March 2, 2022

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR MILLSTONE POWER STATION, UNITS 2 AND 3 (REPORTS 05000336/2021006 AND 05000423/2021006)

Dear Mr. Stoddard:

The U.S Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Millstone Power Station, Units 2 and 3, reviewing performance indicators (PIs),

inspection results, and enforcement actions from January 1, 2021 through December 31, 2021.

This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Millstone Power Station, Units 2 and 3, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Millstone Power Station, Units 2 and 3.

The enclosed inspection plan lists the inspections scheduled through December 31, 2023.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions and as discussed in our November 2, 2021 memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ADAMS Accession No. ML21295A302), it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.

For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

Inspection Procedure (IP) 71111.21N.03 is included in the inspection plan as a placeholder for your next Design Basis Assurance Inspection (Programs), which will be focused on Commercial Grade Dedication. The IP will be developed and made publicly available before these inspections begin.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5205 with any questions you have regarding this letter.

Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety

Docket Nos. 05000336 and 05000423 License Nos. DPR-65 and NPF-49

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

Matthew R.

Young Digitally signed by Matthew R.

Young Date: 2022.03.02 09:12:03-05'00'

ML22060A036 x

SUNSI Review

x Non-Sensitive Sensitive

x Publicly Available Non-Publicly Available

OFFICE RI/DORS RI/DORS

NAME LCline MYoung

DATE 3/1/22 3/1/22

Millstone 01/01/2022 - 12/31/2023 Unit Start End Activity CAC Title Staff Count RP Rad Gaseous and Liquid Effluent Treatment 71124.06

2, 3 1/10/2022 1/14/2022 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 50.59 Inspection - Millstone Units 2 and 3

2, 3 2/14/2022 2/18/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments Inservice Inspection - Millstone Unit 3

3 4/11/2022 4/22/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP Radiological Hazard Assess / RETS 71124.01/.06

2, 3 4/11/2022 4/15/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 4/11/2022 4/15/2022 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Triennial Heat Sink - Millstone Units 2 and 3

2, 3 6/13/2022 6/17/2022 IP 71111.07T 000700 Heat Sink Performance Fire Protection - Millstone

2, 3 8/1/2022 8/5/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

2, 3 8/15/2022 8/19/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Access Control, Protective Strat, TSR, SPR, PI-MIL

2, 3 8/22/2022 8/26/2022 IP 71130.02 000734 Access Control 2, 3 8/22/2022 8/26/2022 IP 71130.05 000737 Protective Strategy Evaluation 2, 3 8/22/2022 8/26/2022 IP 71130.09 001656 Security Plan Changes 2, 3 8/22/2022 8/26/2022 IP 71130.14 000743 Review of Power Reactor Target Sets 2, 3 8/22/2022 8/26/2022 IP 71151 001338 Performance Indicator Verification FY22 Millstone 2 Initial Licensing Examination

2 7/25/2022 7/29/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

9/11/2022 9/23/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

RP Rad Environmental Monitoring Program 71124.07 - MS

2, 3 9/12/2022 9/16/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program PI&R BIENNIAL TEAM INSPECTION - MS

2, 3 9/12/2022 9/16/2022 IP 71152B 000747 Problem Identification and Resolution 2, 3 9/26/2022 9/30/2022 IP 71152B 000747 Problem Identification and Resolution EP EXERCISE INSPECTION - MILLSTONE

2, 3 10/31/2022 11/4/2022 IP 71114.01 000716 Exercise Evaluation 2, 3 10/31/2022 11/4/2022 IP 71151 001397 Performance Indicator Verification RP In-plant Airborne / Occ Dose Assessment / Perf. Indicator Verification 71124.03 /.04 / 71151

2, 3 11/14/2022 11/18/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Prepared on 2/2/2022 3:33:25 PM 1 of 3 Site Inspection Activity Plan Enclosure

2, 3 11/14/2022 11/18/2022 IP 71124.04 000728 Occupational Dose Assessment 2, 3 11/14/2022 11/18/2022 IP 71151 000746 Performance Indicator Verification MS2 Requal Inspection with P/F Results

2 11/28/2022 12/2/2022 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance

11/28/2022 12/2/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Cyber Security - Millstone

2, 3 12/5/2022 12/9/2022 IP 71130.10 000741 Cybersecurity EP PROGRAM INSPECTION - MILLSTONE

2, 3 1/30/2023 2/3/2023 IP 71114.02 000717 Alert and Notification System Testing 2, 3 1/30/2023 2/3/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2, 3 1/30/2023 2/3/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2, 3 1/30/2023 2/3/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 2, 3 1/30/2023 2/3/2023 IP 71151 001397 Performance Indicator Verification Inservice Inspection - Millstone 2R28

2 4/10/2023 4/21/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP Rad Hazard Assess and Control 71124.01

2, 3 4/17/2023 4/21/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls RP Rad Instrumentation 71142.05

2, 3 6/5/2023 6/9/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation Material Control and Accountability - Millstone Unit 2 and 3

2, 3 6/12/2023 6/16/2023 IP 71130.11 000742 Material Control and Accounting (MC&A)

Commercial Grade Dedication - Millstone

2, 3 7/17/2023 7/21/2023 IP 71111.21N.03 Design Bases Assurance Inspections (Programs) 2023 (Commercial Grade Dedication)

2, 3 7/31/2023 8/4/2023 IP 71111.21N.03 Design Bases Assurance Inspections (Programs) 2023 (Commercial Grade Dedication)

FORCE-ON-FORCE PLANNING AND EXERCISE - MS

2, 3 8/7/2023 8/11/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 2, 3 8/28/2023 9/1/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RP Radwaste and Transportation 71124.08

2, 3 8/21/2023 8/25/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation FY23 Millstone 3 Initial License Exam

3 8/13/2023 8/18/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

9/10/2023 9/15/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Millstone 3 Requal Inspection with P/F Results

Prepared on 2/2/2022 3:33:25 PM 2 of 3 Site Inspection Activity Plan

9/10/2023 9/15/2023 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance

9/10/2023 9/15/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP Rad Performance Indicator Verification 71151

2, 3 10/3/2023 10/5/2023 IP 71151 000746 Performance Indicator Verification Inservice Inspection - Millstone 3R22

3 10/9/2023 10/20/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP Rad Hazard and Control 71124.01

2, 3 10/16/2023 10/20/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Access Control, Equipment, Sec Trng, Sec Plan Review, PI-MIL

2, 3 11/27/2023 12/1/2023 IP 71130.02 000734 Access Control 2, 3 11/27/2023 12/1/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2, 3 11/27/2023 12/1/2023 IP 71130.07 000739 Security Training 2, 3 11/27/2023 12/1/2023 IP 71130.09 001656 Security Plan Changes 2, 3 11/27/2023 12/1/2023 IP 71151 001338 Performance Indicator Verification Prepared on 2/2/2022 3:33:25 PM 3 of 3 Site Inspection Activity Plan