ust 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR MILLSTONE POWER STATION, UNITS 2 AND 3 (REPORT 05000336/2017005 AND 05000423/2017005)

Dear Stoddard:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Millstone Power Station, Units 2 and 3. The U.S. Nuclear Regulatory Commission (NRC)

provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to normal baseline inspections, the NRC will be performing Inspection Procedure 60855.1, Operation of an ISFSI at Operating Plants.

Please contact me at 610-337-5120 with any questions you have regarding this letter.

Sincerely,

/RA/

Jonathan E. Greives, Acting Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 Enclosure:

Inspection Plan cc: Distribution via ListServ

ML17240A011 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer JGreives DATE 8/24/17 8/25/17

Page 1 of 3 Millstone 08/22/2017 12:13:34 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 12/4EXM - MILLSTONE 3 INITIAL OL EXAM 4 3 11/06/2017 11/10/2017 U01946 FY18-MS3 INITIAL OPERATOR LICENSING EXAM 3 12/04/2017 12/08/2017 U01946 FY18-MS3 INITIAL OPERATOR LICENSING EXAM HP - RADIATION SAFETY - TEAM INST RETS REMP 3 2, 3 07/10/2017 07/14/2017 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2, 3 07/10/2017 07/14/2017 IP 71124.07 Radiological Environmental Monitoring Program EP - EP PROGRAM INSPECTION 2 2, 3 08/07/2017 08/11/2017 IP 7111402 Alert and Notification System Testing 2, 3 08/07/2017 08/11/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 08/07/2017 08/11/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2, 3 08/07/2017 08/11/2017 IP 71151 Performance Indicator Verification 7111121N - EQ PROGRAMS 3 2, 3 07/31/2017 08/04/2017 IP 7111121N Design Bases Assurance Inspection (Programs)

2, 3 08/14/2017 08/18/2017 IP 7111121N Design Bases Assurance Inspection (Programs)

7111111B - MS3 REQUAL INSP WITH P/F RESULTS 2 3 11/27/2017 12/01/2017 IP 7111111A Licensed Operator Requalification Program - Annual Review 3 11/27/2017 12/01/2017 IP 7111111B Licensed Operator Requalification Program HP - RADIATION SAFETY - RAD HAZ AND PIV 1 2, 3 10/16/2017 10/20/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/16/2017 10/20/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 2, 3 10/16/2017 10/20/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 7111108P - U3 INSERVICE INSPECTION 1 3 10/23/2017 11/03/2017 IP 7111108P Inservice Inspection Activities - PWR HP - RADIATION SAFETY - ALARA 1 2, 3 01/22/2018 01/26/2018 IP 71124.02 Occupational ALARA Planning and Controls 9/10EXAM - MILLSTONE 2 INITIAL OL EXAM 4 2 08/13/2018 08/17/2018 U01963 FY18- MILLSTONE 2 INITIAL OPERATOR LICENSING EXAM 2 09/10/2018 09/20/2018 U01963 FY18- MILLSTONE 2 INITIAL OPERATOR LICENSING EXAM EP - EXERCISE INSPECTION 4 2, 3 03/19/2018 03/23/2018 IP 7111401 Exercise Evaluation 7111121M - DESIGN BASES ASSURANCE INSPECTION (TEAM) 7 2, 3 04/16/2018 04/20/2018 IP 7111121M Design Bases Assurance Inspection (Teams)

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 3 Millstone 08/22/2017 12:13:34 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111121M - DESIGN BASES ASSURANCE INSPECTION (TEAM) 7 2, 3 04/30/2018 05/04/2018 IP 7111121M Design Bases Assurance Inspection (Teams)

ISFSI - ISFSI LOADING CAMPAIGN INSPECTION 3 2, 3 05/28/2018 06/01/2018 IP 60855 Operation Of An ISFSI 2, 3 05/28/2018 06/01/2018 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants HP - RADIATION SAFETY - AIRBORNE 1 2, 3 06/04/2018 06/08/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation REQUAL - MS2 REQUAL INSP WITH P/F RESULTS 2 2 10/29/2018 11/02/2018 IP 7111111A Licensed Operator Requalification Program - Annual Review 2 10/29/2018 11/02/2018 IP 7111111B Licensed Operator Requalification Program 71152B - PI&R BIENNIAL 1 2, 3 09/10/2018 09/14/2018 IP 71152B Problem Identification and Resolution 2, 3 09/24/2018 09/28/2018 IP 71152B Problem Identification and Resolution HP - RADIATION SAFETY - DOSIMETRY 1 2, 3 09/10/2018 09/14/2018 IP 71124.04 Occupational Dose Assessment HP - RADIATION SAFETY - RAD HAZ & PIV 1 2, 3 10/01/2018 10/05/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/01/2018 10/05/2018 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 10/01/2018 10/05/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 10/01/2018 10/05/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 2, 3 10/01/2018 10/05/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences U2 ISI - UNIT 2 INSERVICE INSPECTION 2 2 10/08/2018 10/19/2018 IP 7111108P Inservice Inspection Activities - PWR 50.59 - EVALS OF CHANGES, TESTS, & EXPERIMENTS 3 2, 3 02/04/2019 02/08/2019 IP 7111117T Evaluations of Changes, Tests, and Experiments HP - RADIATION SAFETY-RAD HAZ 1 2, 3 04/15/2019 04/19/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 04/15/2019 04/19/2019 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 04/15/2019 04/19/2019 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation U3 ISI - INSERVICE INSPECTION - UNIT 3 1 3 04/15/2019 04/26/2019 IP 7111108P Inservice Inspection Activities - PWR 71124.08 - RADWASTE 1 2, 3 06/03/2019 06/07/2019 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Millstone 08/22/2017 12:13:34 Inspection / Activity Plan Report 22 07/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site HP - RADIATION SAFETY-INSTRUMENTS 1 2, 3 06/24/2019 06/28/2019 IP 71124.05 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.