Annual Assessment Letter - Millstone 2010 (Reports 05000336-10-001 and 05000423-10-001)
ML100621420
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/03/2010
From: Diane Jackson
NRC/RGN-I/DRP/PB5
To: Heacock D
Dominion Resources
Shared Package
ML100541711 List:
References
IR-10-001, FOIA/PA-2011-0115
Download: ML100621420 (7)


See also: IR 05000336/2010001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA, PENNSYLVANIA 19406-1415

March 3, 2010

Mr. David Heacock

Sr. Vice President and Chief Nuclear Officer

Dominion Resources

500 Dominion Boulevard

Glenn Allen, VA 23060-6711

SUBJECT:

ANNUAL ASSESSMENT LETTER - MILLSTONE POWER STATION

(REPORTS 05000336/2010001 and 05000423/2010001)

Dear Mr. Heacock:

On February 9, 2009, the NRC staff completed its performance review of the Millstone Power

Station (Millstone). Our technical staff reviewed performance indicators (Pis) for the most recent

quarter and inspection results for the period from January 1 through December 31.2009. The

purpose of this letter is to inform you of our assessment of your safety performance during this

period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as "Official Use Only - Security Related Information" will

include the security cornerstone review and resultant inspection plan.

Overall, Millstone Units 2 and 3 operated in a manner that preserved public health and safety

and fully met all cornerstone objectives. Plant performance for the most recent quarter. as well

as for the first three quarters of the assessment cycle. was within the Licensee Response

column of the NRC's Action Matrix, based on all inspection findings being classified as having

very low safety significance (Green) and all Pis indicating performance at a level requiring no

additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process

(ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection,

scheduled through June 30, 2011. In addition to baseline inspections. we plan to conduct a

follow-up inspection for three severity level IV non-cited violations issued within the same

traditional enforcement area during the assessment period. The inspection plan is provided to

allow for the resolution of any scheduling conllicts and personnel availability issues well in

advance of inspector arrival onsite. Routine resident inspections are not listed due to their

ongoing and continuous nature. The inspections in the last nine months of the inspection plan

are tentative and may be revised at the mid-cycle review.

D. Heacock

2

In accordance with 10CFR2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at 610-337-5306 with any

questions you may have regarding this letter or the inspection plan.

SI"Zli& J-~~

Donald E. Jackson, Chief

Projects Branch 5

Division of Reactor Projects

Docket Nos. 50-336.50-423

License Nos. DPR-65, NPF-49

Enclosure:

Millstone Inspection/Activity Plan

ccw/encl.

Distribution via ListServ

D. Heacock

2

In accordance with 1 OCFR2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at 610-337-5306 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA!

Donald E. Jackson, Chief

Projects Branch 5

Division of Reactor Projects

Docket Nos. 50-336, 50-423

License Nos. DPR-65, NPF-49

Enclosure:

Millstone Inspection/Activity Plan

S. Collins. RA

(R10RAMAIL RESOURCE)

RldsNRRDorlLpI1-2 Resource

M, Dapas. DRA (R10RAMAIL RESOURCE)

ROPreportsResource@nre.gov

D. Lew, DRP

(R1 DRPMAIL RESOURCE)

DRS Branch Chiefs (6)

J. Clifford, DRP (R1DRPMAIL RESOURCE)

L. Scholl, DRS

D. Silk,DRS

D. Roberts, DRS (R1DRSMall Resource)

N. McNamara. RI

P. Wilson. DRS (R1DRSMail Resource)

D. Tifft. RI

D. Jackson. DRP

D. Serenel. PAO

T. Setzer, DRP

N. Sheehan. PAO

J. Heinly, DRP

R. Barkley, ORA

B. Sienel, DRP

John Thompson, NRR

S. Shaffer. DRP, SRI

RidsNrrDirslpabResource@nrc.gov

B. Hasgensen, DRP. RI

ROPReportsResource@nrc.gov

J. Kratty. DRP. RI

Region I Docket Room (with concurrences)

