Leakage Reduction Program Summary Rept for Post-Accident Sampling Sys (P3400)ML20237G399 |
Person / Time |
---|
Site: |
Fermi |
---|
Issue date: |
08/06/1987 |
---|
From: |
DETROIT EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20237G331 |
List: |
---|
References |
---|
P34-87-01, P34-87-1, NUDOCS 8709020232 |
Download: ML20237G399 (3) |
|
Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5441998-03-27027 March 1998 Proposed Tech Specs Eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray 1999-09-03
[Table view] Category:TEST REPORT
MONTHYEARML20216G5151998-02-28028 February 1998 Non-proprietary Version of NEDC-32788, Safety Review for Enrico Fermi Energy Center Unit 2 Safety/Relief Valve Setpoint Tolerance Relaxation Analyses ML20197J1901993-03-31031 March 1993 Power Uprate Startup Test Rept for Nov 1992-Mar 1993 ML20127P1461993-01-0808 January 1993 Third Refueling Outage Final Rept for Reactor Containment Bldg Integrated Leak Rate Test NRC-90-0022, Final Rept for Reactor Containment Bldg Integrated Leak Rate Test1990-01-31031 January 1990 Final Rept for Reactor Containment Bldg Integrated Leak Rate Test NRC-88-0212, Suppl 9 to Interim Startup Test Rept1988-09-10010 September 1988 Suppl 9 to Interim Startup Test Rept ML20151K0271988-07-25025 July 1988 Confirmation Test Rept for IE Bulletin 85-003 NRC-88-0038, Suppl 7 to Interim Startup Test Rept1988-03-10010 March 1988 Suppl 7 to Interim Startup Test Rept ML20147D6841987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6741987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6661987-12-23023 December 1987 Rev 2 to Chemical & Physical Testing of Fasteners for Fermi 2 ML20147D6981987-12-21021 December 1987 Rev 1 to Chemical & Physical Testing of Fasteners for Fermi 2 NRC-87-0229, Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept1987-12-0707 December 1987 Suppl 6 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept NRC-87-0155, Suppl 5 to Interim Startup Test Rept1987-09-19019 September 1987 Suppl 5 to Interim Startup Test Rept ML20235F5761987-08-31031 August 1987 Max Credible Fault Tests CM249-Q2 Carrier Modulator for Fermi 2 Spds. Fault Applied to Output of CM249-Q2 Does Not Cause Degradation of Isolator Input Signal Beyond Acceptable Level ML20238E9371987-08-31031 August 1987 Rev 0 to Vols 1 & 2 to DET-22-103, Final Test Rept, In-Plant Safety Relief Valve Discharge Test,Enrico Fermi Atomic Plant,Unit 2 ML20237G3991987-08-0606 August 1987 Leakage Reduction Program Summary Rept for Post-Accident Sampling Sys (P3400) ML20237G3821987-08-0606 August 1987 Leakage Reduction Program Summary Rept for RWCU Sys (G33-00) ML20237G3621987-08-0606 August 1987 Leakage Reduction Program Summary Rept for Process Sampling Leakage Monitoring Sys (P33-00) NRC-87-0084, Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept1987-06-10010 June 1987 Suppl 4 to Fermi 2 Nuclear Power Plant,Interim Startup Test Rept ML20214J4151987-03-12012 March 1987 Leakage Reduction Program Summary Rept for Standby Gas Filter Sys (T46-00) ML20214J3991987-03-12012 March 1987 Leakage Reduction Program Summary Rept for RCIC Sys (E51-00) ML20214J3811987-03-12012 March 1987 Leakage Reduction Program Summary Rept for HPCI Sys (E41-00) ML20204H0071987-03-10010 March 1987 Suppl 3 to Fermi 2 Nuclear Power Plant Interim Startup Test Rept ML20210A7691987-02-0303 February 1987 Leakage Reduction Program Summary Rept for Control Room Drive Sys-(C1100),Fermi Unit 2 ML20211D3601986-10-16016 October 1986 Main Steam Bypass Sys Testing Program Rept ML20197C2531986-10-10010 October 1986 Leakage Reduction Program Summary Rept for RHR Sys - (E1100) ML20199E8631986-06-13013 June 1986 Submits Suppl 1 to 860312 Startup Rept,Per Tech Spec 6.9.1.3.No Test Results Available Due to 851031 Plant Shutdown.Supplemental Rept Will Be Submitted by 860920 ML20203A0661986-03-20020 March 1986 Leak Reduction Program Summary Rept for Primary Containment Monitoring Sys - (T50-00) ML20203A0281986-03-20020 March 1986 Leakage Reduction Program Summary Rept for Core Spray Sys - (E2100) ML20210D9091986-03-18018 March 1986 Rev to Description of Diesel Generator Bearing Reliability Demonstration Test Program ML20140D4161986-03-12012 March 1986 Interim Startup Test Rept ML20215C2601985-07-17017 July 1985 Radiation Measurements - Complete Survey ML20107E1941984-11-30030 November 1984 Reactor Containment Bldg Integrated Leak Rate Test, Preoperational Test Results,Nov 1984 ML20065F9751982-07-0808 July 1982 Inservice Testing Program ML20009B2421981-06-10010 June 1981 Revised Slope Stability Analysis of Shore Barrier,Enrico Fermi Atomic Power Plant,Unit 2,810610. ML20010E6651979-12-13013 December 1979 Test Rept: Cofrentes H22-P017B-H22-P018-H22-P005 ML20010E6641979-12-11011 December 1979 Test Rept: Cofrentes H13-P618 1998-02-28
[Table view] |
Text
- _ _ _ _ - - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - -
i l
l l
i I
a
. 1
/
t '
l
/
g
+-
i' l'
.t LIAKAGE REDrCTION PROGPNI SG1WE REPORT 4
g' FOR POST ACCIDEffT SNPLING SYSTd4 (P3400) 4 i
>)
4 t I
,,, a wi
,'e-l s
e
..e,
DETROIT EDISON COPA!E e
,, y ~
I) t FEIMI-2 POWER PIANT
.y-y f
e
/,
t u
Y /;
)
g j.
