Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 01/30/2024 |
From: | Armstrong L Dominion Energy Nuclear Connecticut |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
24-046 | |
Download: ML24030A752 (1) | |
Similar Documents at Millstone | |
---|---|
Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024
[Table view]Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits 2024-09-04 Category:Technical Specification MONTHYEARML24086A4762024-03-22022 March 2024
[Table view]Application for Technical Specification Change to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line-Item Improvement Process ML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23013A2242023-01-13013 January 2023 Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure Temperature Limitation Figures ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22096A2212022-04-0606 April 2022 Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML22032A2702022-01-28028 January 2022 Technical Specification Bases Pages ML22032A2692022-01-28028 January 2022 Technical Specification Bases Pages ML22027A7362022-01-27027 January 2022 Request for Enforcement Discretion from Technical Specification 3.5.2 ECCS Subsystems and Technical Specification 3.7.3 Reactor Plant Component Cooling Water System ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML21047A4332021-02-15015 February 2021 Attachment 2: MPS3 Technical Specification Bases Pages ML21047A4322021-02-15015 February 2021 Attachment 1: MPS2 Technical Specification Bases Pages ML20252A1912020-09-0404 September 2020 Response to Request for Additional Information Regarding License Amendment Request for a One-Time Deferral of the Millstone Unit 3 Steam Generator Inspections ML20224A4572020-08-11011 August 2020 Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections ML20063L8232020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20065K9762020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20063L2872020-02-26026 February 2020 Technical Specification Bases Pages ML19304A2942019-10-22022 October 2019 Supplement to Proposed License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the Millstone Unit 3 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Componen ML19109A1002019-04-11011 April 2019 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. ML19052A1612019-02-14014 February 2019 Changes to Technical Specification Bases ML16257A5632016-09-19019 September 2016 Correction Letter to Amendment No. 327 - Technical Specification Changes for Spent Fuel Storage ML16258A1442016-09-0101 September 2016 Administrative Correction to License Amendment 327, Technical Specification Changes to Spent Fuel Pool Storage ML16061A0732016-02-23023 February 2016 Changes to Technical Specification Bases ML16034A3582016-01-26026 January 2016 License Amendment Request, Spent Fuel Pool Heat Load Analysis ML15342A0282015-12-0101 December 2015 Supplement to License Amendment Request to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML15246A1172015-08-31031 August 2015 Supplement to License Amendment Request to Revise TS 6.19, Containment Leakage Testing Program ML15065A3342015-02-26026 February 2015 Changes to Technical Specification Bases ML14188B1892014-06-30030 June 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C. ML14093A0272014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14093A0262014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14070A3462014-03-0606 March 2014 Changes to Technical Specification Bases ML13281A8092013-10-0202 October 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink ML13281A8042013-10-0202 October 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.5, Ultimate Heat Sink ML13198A2712013-06-27027 June 2013 Supplement to License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. ML13120A1582013-04-25025 April 2013 License Amendment Request to Revise Technical Specification 6.8.4.F for Peak Calculated Containment Internal Pressure ML13079A2262013-03-0606 March 2013 Submittal of Changes to Technical Specification Bases ML12362A0122012-12-17017 December 2012 License Amendment Request to Revise Surveillance Requirement 4.4.3.2 Reactor Coolant System Relief Valves ML12081A1292012-03-0909 March 2012 Changes to Technical Specification Bases ML12032A2242012-01-25025 January 2012 License Amendment Request to Relocate TS Surveillance Frequencies to License Controlled Program in Accordance with TSTF-425, Revision 3 ML11193A2242011-07-0505 July 2011 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3, Attachment 3 Through Attachment 6, Marked-up TS Pages and TS Bases Pages ML1023904032010-08-19019 August 2010 Changes to Technical Specification Bases ML0925806592009-09-0909 September 2009 Changes to Technical Specification Bases ML0826104492008-09-0808 September 2008 Transmittal of Changes to Technical Specification Bases ML0723303092007-08-15015 August 2007 Reactor Coolant System Leakage Detection Systems (Lbdcrs 07-MP2-012 and 07-MP3-032) ML0720003962007-07-13013 July 2007 Attachment 4, Millstone Power Station Unit 3, License Amendment Request, Stretch Power Uprate, Mark-Up of Associated Technical Specifications Bases Pages ML0715605312007-05-31031 May 2007 Tech Spec Pages for Amendment 299 Steam Generator Tube Integrity ML0711002192007-04-12012 April 2007 Changes to Technical Specifications Bases ML0708807052007-03-28028 March 2007 License Amendment Request (LBDCR 07-MP2-007) Re Containment Spray Nozzle Surveillance ML0703101462007-01-30030 January 2007 Technical Specification, Pressurizer Water Level Limits ML0700300722007-01-0202 January 2007 Supplement to Proposed Technical Specification Change (LBDCR 04-MP3-011) Auxiliary Feedwater System Allowed Outage Time 2024-03-22 Category:Bases Change MONTHYEARML24030A7522024-01-30030 January 2024
