July 1, 2024
SUBJECT:
MILLSTONE POWER STATION, UNITS 2 AND 3 - EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000336/2024501 AND 05000423/2024501
Dear Eric Carr:
On June 6, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Millstone Power Station, Units 2 and 3 and discussed the results of this inspection with Michael O'Connor, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Daniel L. Schroeder, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security
Docket Nos. 05000336 and 05000423 License Nos. DPR-65 and NPF-49
Enclosure:
As stated
DANIEL SCHROEDER Digitally signed by DANIEL SCHROEDER Date: 2024.07.01 14:54:03 -04'00'
SUNSI Review
X Non-Sensitive Sensitive
X Publicly Available
Non-Publicly Available
OFFICE RI/DRSS RI/DORS RI/DRSS
NAME JDeBoer MYoung DSchroeder
DATE 6/17/2024 6/24/2024 6/18/2024
Enclosure
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Numbers:
05000336 and 05000423
License Numbers:
Report Numbers:
05000336/2024501 and 05000423/2024501
Enterprise Identifier: I-2024-501-0003
Licensee:
Dominion Energy Nuclear Connecticut, Inc.
Facility:
Millstone Power Station, Units 2 and 3
Location:
Waterford, CT
Inspection Dates:
June 3, 2024 to June 6, 2024
Inspectors:
J. DeBoer, Senior Emergency Preparedness Inspector
J. Ambrosini, Nuclear Engineer
K. Hussar, Senior Physical Security Inspector
J. Kepley, Operations Engineer
S. Mercurio, Emergency Preparedness Inspector
Approved By:
Daniel L. Schroeder, Chief
Security, Emergency Preparedness and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an emergency preparedness biennial exercise inspection at Millstone Power Station, Units 2 and 3, in accordance with the Reactor Oversight Process.
The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes:
- MP-23-07-0, MP-26-EPI-EPMP, Millstone Power Station Emergency Plan
- MP-23-10-0, Change ERO DEENS (Dominion Energy Emergency Notification System) testing frequency from monthly to quarterly
- MP-23-21-0, Replace Dose Assessment Procedure MP-26-EPI-FAP10 with EP-AA-DOS-101
- MP-24-08-0, Revision to MP-26-EPI-FAP06-002 U2 EALS and MP-26-EPA-REF02 U2 EAL Basis Document
- MP-24-09-0 Revision to MP-26-EPI-FAP06-003 U3 EALS and MP-26-EPA-REF03 U3 EAL Basis Document
This evaluation does not constitute NRC approval.
71114.07 - Exercise Evaluation - Hostile Action (HA) Event
Inspection Review (IP Section 02.01 - 02.11) (1 Sample)
- (1) The inspectors evaluated the biennial emergency plan exercise. The exercise scenario simulated a loss of offsite power, a hostile action based event with imminent loss of physical control of the plant, and a steam generator tube rupture resulting in a radiological release requiring offsite response on June 4, 2024.
71114.08 - Exercise Evaluation - Scenario Review
Inspection Review (IP Section 02.01 - 02.04) (1 Sample)
- (1) The inspectors reviewed and evaluated the proposed scenario for the biennial emergency plan exercise on May 8,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12)===
- (1) For the period April 1, 2023 - March 31, 2024
EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
- (1) For the period April 1, 2023 - March 31, 2024
EP03: Alert And Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
- (1) For the period April 1, 2023 - March 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 6, 2024, the inspectors presented the emergency preparedness biennial exercise inspection results to Michael O'Connor, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
MJUN24BE
Millstone Unit 2 NRC/FEMA HAB Exercise Package
Scenario
04/01/2024
MP-26-EPI-
FAP06-002
Millstone Power Station Unit 2 EAL Matrix
Revision 16
MP-PROC-EP-
MP-26-EPI-EPMP
Millstone Power Station Emergency Plan
Revision 67
71151
Corrective Action
Documents
Resulting from
Inspection
CR1261293
06/06/2024
Procedures
Emergency Preparedness Performance Indicators
Revision 11