UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2007 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glenn Allen, VA 23060-6711

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - MILLSTONE STATION UNITS 2 AND 3

Dear Mr. Christian:

On August 8, 2007, the NRC staff completed its performance review of Millstone Station Units 2 and 3 for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter of 2007 at Millstone Units 2 and 3 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2008. In addition to baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

D. Christian 2

As you may know, the NRC is currently evaluating the scope and frequency of all of the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos.:

50-336, 50-423 License Nos.: DPR-65, NPF-49

Enclosure:

Millstone Units 2 and 3 Inspection/Activity Plan cc w/encl:

J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.

R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)

S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York M. Balboni, Deputy Secretary for Public Safety, New York State J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq.

Institute of Nuclear Power Operations (INPO)

As you may know the NRC is currently evaluating the scope and frequency of all of the baseline

D. Christian 3

inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible.

Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos.:

50-336, 50-423 License Nos.: DPR-65, NPF-49

Enclosure:

Millstone Units 2 and 3 Inspection/Activity Plan J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.

R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)

S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York M. Balboni, Deputy Secretary for Public Safety, New York State J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq.

Institute of Nuclear Power Operations (INPO)

DOCUMENT NAME: S:\\ROP 8 Mid Cycle Review\\Letters for Mid Cycle\\Branch 5 Mid-cycle letters\\ROP-8 2007 Mid-cycle Millstone Letter.Rev6.wpd SUNSI Review Complete: BSN (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME NSieller/BSN FOR BNorris/BSN RPowell/RJP DATE 08/30/07 08/30/07 08/31/07 OFFICIAL RECORD COPY

Letter for David A. Christian from Raymond J. Powell dated August 31, 2007 4

Distribution w/encl: (via E-mail)

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP M. Cox, RI OEDO J. Thompson, NRR R. Powell, DRP B. Norris, DRP N. Sieller, DRP M. Gamberoni, DRS D. Roberts, DRS J. Trapp, DRS J. Rogge, DRS M. Sykes, DRS J. White, DRS L. Doerflein, DRS R. Conte, DRS L. Scholl, DRS P. Frechette, DRS D. Silk, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA D. Holody, ORA S. Collins, RA M. Dapas, DRA R. Laufer, RI OEDO H. Chernoff, NRR J. Lubinski, NRR J. Hughey NRR, PM E. Miller, NRR N. Sieller, Acting RI R. Powell, DRP B. Norris, DRP Region I Docket Room (with concurrences)

RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov

Millstone Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2007 13:52:56 Report 22 3

7111111B

- L.O. REQUAL.PROG.(FOCUS U3)+P/F RVW Baseline Inspections 10/15/2007 10/19/2007 2, 3 7111111B IP Licensed Operator Requalification Program 1

71114

- EP PRGM INSP Baseline Inspections 09/10/2007 09/14/2007 2, 3 7111402 IP Alert and Notification System Testing Baseline Inspections 09/10/2007 09/14/2007 2, 3 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 09/10/2007 09/14/2007 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 09/10/2007 09/14/2007 2, 3 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 09/10/2007 09/14/2007 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 09/10/2007 09/14/2007 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 09/10/2007 09/14/2007 2, 3 71151-EP03 IP Alert & Notification System 3

TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 09/17/2007 09/21/2007 3

7111105T IP Fire Protection [Triennial]

Baseline Inspections 10/01/2007 10/05/2007 3

7111105T IP Fire Protection [Triennial]

1 7112103

- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 09/24/2007 09/28/2007 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1

ISFSI

- ISFSI INSPECTIONS Other Routine 10/01/2007 12/31/2007 2, 3 60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1

7112203

- PUB RAD SAFETY - REMP Baseline Inspections 10/29/2007 11/02/2007 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 2

7111117B

- MODS AND 50.59 Baseline Inspections 11/05/2007 11/09/2007 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 11/05/2007 11/09/2007 2, 3 7111117B IP Permanent Plant Modifications 1

7112101

- OCC RAD SAFETY - ACCESS Baseline Inspections 02/11/2008 02/15/2008 2, 3 7112101 IP Access Control to Radiologically Significant Areas 4

71152B

- PI&R Baseline Inspections 02/11/2008 02/15/2008 2, 3 71152B IP Identification and Resolution of Problems Baseline Inspections 02/25/2008 02/29/2008 2, 3 71152B IP Identification and Resolution of Problems 4

EP

- EP EXERCISE EVALUATION Baseline Inspections 03/17/2008 03/21/2008 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 03/17/2008 03/21/2008 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/17/2008 03/21/2008 2, 3 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/17/2008 03/21/2008 2, 3 71151-EP02 IP ERO Drill Participation Baseline Inspections 03/17/2008 03/21/2008 2, 3 71151-EP03 IP Alert & Notification System 1

7111108P

- U2 INSERVICE INSPECTION Baseline Inspections 04/07/2008 04/11/2008 2

7111108P IP Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Millstone Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2007 13:52:56 Report 22 1

7111108P

- U2 INSERVICE INSPECTION Baseline Inspections 04/21/2008 04/25/2008 2

7111108P IP Inservice Inspection Activities - PWR 1

7112102

- OCC RAD SAFETY - ALARA Baseline Inspections 05/12/2008 05/16/2008 2, 3 7112102 IP ALARA Planning and Controls 5

7111111B

- L.O. REQUAL.PROG.(FOCUS U2)+P/F RVW Baseline Inspections 09/08/2008 09/12/2008 2, 3 7111111B IP Licensed Operator Requalification Program 7

7111121

- CDBI Baseline Inspections 07/14/2008 07/18/2008 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 07/28/2008 08/01/2008 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 08/04/2008 08/08/2008 2, 3 7111121 IP Component Design Bases Inspection 1

7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 07/14/2008 07/18/2008 2, 3 7112202 IP Radioactive Material Processing and Transportation 1

7111107B

- HEAT SINK (BOTH UNITS)

Baseline Inspections 08/18/2008 08/22/2008 2

7111107B IP Heat Sink Performance 1

7112102

- OCC RAD SAFETY - ALARA Baseline Inspections 09/08/2008 09/12/2008 2, 3 7112102 IP ALARA Planning and Controls 4

1/12EXAM

- U2 INITIAL OPERATOR LICENSING EXAMS Not Applicable 12/16/2008 12/19/2008 2

U01634 MILLSTONE 2 INITIAL EXAM (FY08) 1 7111108P

- U3 INSERVICE INSPECTION Baseline Inspections 10/13/2008 10/17/2008 3

7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 10/20/2008 10/24/2008 3

7111108P IP Inservice Inspection Activities - PWR 3

TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 11/17/2008 11/21/2008 2

7111105T IP Fire Protection [Triennial]

Baseline Inspections 12/01/2008 12/05/2008 2

7111105T IP Fire Protection [Triennial]

1 7112103

- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 12/01/2008 12/05/2008 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.