Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005
ML24240A176
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/29/2024
From: Matt Young
NRC/RGN-I/DORS
To: Carr E
Dominion Energy
References
IR 2024005
Download: ML24240A176 (1)


Text

August 29, 2024

SUBJECT:

UPDATED INSPECTION PLAN FOR MILLSTONE POWER STATION, UNITS 2 AND 3 (REPORTS 05000336/2024005 AND 05000423/2024005)

Dear Eric Carr:

The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Millstone Power Station, Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

As noted in the attached inspection plan, in addition to baseline inspections, the NRC will implement Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, Phase 1 and 2, at your facility.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading -rm/adams.html and at the NRC Public Document Room in

E. Carr 2

accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at (610) 337-5205 with any questions you have regarding this letter.

Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety

Docket Nos. 05000336 and 05000423 License Nos. DPR-65 and NPF-49

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV E. Carr 3

SUBJECT: UPDATED INSPECTION PLAN FOR MILLSTONE POWER STATION, UNITS 2 AND 3 (REPORTS 05000336/2024005 AND 05000423/2024005) DATED AUGUST 29, 2024

DISTRIBUTION RLorson, RA (R1ORAMAIL RESOURCE)

DCollins, DRA (R1ORAMAIL RESOURCE)

BWelling, DORS (R1DORSMAIL RESOURCE)

RMckinley DORS (R1DORSMAIL RESOURCE)

PKrohn, DRSS (R1DRSSMAIL RESOURCE)

JZimmerman, DRSS (R1DRSS MAIL RESOURCE)

MYoung, DORS SElkhiamy, DORS AChristiano, DORS JFuller, DORS, SRI EBousquet, DORS, RI DAntonangeli, DORS DHochmuth, DORS, AA MEvans, DORS, AA MSimmons, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO ROPassessment Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP -25 Second Quarter Process/Branch 2/ROP-25 Region I Inspection Plan Transmittal Letter Template_MS.docx ADAMS Accession No. ML24240A176 SUNSI Review n -Sensitive Publvlle Sensitive n -Publiclyvlable

OFFICE RI/DORS RI/DORS ME SElkhiamy MYoung TE 8/ 4 8/ 4 OFFIAL RERD CO Site Inspection Activity Plan Millstone

07/01/2024 - 06/30/2026

Unit Start End Activity CAC Title Staff Count

ISFSI Loading Campaign 3

2,3 7/1/2024 9/30/2024 IP 60855 001001 Operation Of An ISFSI

95001 Supplemental Inspection - Millstone Follow-up on Corrective Actions 2

2,3 7/8/2024 7/11/2024 IP 92702 001436 Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders 2,3 7/8/2024 7/11/2024 IP 95001 001346 Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs

MS2 Initial Operator Licensing Exam 3

2 8/4/2024 8/9/2024 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

2 9/8/2024 9/13/2024 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

RP - SAFSTOR - Millstone U1 1

1 9/9/2024 9/13/2024 IP 37801 000009 Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors 1 9/9/2024 9/13/2024 IP 40801 000010 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 1 9/9/2024 9/13/2024 IP 60801 000011 Spent Fuel Pool Safety At Permanently Shutdown Reactors

1 9/9/2024 9/13/2024 IP 64704 000018 Fire Protection Program at Permanently Shutdown Reactors

1 9/9/2024 9/13/2024 IP 71801 000023 Decommissioning Performance And Status Review At Permanently Suhutdown Reactors 1 9/9/2024 9/13/2024 IP 83750 000035 Occupational Radiation Exposure at Permanently Shutdown Reactors

1 9/9/2024 9/13/2024 IP 84750 000040 Radioactive Waste Treatment and Effluent And Environmental Monitoring

1 9/9/2024 9/13/2024 IP 86750 000045 Solid Radioactive Waste Management And Transportation Of Radioactive Materials

RP - 71124.06 - RETS - Millstone 1

2,3 9/9/2024 9/13/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

Access Control, Equipment Testing and Maintenance, Training, SPR 3

2,3 9/9/2024 9/13/2024 IP 71130.02 000734 Access Control

2,3 9/9/2024 9/13/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

2,3 9/9/2024 9/13/2024 IP 71130.07 000739 Security Training

2,3 9/9/2024 9/13/2024 IP 71130.09 001656 Security Plan Changes

2,3 9/9/2024 9/13/2024 IP 71151 001338 Performance Indicator Verification

Inservice Inspection - Millstone Unit 2 1

2 10/7/2024 10/18/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP-71124.01 - Rad Hazards - Millstone 1

