ML17334A862

From kanterella
Revision as of 07:35, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Responds to RCS Vent Sys Design (TMI Item II.B.1) in Safety Evaluation Encl in SA Varga 830831 Ltr.Commitment to Rack Out RCS Vent Sys Breakers During Normal Operation Withdrawn
ML17334A862
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/15/1985
From: ALEXICH M P
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: DENTON H R
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.1, TASK-TM AEP:NRC:0584E, AEP:NRC:584E, NUDOCS 8501210088
Download: ML17334A862 (4)


Text

REGULATOh INFORMATION DISTRIBUTION STEM(RIDS)ACCESSION NBR:8501210088 DOC~DATE:85/01/15NOTARIZED:

NOFACIL:50-315 DonaldC.CookNuclearPowerPlantiUnit1FIndiana850-316DonaldCDCookNuclearPowerPlantiUnit2iIndiana8AUTH,NAMEAUTHORAFFILIATION

'LEXICHiM.P, Indiana8MichiganElectricCo.RECIP,NAME RECIPIENT AFFILIATION DENTONsH~REOfficeofNuclearReactorRegulationg DirectorDOCKET'00316

SUBJECT:

RespondstoRCSventsysdesign(TMIItemII.B,1)insafetyevaluation inSAYarga830831ltr,Commitment torackoutRCSventsysbreakersduringnormaloperation withdrawn

~DISTRIBUTION CODE:A006DCOPIESRECEIYED:LTRENCLSIZE:TITLE:ORSubmittal:

TMIActionPlanRgmtNUREG-0737 8NUREG0660NOTES:OL:10/25/74 OL:12/23/720500031505000316RECIPIENT IDCODE/NAME NRRORB1BC01INTERNAL:

ACRS3QELD/HDS3IE/DEPER/EPB NRR/DHFSDEPY29NRR/DL/ORAB 18NRR/DSI/AEB NRR/RAB00RGN2/DRSS/EPRPB COPIESLTTRENC710113131111RECIPIENT IDCODE/NAME ADM/LFMBIE/DEPERDIR33NRRPAULSONFH

~NRR/DLDIR14NRR/DSI/ADRS 27NRR/DSI/ASB NRR/DSTDIR30RGN3COPIE'SLTTRENCLEXTERNAL:

L'PDRNSIC0305NRCPDR02'OTALNURSEROFCOPIESREQUIRED:

LTTRAIENCL

('IIII'QM<IMIMMI'MlMllIIII1MIllMMtlrI'IIMhII'(IIIfIjliWIIl(Il10 INDIANA8MICHIGANELECTRICCOMPANYP.o.BOX16631COLUMBUS, OHIO43216January15,1985AEP:NRC:0584E IDonaldC.CookNuclearPlantUnitNos.1and2DocketNos;50-315and50-316-License"Nos.

DPR-58andDPR-74NUREG-0737, ITEMIIB.1,'.DELETECOMMITMENT TORACKOUTREACTORCOOLANTSYSTEMVENTBREAKERS-Mr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555.

DearMr.Denton:

1Thisletteris1nresponsetoanitemintheSafetyEvaluat1on (SE)attachedtoMr.StevenA.Varga'sletterdatedAugust31,1983.TheSEstatedthattheRCSventsystemdesignisacceptable providedcertainitemswereresolved.

-Oneoftheitemsinvolvedtherestoration ofcontinuous controlpowertotheRCSventsystembydeletingthecomm1tment torackouttherelatedoirouitbreakersduringnormaloperation.

Continuous powerisneededforventvalvepositionindication inthecontrolroom.Pursuanttotherequirements ofyourstaffaspresented intheSE,weherebywithdrawourcommitment torackouttheRCSventsystembreakersdur1ngnormaloperation.

Thisdocumenthasbeenpreparedfollowing Corporate procedures whichincorporate areasonable setofoontrolstoinsure1tsaccuracyandcompleteness priortosignature bytheundersigned.

Verytrulyyours,8501210088 850ii5PDRADOCK05000315PDRthAttachment M.P.AlexichVicePresi'dent IP<g4cc:JohnE.Dolan01.G..Smith, Jr.-BridgmanR.C.CallenG.Bruchmann G.CharnoffNRCResidentInspector

-Bridgman10 1II~~1J1El~