's L
s i
)
j
- ,r } c w
y*
.~.. ; 3
.c 8t
/ -,,
, /g
,t t/
)
yf,.
4, l
1
)
i I
REPORT NO. P34-87-01 g,
i e
/'
t'p r
s,1
.(
a e
'u v,, w
.,..c..
4 J
/
.J, s
u
, i:
' >,., 4 -y '
q
-)
",(,
Jy 3
/ '
rt
,s,.
j.
,/
t
)
v.
v s
y a
j 4
s, n.
e 4{
4 8709020232 870828 s
PDR ADOCK 05000341 P
PDR t
' !.'y t
s<
s' y
- r 1
i
,4 j
j
<<'!^*
/ LF1M RIDUCTIO'1 PRCGPIM PRO'T
/
FOR:
POSI, ACCIDpH' SA"PLIT SYSTm
.t f,. '
,s:
j,;)
s_ i n/
f, f
g
, _Prnm'r""O',1:
e u
y P4 th Q10.for:a12 Technical Specification'n, paragraph 6.0.4.a, anS the Fermi,o(PSla, Section 5.2.7.8, requirk that lockage from synteac outs 4k Mi:nry contaitent that could #: would cc: stein highly d 'radioacthe floMn, h. *h.e.ucoS and mintainoi to an-lou-an practical
+
f le/Sn. To desonntrat the loak tight,lntegbity of the Poct Acci:lont,
. [
Sa511ng Syntem, a nWMm lefage tect} is conducted once por reactor refueling (apnroximatelyn}the Pont Accident ShT?
every 13 mo"ths). Thib report 10 for the initial leahafj.t2 4 ef,
ling Synta:a.
f f
Q T/
r-
,/,
.e R"mmM : d
)
r LI s'
Dag. !b 6"72Pf)["poat Ir2ci3cnt Sa.rling Systera, Functional I[
07erating S%c jd'i 1
[ 'y I, a,
a Dug. 26. GI7h.-2]^0L 'J
- hoot Acep) cat Sping Syntera.. Piping 2)
Stur3 Detall;:L i
t m s, p
3,,j,
' c; a
+.,
s.
g1
- 3) Plant Coeratwn Manuhl 43'.71k.01 "Pd;d Accident Saapling Synten a
l' fo
[
4 Laakago NnifdKna Tent" d
4
- / }. /
..[
e s
" em nmanTF'rrn:
7n
,e v
( /
.,4 j.The LSNage punitoring tost for th3 Pont Accident Srpling System was divnle? Mnto hvo caparate nhuen. The first being'a carico of throo
/ 'tI air tc%$ at "Pftning a Leak P.ato !bnitor to neacbn the makeup. flow y
7 q [d L required to ;rpMn te".t Uhile linas were grencurinoi
'l nach2nica,' J.xn.dkr werM,prennure.Jyrk checked for ler.M ge. 'M2 ratoc ac well f
',n 4 an ; ',#76 at :amhanical fittinga ucre rir;0rded.. Seconi, the at
- f r l'yo!Tp?ty,tr.n a j h nydt67 wan in poctoi. This was done by placing i t 4Vtho' ' e!! ff.ob :acie irti inmacting all mechanic >l *:onnections for loabrge.
d j the coole?,, thtElei connection, anS control valves Iratd ifaalbtcly Cup Oc jxple station une inspectei because the rent of the systoa in erN'%1 ally 10thti?jht or inacceccible, a
, g f.
% +
n,-
(j m'mT RT40tn% *}
g i
y 3
y)p p
.t N
The air por ;& n of 2eu valance wac 6dar,t.c4 on June 19, 1987.
' The firntic t n tinuria:d t% 6rysnl.; 'chanle line. The ateanured flow i
r r.*
rate wa0, Ad SDf". uith no citbrnal icsta c.
Seconi, the Torun nrple u
.p s
r line u i pcycuriza:i wi.th a '.neacured f ?.aw rate of 0.05 SCFU and no 3[
,,,1 extort ' l' Leakagc. Lant, the air nrple return was precmurizM with a acacurei flow rate of 2.01,SCHF anl no extcrnal leakage. Tha-liquil f
cortion wa0 tectoi June 29,193;
171th the cyctem in the test flow noie, alb nachanica..v.cannectionn were innpactad and no leakage was
/
rouM.
e...
g
/^r v
.s
\\
\\
j 9
r f
l' L
a a
c B
)
t*
i
t.
APAT" CRT'""qTA:
,o
.The general leakage critaria to be apnlici during the first fuel cycle as the basic for it.ctituting corrective action in the forra of-correctivo maintenance nhall be 3.00 SCFII air leakage and 5 nl per per. the T-2 WE, thin leakago criteria will ba
- jtin. w;ter laakaga,
.urther evaluate 3 at the eni of tha first refueling cycle to deterraine j
the long-range leakaga roiuction progra:a criteria. Tbic will alloa cmarian 0 gainy3 during the initial cycle to ha factored into tho
+ong-range criteria.
I
)
1 I
I
---'--"-s-----
_ _