Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Millstone Power Station Units 2 and 3 (Report 05000336/2014006 and 05000423/2014006)
ML14241A020
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 09/02/2014
From: Raymond Mckinley
NRC/RGN-I/DRP/PB5
To: Heacock D
Dominion Resources
McKinley R
References
IR-2014-006
Download: ML14241A020 (6)


Text

ber 2, 2014

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION UNITS 2 AND 3 (REPORT 05000336/2014006 AND 05000423/2014006)

Dear Mr Heacock:

On August 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Millstone Power Station, Units 2 and 3 (Millstone). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2013 through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Dominion operated Millstone in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Millstone during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

Although plant performance was within the Licensee Response Column, the NRC has not yet finalized the significance of a preliminary White finding (NCV 05000423/2014008-001, Failure to Maintain Adequate Maintenance Instructions for the Turbine Driven Auxiliary Feedwater Pump Governor Control Valve Linkage) documented in NRC inspection report 05000423/2014008.

The final safety significance determination may affect the NRCs assessment of plant performance and the enclosed inspection plan.

Additionally, the NRC has not finalized the severity of a preliminary Severity Level III traditional enforcement apparent violation (AV 05000336 & 05000423/2014011-01, Failure to Complete a 10 CFR 50.59 Evaluation for Removal of the Severe Line Outage Detection System)

documented in NRC inspection report 05000336/2014011 and 05000423/2014011.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.

Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through December 31, 2015.

Routine inspections performed by resident inspectors are not included in the inspection plan.

In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, IP 60855, Operation of an Independent Spent Fuel Storage Installation (ISFSI), and IP 60855.1, Operation of an ISFSI at Operating Plant. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, during this assessment period, the NRC issued an inspection report dated June 24, 2014 (ADAMS Accession No. ML14175A464), which documented a Green violation related to Dominions failure on two previous occasions to identify the issue. As a result, the NRC plans to conduct IP 92702, Follow-up on Corrective Actions for Violations and Deviations," to follow-up on your actions related to the Notice of Violation. The NRC tentatively plans to perform IP 92702 in May of 2015.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610)337-5150 with any questions you have regarding this letter.

Sincerely,

/RA/

Raymond R. McKinley, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 Enclosure: Millstone Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML14175A464), which documented a Green violation related to Dominions failure on two previous occasions to identify the issue. As a result, the NRC plans to conduct IP 92702, Follow-up on Corrective Actions for Violations and Deviations," to follow-up on your actions related to the Notice of Violation. The NRC tentatively plans to perform IP 92702 in May of 2015.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610)337-5150 with any questions you have regarding this letter.

Sincerely,

/RA/

Raymond R. McKinley, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 Enclosure: Millstone Inspection/Activity Plan cc w/encl: Distribution via ListServ Distribution w/encl: (via email)

See next page DOCUMENT NAME: S:\ROP Assessment Meetings\ROP-15 Mid-Cycle Review\Branch 5\Millstone\2014 MC Letter Millstone final.docx ADAMS ACCESSION NUMBER: ML14241A020 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer/SWS RMcKinley/RRM DATE 08/25/14 09/02/14

Letter to David Heacock from Raymond McKinley dated September 2, 2014 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR MILLSTONE POWER STATION UNITS 2 AND 3 (REPORT 05000336/2014006 AND 05000423/2014006)

Distribution w/encl: (via email)

W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS B. Welling, DRS R. McKinley, DRP S. Shaffer, DRP J. DeBoer, DRP J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI N. Day, DRP, RI (Actg)

A. Bowers, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPReports Resources A. Dimitriadis, DRS J. Noggle, DRS M. Gray, DRS C. Cahill, DRS J. Rogge, DRS D. Jackson, DRS D. Screnci, PAO, N. Sheehan, PAO N. McNamara, SLO D. Tifft, SLO ROPassessment Resource RidsNrrDirslpabResource