[Table view]Technical Specification Bases Pages ML23013A2242023-01-13013 January 2023 Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure Temperature Limitation Figures ML22096A2212022-04-0606 April 2022 Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML22032A2702022-01-28028 January 2022 Technical Specification Bases Pages ML22032A2692022-01-28028 January 2022 Technical Specification Bases Pages ML21047A4332021-02-15015 February 2021 Attachment 2: MPS3 Technical Specification Bases Pages ML21047A4322021-02-15015 February 2021 Attachment 1: MPS2 Technical Specification Bases Pages ML20065K9762020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20063L2872020-02-26026 February 2020 Technical Specification Bases Pages ML19109A1002019-04-11011 April 2019 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. ML19052A1612019-02-14014 February 2019 Changes to Technical Specification Bases ML16258A1442016-09-0101 September 2016 Administrative Correction to License Amendment 327, Technical Specification Changes to Spent Fuel Pool Storage ML16061A0732016-02-23023 February 2016 Changes to Technical Specification Bases ML16034A3582016-01-26026 January 2016 License Amendment Request, Spent Fuel Pool Heat Load Analysis ML15342A0282015-12-0101 December 2015 Supplement to License Amendment Request to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML15065A3342015-02-26026 February 2015 Changes to Technical Specification Bases ML14188B1892014-06-30030 June 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C. ML14070A3462014-03-0606 March 2014 Changes to Technical Specification Bases ML13198A2712013-06-27027 June 2013 Supplement to License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. ML13079A2262013-03-0606 March 2013 Submittal of Changes to Technical Specification Bases ML12081A1292012-03-0909 March 2012 Changes to Technical Specification Bases ML12032A2242012-01-25025 January 2012 License Amendment Request to Relocate TS Surveillance Frequencies to License Controlled Program in Accordance with TSTF-425, Revision 3 ML11193A2242011-07-0505 July 2011 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3, Attachment 3 Through Attachment 6, Marked-up TS Pages and TS Bases Pages ML1023904032010-08-19019 August 2010 Changes to Technical Specification Bases ML0925806592009-09-0909 September 2009 Changes to Technical Specification Bases ML0826104492008-09-0808 September 2008 Transmittal of Changes to Technical Specification Bases ML0723303092007-08-15015 August 2007 Reactor Coolant System Leakage Detection Systems (Lbdcrs 07-MP2-012 and 07-MP3-032) ML0720003962007-07-13013 July 2007 Attachment 4, Millstone Power Station Unit 3, License Amendment Request, Stretch Power Uprate, Mark-Up of Associated Technical Specifications Bases Pages ML0711002192007-04-12012 April 2007 Changes to Technical Specifications Bases ML0708807052007-03-28028 March 2007 License Amendment Request (LBDCR 07-MP2-007) Re Containment Spray Nozzle Surveillance ML0700300722007-01-0202 January 2007 Supplement to Proposed Technical Specification Change (LBDCR 04-MP3-011) Auxiliary Feedwater System Allowed Outage Time ML0630003212006-10-26026 October 2006 Changes to Technical Specifications Bases ML23040A0472006-06-22022 June 2006 Bases for Section 2.0 Safety Limits and Limiting Safety System Settings ML0619401052006-06-13013 June 2006 License Basis Document Change Request (LBDCR) 04-MP2-011 Proposed Technical Specification Changes Implementation of Alternate Source Term ML0610302342006-04-12012 April 2006 Changes to the Technical Specifications Bases - 3/4.7.4 Service Water System (Continued) - 3/4.9 Refueling Operations ML0606505072006-03-0303 March 2006 Changes to Technical Specifications Bases ML0524102812005-08-25025 August 2005 TS Bases Pages Regarding Limiting Safety System Settings ML0519600322005-07-14014 July 2005 Proposed Revision to Technical Specifications (LBDCR 05-MP2-003) Reactor Coolant System Heatup/Cooldown Limits ML0518201392005-06-29029 June 2005 Limiting Condition for Operation and Surveillance Requirements ML0516104052005-06-0909 June 2005 Changes to Technical Specifications Bases ML0509502152005-03-23023 March 2005 Response to Request for Additional Information Regarding Proposed Technical Specification Changes for Implementation of Alternate Source Term ML0507702382005-03-0909 March 2005 Proposed Technical Specifications Changes Shutdown Operations Involving Positive Reactivity Additions ML0332404692003-11-0707 November 2003 Changes to Technical Specifications Bases ML0322501192003-07-31031 July 2003 Changes to Technical Specifications Bases ML0322500482003-07-31031 July 2003 Changes to Technical Specifications Bases ML0307806582003-03-11011 March 2003 Response to Request for Additional Information Re TS Change Request 2-15-02 ML0226003642002-09-0606 September 2002 License Bases Document Change Requests 2-7-02 & 3-3-02 Missed Surveillances Using Consolidated Line Item Improvement Process (CLIIP) - Correction to the Original Submittals ML0224104022002-08-14014 August 2002 Modification to Technical Specification Change Request Administrative and Editorial Changes to the Technical Specifications ML0221900252002-08-0707 August 2002 Millstone Power Station, Unit 1 - Bases Changes for Unit 1 Central Monitoring Station ML0223303152002-08-0707 August 2002 Changes to Technical Specifications Updating List of Documents Describing the Analytical Methods Specified in Technical Specifications 6.9.1.8b 2024-01-30 |