiated the actions required by T.S. 3.8.1.1.b for an inoperable
diesel generator, because of any cause other than the performance of
preplanned preventive maintenance.
MWR 41549 was completed at 2015 hours0.0233 days <br />0.56 hours <br />0.00333 weeks <br />7.667075e-4 months <br /> on June 5, 1986, and
STP-309-0202 was satisfactorily performed. LC0 86-472 was then
- closed based on the diesel generator satisfying the operability test.
No violations or deviations were identified in area of the inspection.
i 10. Licensee Plans for Coping With Strikes
,
The SRI reviewed licensee plans for coping with strikes during this
inspection period. It was found that the licensee had addressed such
issues as personnel / training requirements, security support requirements,
>
offsite support, etc. This area will be reviewed further during future
NRC inspections as required.
No violations or deviations were identified in this area of inspection.
1
!
!
. . . .
-15-
11. Status of TMI Action Item
(Closed) NUREG-0737, Item I.G.1: Trair;ing during initial startup test
. phase.
The licensee has completed the initial startup test program training
requirements as described in NUREG-0737, Item I.G.1 and FSAR
Section 14.2.3 Training During Initial Startup Test Phase. The startup
test training program was established to assure that personnel from each
of the six operating shift crews:
o observed a reactor scram;
o observed a pressure regulator transient;
o observed a water level setpoint transient;
o operated the operation of RCIC system; and
o observed a turbine trip or load rejection.
The startup test program was balanced, as much as practical, between the
six shif ts to assure that each shift was exposed to the above, off-normal
events. This has resulted in each shift having at least four individuals
who have observed actual plant responses for each of these events. Based
on the shift experience that now exists for each shift crew, no further
licensee action regarding NUREG-0737, Item I.G.1 is necessary.
This TMI action item is closed.
12. Exit and Inspection Interview
An exit interview was conducted on June 19, 1986, with licensee
representatives (identified in paragraph 1). During this interview, the
SRI reviewed the scope and findings of the inspection.