UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR MILLSTONE POWER STATION UNIT 2 AND UNIT 3 (REPORT 05000336/2012001 AND 05000423/2012001)

Dear Mr. Heacock:

On February 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Millstone Power Station Unit 2 and Unit 3. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Millstone Power Station Unit 2 and Unit 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. Millstone Unit 2 was in the Regulatory Response Column of the NRCs Reactor Oversight Process Action Matrix until the most recent quarter, due to a white finding in the Initiating Events Cornerstone, related to control room crew performance during a plant transient. This finding was closed in the fourth quarter 2012. The NRC determined the performance at Millstone Unit 2 and Unit 3 during the most recent quarter was within the Licensee Response Column because all inspection findings had very low (i.e., green) safety significance, all performance indicators demonstrated that your performance was within the nominal, expected range (i.e., green), and a supplemental inspection was successfully completed at Millstone Unit 2 for the white finding on November 2, 2012. Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, IP 92709, Licensee Strike Contingency Plans, IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, and Temporary Instruction (TI) 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Ronald R. Bellamy at (610)337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Darrell J. Roberts, Director Division of Reactor Projects Docket Nos.: 50-336; 50-423 License Nos.: DPR-65; NPF-49 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ

ML13060A342 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME TSetzer RBellamy DRoberts DATE 02/26/13 02/26/13 03/04/13 Distribution w/encl: (via email)

W. Dean, RA D. Lew, DRA D. Roberts, DRP M. Layton, DRP C. Miller, DRS J. Clifford, DRS R. Bellamy, DRP T. Setzer, DRP E. Keighley, DRP J. DeBoer, DRP J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI J. Krafty, DRP, RI C. Kowalyshyn, DRP, AA J. Cassidy, RI OEDO DRS Branch Chiefs (6)

N. McNamara, SLO D. Tifft, SLO D. Screnci, PAO N. Sheehan, PAO RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPreports Resource ROPassessment Resource RidsNrrDirslpabResource

Page 1 of 2 Millstone 02/26/2013 14:00:37 Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site MODS - PERMANENT PLANT MODIFICATIONS 5 2, 3 01/28/2013 02/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 2, 3 02/11/2013 02/15/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111108P - U3 INSERVICE INSPECTION 1 3 04/22/2013 05/03/2013 IP 7111108P Inservice Inspection Activities - PWR 71124 - OCC RADIATION SAFETY 1 2, 3 04/29/2013 05/03/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 04/29/2013 05/03/2013 IP 71124.02 Occupational ALARA Planning and Controls 71124 - REMP 1 2, 3 05/20/2013 05/24/2013 IP 71124.07 Radiological Environmental Monitoring Program 60853 - ISFSI PAD EXPANSION 2 2, 3 06/01/2013 12/31/2013 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI 2, 3 06/01/2013 12/31/2013 IP 60855 Operation Of An ISFSI 2, 3 06/01/2013 12/31/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 7111107T - TRIENNIAL HEAT SINK 1 2, 3 07/15/2013 07/26/2013 IP 7111107T Heat Sink Performance TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 8 2, 3 07/22/2013 07/26/2013 IP 7111105T Fire Protection [Triennial]

2, 3 08/05/2013 08/09/2013 IP 7111105T Fire Protection [Triennial]

10/21EXM - MILLSTONE 3 INITIAL EXAM 4 3 11/04/2013 11/08/2013 U01874 FY14-MILLSTONE 3 INITIAL OPERATOR LICENSING EXAM 3 12/02/2013 12/11/2013 U01874 FY14-MILLSTONE 3 INITIAL OPERATOR LICENSING EXAM 71124 - RADIATION SAFETY INSPECTION 1 2, 3 07/29/2013 08/02/2013 IP 71124.05 Radiation Monitoring Instrumentation 7111111B - MILLSTONE 3 REQUAL INSP WITH P/F RESULTS 2 3 10/21/2013 10/25/2013 IP 7111111B Licensed Operator Requalification Program 71124 - RADIO EFFLUENTS 1 2, 3 08/26/2013 08/30/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2, 3 08/26/2013 08/30/2013 IP 71151 Performance Indicator Verification EP PROGR - EP PROGRAM INSPECTION 2 2, 3 09/03/2013 09/06/2013 IP 7111402 Alert and Notification System Testing 2, 3 09/03/2013 09/06/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 09/03/2013 09/06/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Millstone 02/26/2013 14:00:37 Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - ALARA, IN-PLANT AIRBORNE AND DOSE ASSESS 1 2, 3 09/23/2013 09/27/2013 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 09/23/2013 09/27/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 09/23/2013 09/27/2013 IP 71124.04 Occupational Dose Assessment 71124 - RAD HAZARD, IN-PLANT AIRBORNE, DOSE ASSE 1 2, 3 12/16/2013 12/20/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 12/16/2013 12/20/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 12/16/2013 12/20/2013 IP 71124.04 Occupational Dose Assessment 2, 3 12/16/2013 12/20/2013 IP 71151 Performance Indicator Verification TI-182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 2, 3 01/13/2014 01/17/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 7111108P - U2 INSERVICE INSPECTION 1 2 04/07/2014 04/18/2014 IP 7111108P Inservice Inspection Activities - PWR 71003 - U2 LR COMMITMENTS PHASE 1 INSP 2 2 04/07/2014 04/12/2014 IP 71003 Post-Approval Site Inspection for License Renewal 71124 - RADIATION SAFETY 1 2, 3 04/21/2014 04/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 04/21/2014 04/25/2014 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 04/21/2014 04/25/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 04/21/2014 04/25/2014 IP 71124.04 Occupational Dose Assessment 2, 3 04/21/2014 04/25/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.