Page 1 of 2 Millstone 08/27/2014 15:25:36 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 9/29EXAM - U2 INITIAL OL EXAM 4 2 09/01/2014 09/05/2014 U01891 FY14-MILLSTONE 2 INITIAL OPERATOR LICENSING EXAM 2 09/29/2014 10/03/2014 U01891 FY14-MILLSTONE 2 INITIAL OPERATOR LICENSING EXAM 71152B - PI&R BIENNIAL 4 2, 3 07/14/2014 07/18/2014 IP 71152B Problem Identification and Resolution 2, 3 07/28/2014 08/01/2014 IP 71152B Problem Identification and Resolution 7111111B - U2 REQUAL INSPECTION WITH P/F RESULTS 2 2 09/15/2014 09/19/2014 IP 7111111B Licensed Operator Requalification Program EP EXER - EP EXERCISE INSPECTION 1 2, 3 09/08/2014 09/12/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 71124 - RADIATION SAFETY 1 2 10/20/2014 10/24/2014 IP 71124.02 Occupational ALARA Planning and Controls 2 10/20/2014 10/24/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 10/20/2014 10/24/2014 IP 71124.04 Occupational Dose Assessment 7111108P - U3 INSERVICE INSPECTION 1 3 10/20/2014 10/31/2014 IP 7111108P Inservice Inspection Activities - PWR 71124 - RADIATION SAFETY - RETS 1 2, 3 11/17/2014 11/21/2014 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 11/17/2014 11/21/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 - RADIATION SAFETY - INST 1 2, 3 12/15/2014 12/19/2014 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 12/15/2014 12/19/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 12/15/2014 12/19/2014 IP 71124.04 Occupational Dose Assessment 2, 3 12/15/2014 12/19/2014 IP 71124.05 Radiation Monitoring Instrumentation 2, 3 12/15/2014 12/19/2014 IP 71151-OR01 2, 3 12/15/2014 12/19/2014 IP 71151-PR01 71124.08 - RADWASTE 1 2, 3 01/12/2015 01/16/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - RADIATION SAFETY INSPECTION 1 2, 3 03/09/2015 03/13/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls CDBI - COMPONENT DESIGN BASIS INSPECTION 7 2, 3 03/30/2015 04/03/2015 IP 7111121 Component Design Bases Inspection 2, 3 04/13/2015 04/17/2015 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Millstone 08/27/2014 15:25:36 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site CDBI - COMPONENT DESIGN BASIS INSPECTION 7 2, 3 04/27/2015 05/01/2015 IP 7111121 Component Design Bases Inspection 71003 - U2 LR COMMITMENTS PHASE 2 INSP 4 2 05/04/2015 05/08/2015 IP 71003 Post-Approval Site Inspection for License Renewal 2 05/18/2015 05/22/2015 IP 71003 Post-Approval Site Inspection for License Renewal 9/7EXAM - U3 INITIAL OL EXAM 4 3 08/10/2015 08/14/2015 U01903 FY15-MS3 INITIAL OPERATOR LICENSING EXAM 3 09/07/2015 09/11/2015 U01903 FY15-MS3 INITIAL OPERATOR LICENSING EXAM 71124 - RADIATION SAFETY INSPECTION - REMP 1 2, 3 06/01/2015 06/05/2015 IP 71124.07 Radiological Environmental Monitoring Program ISFSI - ISFSI LOADING INSPECTION 1 2 06/01/2015 08/31/2015 IP 60855 Operation Of An ISFSI 2 06/01/2015 08/31/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124 - RADIATION SAFETY INSPECTION - ALARA 1 2 07/27/2015 07/31/2015 IP 71124.02 Occupational ALARA Planning and Controls EP - EP PROGRAM INSPECTION 1 2, 3 08/10/2015 08/14/2015 IP 7111402 Alert and Notification System Testing 2, 3 08/10/2015 08/14/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 08/10/2015 08/14/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 7111111B - U3 REQUAL INSP W/ P/F RESULTS 2 3 10/19/2015 10/23/2015 IP 7111111B Licensed Operator Requalification Program 71124 - RADIATION SAFETY INSPECTION 1 2 10/05/2015 10/09/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 7111108P - U2 INSERVICE INSPECTION 1 2 10/12/2015 10/23/2015 IP 7111108P Inservice Inspection Activities - PWR 71124 - RADIATION SAFETY INSPECTION - DOSE 1 2, 3 11/16/2015 11/20/2015 IP 71124.04 Occupational Dose Assessment 2, 3 11/16/2015 11/20/2015 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure