ML20203H752
| ML20203H752 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 07/30/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20203H757 | List: |
| References | |
| NUDOCS 8608050082 | |
| Download: ML20203H752 (2) | |
See also: IR 05000458/1986020
Text
_
h
In Reply Refer To:
JUL 3019%
Docket:
50-458/86-20
Gulf States Utilities
ATTN: William J. Cahill, Jr.
' Senior Vice President,
River Bend Nuclear Group
P. O. Box'2951
Beaumont, Texas
77704
Gentlemen:
This refers to the inspection conducted by Messrs. D. D. Chamberlain, and
.W.' B. Jones of this office during the pericd May 1 through June 15, 1986 of
activities authorized by NRC NPF-47 operating license for River Bend Station,
and to~the discussion of our fi.ndings with you and other members of your staff
at the conclusion of the inspection.
. Areas examined during the inspection included licensee action on previous
inspection. findings, status of operating license conditions, Nuclear Review
Board activities, startup test witness, safety system walkdown, operational
safety verification, maintenance witness, surveillance witness, licensee plans
for coping with strikes, and status of TMI action item. Within these areas,
the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the
-
inspectors.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
!
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
f
{L\\
,
c
/
-
r
k-
)
fi
C: U1B A
C:RPB
berlain M Jones
JJa3 don
JGagli
o
f
DC 1
(
7/
86
7
/86
7/p/86
7/1//
oI
IU
8608030082 860730
m
ADOCK 05000458
g\\\\
G
_ _ . _ _
__ _
_ _ _ _ - -
_
.
%
Gulf States Utilities
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
-
lS/'
-
,
J. E. Gagliardo, Chief
-
Reactor Projects Branch
Enclosures:
1.
Appendix-A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-458/86-20
cc w/ enclosures:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951
Beaumont, Texas 77704
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bcc to DMB (IE01)
bcc distrib.
by RIV:
- RPB
DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015)
- MIS System
- RSB
- RSTS Operator
- W. R. Bennett
- R&SPB
- RIV File
- w/766