C. Kowalyshyn, OA

L. Trocine, RI OEDO

RldsNRRPM Millstone Resource

DOCUMENT NAME: S:\\ROP*10 EOC Review\\Branch 5\\MS\\2009 Annual Assessment Letter MS.doc

SUNSI Review Complete: _..:..TC=.S=--__(Reviewer's Initials)

ML100621420

After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, Indicate In the box:

ne" =Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" =No copy

OFFICE

RI/DRP

I

RI/DRP

I

RIIDRP

I

NAME

T SetzerrrCS

D Jackson/ALB for ABurritt

DATE

3/2/10

3/2/10

3/2/10

OFFICIAL RECORD COpy

Page 1 of2'

. ;.;,,' ~ ; . :

.. ,<Millstone 2

'..'-:.:;

0310112010

.12:3~:37

Inspection I Activity Plan

Report 22

01/01/2010 - 06/30/2011

""""""'"

Planned Dates

Start

End

Title

'"WiegMAn

71152

-PI&R

4

2

0210812010

02112/2010

IP 711526

Identification and Resolution of Problems

2

0212212010

02/2612010

IP 711528

Identification and Resolution of Problems

71124

- OCC RAe SAFETY

1

2

02/0812010

02/12/2010

IP 71124.01

Radiological Hazard Assessment and Exposure Controls

2

02/08/2010

02/1212010

IP 71124.02

Occupational ALARA Planning and Controls

2

0210812010

0211212010

IP 71124.04

Occupational Dose Assessment

TI*18O

- PROCEDURES & PROCESSES- MANAGING FATIGUE

2

05/19/2010

0511912010

IP 25151180

Inspection of Procedures and Processes for Managing Fatigue

7111107T

- TRIENNIAL HEAT SINK

2

2

06121/2010

06/2512010

IP 7111107T

Heat Sink Performance

TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION

6

2

07/19/2010

0712312010

IP 7111105T

Fire Protection [Trienniaij

2

08102/2010

0810612010

IP 7111105T

Fire Protection [Triennial]

7111111 B

- REQUAL INSP (MS2) WITH P/F RESULTS

3

2

09113/2010

09117/2010

IP 7111111 B

Licensed Operator Requalification Program

71124

  • PUB RAD SAFETY - RADWASTE

1

2

08130/2010

09/0312010

IP 71124.08

Radioactive Solid Waste Processing and Radioactive Malerial Handling, Storage, and Transportation

EP EX

  • EP EXERCISE EVALUATION

4

2

10118/2010

10/2212010

IP 7111401

Exercise Evaluation

2

1011812010

10/2212010

lP 7111404

Emergency Action Level and Emergency Plan Changes

2

10/1812010

10/22/2010

IP 71151-EP01

DrllIlExercise Performance

2

10/18/2010

1012212010

IP 71151-EP02

ERO Drill Participation

2

10/18f2010

10f22/201 0

lP 71151-EP03

Alert & NotlficationSystem

ISFSI

- ANNUAL SAMPLE -ISFSIINSPECTION

2

10101/2010

12131/2010

IP 60855

Operation Of An lSFSI

MODS

- PERMANENT PLANT MODIFICATIONS

3

2

11/0112010

11/05/2010

IP 7111117T

Evaluations of Changes. Tests. or Experiments and Permanent Plant Modifications

2

11115/2010

1111912010

IP 7111117T

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

71124

- OCC RAD SAFETY -INSTRUMENTS & ISFSI

2

11/15/2010

11/19/2010

IP 60855

Operation Of An ISFSI

2

11/1512010

11/1912010

IP 71124,03

In-Plant Airbome Radioactivity Control and Mitigation

2

11/15/2010

1111912010

IP 71151

Performance Indicator Verification

TI-177

- MANAGING GAS ACCUMULATION IN ECCS

3

2

03/0712011

03111/2011

IP 2515/177

Managing Gas Accumulation In Emergency Core Cooling. Decay Heal Removal & Containment Spray System

his report does not inciude INPO and OUTAGE a.ctivilles.