2,3 10/7/2024 10/11/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

RP - 71151 - PIV - Millstone 1

Prepared on 8/2/2024 8:59:38 AM 1 of 3 Site Inspection Activity Plan

2,3 11/12/2024 11/15/2024 IP 71151 000746 Performance Indicator Verification

MS2 Requal Insp with P/F Results 1

2 11/25/2024 11/29/2024 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 2 11/25/2024 11/29/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Cyber Security - Millstone 4

2,3 12/9/2024 12/13/2024 IP 71130.10 000741 Cybersecurity

RP - 71124.03 & 71124.04 - Airborne & Dose - Millstone 1

2,3 1/27/2025 1/31/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

2,3 1/27/2025 1/31/2025 IP 71124.04 000728 Occupational Dose Assessment

License Renewal Phase 1 - Millstone Unit 3 1

3 4/14/2025 5/2/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal

Inservice Inspection - Millstone Unit 3 1

3 4/14/2025 4/25/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP - 71124.01 - Rad Hazzard & Controls - Millstone 1

2,3 4/28/2025 5/2/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

EP Program Inspection - Millstone 2

2,3 5/19/2025 5/23/2025 IP 71114.02 000717 Alert and Notification System Testing

2,3 5/19/2025 5/23/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

2,3 5/19/2025 5/23/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

2,3 5/19/2025 5/23/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

2,3 5/19/2025 5/23/2025 IP 71151 001397 Performance Indicator Verification

RP - 71124.07 - REMP - Millstone 1

2,3 5/19/2025 5/23/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program

Access Control, Protective Strategy, TSR, SPR, PIs - MS 4

2,3 6/23/2025 6/27/2025 IP 71130.02 000734 Access Control

2,3 6/23/2025 6/27/2025 IP 71130.05 000737 Protective Strategy Evaluation

2,3 6/23/2025 6/27/2025 IP 71130.09 001656 Security Plan Changes

2,3 6/23/2025 6/27/2025 IP 71130.14 000743 Review of Power Reactor Target Sets

2,3 6/23/2025 6/27/2025 IP 71151 001338 Performance Indicator Verification

License Renewal Phase 2 - Millstone Unit 3 5

3 7/7/2025 7/11/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal

3 7/21/2025 7/25/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal

RP - 71124.05 - Instrumentation - Millstone 1

2,3 7/14/2025 7/18/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation

2025 MS3 Initial Operator Licensing Exam 4

Prepared on 8/2/2024 8:59:38 AM 2 of 3 Site Inspection Activity Plan

3 8/25/2025 8/29/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

3 9/15/2025 9/19/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Age Related Degradation Inspection - Millstone 3

2,3 9/22/2025 10/10/2025 IP 71111.21N.04 001832 Age-Related Degradation

RP - 71124.08 - Rad Waste & Transportation - Millstone 1

2,3 10/6/2025 10/10/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

MS3 Requal Inspection with P/F Results 2

3 12/1/2025 12/5/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 3 12/1/2025 12/5/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Cyber Security - Millstone 2

2,3 2/2/2026 2/6/2026 IP 71130.10 000741 Cybersecurity

PI&R Biennial Team Inspection - Millstone 4

2,3 2/23/2026 2/27/2026 IP 71152B 000747 Problem Identification and Resolution

2,3 3/9/2026 3/13/2026 IP 71152B 000747 Problem Identification and Resolution

Inservice Inspection - Millstone Unit 2 1

2 4/13/2026 4/24/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP-71124.01 - Rad Hazards - Millstone 1

2,3 4/27/2026 5/1/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

Sec - Access Control, Equipment Testing and Maintenance, Training, SPR, PI Verification - MS 3

2,3 5/18/2026 5/22/2026 IP 71130.02 000734 Access Control

2,3 5/18/2026 5/22/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

2,3 5/18/2026 5/22/2026 IP 71130.07 000739 Security Training

2,3 5/18/2026 5/22/2026 IP 71130.09 001656 Security Plan Changes

2,3 5/18/2026 5/22/2026 IP 71151 001338 Performance Indicator Verification

Prepared on 8/2/2024 8:59:38 AM 3 of 3