This report shows only on-site and announced inspection procedures.

Page 2 of2

Millstone 2

i<~, :i'"

03101/2010

12:39:37

Inspection I Activity Plan

Report 22

01101/2010 - 06/30/2011

Planned Oates

Start

End

Title

7111108P

- U21NSERVICE INSPECTION

1

2

04/11/2011

04/2212011

IP 7111108P

Inservice Inspection Activities - PWR

~hiS report does not include INPO and OUTAGE activities.

l~is report shows only on-site and announced inspection procedures.

Page 1 of2

.... ,:n ")-'A"

Millstone 3 .

"""

.

03101/2010

12:44:45

.-~

Inspection f Activity* Plan

Report 22

0110112010 - 06130/2011

Planned Dates

Start

End

Title

  • PI&R

4

Identification and Resolution of Problems

Identification and Resolution of PrOblems

Radiological Hazard Assessment and Exposure Controls

Occupational ALARA Planning and Controls

Occupational Dose Assessment

- OCC RAn SAEFTY

Occupational AlARA Planning and Controls

- U31NSERVICE INSPECTION

1

Inservice Inspection Activities PWR

3

3

3

3

3

3

3

3

'3

3

3

3

3

3

3

3

3

3

3

3

3

3

02/0812010

0212212010

02/0812010

0210812010

02/0812010

04/19/2010

04/1912010

04/1912010

05/1912010

06121/2010

07/19/2010

0810212010

09113/2010

08130/2010

10/18/2010

10/1812010

10/1812010

10/1812010

10/1812010

11/01/2010

11/1512010

11/1512010

0211212010

02/2612010

0211212010

0211212010

0211212010

04123/2010

04/30/2010

04130/2010

71152

IP 71152B

IP 71152B

71124

IP 71124.01

IP 71124.02

IP 71124.04

71124

IP 71124.02

711110SP

IP 711110ap

TI*172

IP 2515/172

Reactor Coolant System Dissimillar Metal Butt Welds

  • PROCEDURES & PROCESSES* MANAGING FATIGUE

1

Inspection of Procedures and Processes for Managing Fatigue

- TRIENNIAL HEAT SINK

2

Heat Sink Performance

- TRIENNIAL FIRE PROTECTION INSPECTION

6

Fire Protection [Triennial]

Fire Protection [Triennial]

- REQUAL INSP (MS2) WITH PIF RESULTS

3

Licensed Operator Requalificatlon Program

  • PUB RAD SAFETY - RADWASTE

1

Radioactive Solid Waste ProcesSing and Radioactive Material Handling, Storage. and Transportation

- EP EXERCISE EVALUATION

4

Exercise Evaluation

Emergency Action Level and Emergency Plan Changes

05/1912010

0612512010

07/2312010

0810612010

0911712010

09/03/2010

10/22/2010

10/2212010

TI-1S0

IP 2515/180

7111107T

IP 711110rr

TRI FIRE

IP 7111105T

IP 7111105T

7111111 B

IP 7111111 B

71124

IP 71124.08

EP EX

IP 7111401

IP 7111404

10/2212010

lP 71151-EP01

DrilllExercise Performance

10/2212010

IP 71151-EP02

ERO Drill Participation

10/2212010

IP 71151-EP03

Alert & Notification System

MODS

11/0512010

IP 7111117T

11/1912010

IP 7111117T

71124

11/19/2010

IP 60855

- PERMANENT PLANT MODIFICATIONS

3

Evaluations of Changes, Tests. or Experiments and Permanent Plant Modilicatlons

Evaluations of Changes, Tests, or Experiments and Pennanent Plant Modifications

- OCC RAD SAFETY -INSTRUMENTS & ISFSI

1

Operation Of An ISFSI

his report does not include INPO and OUTAGE activities.

, This report shows only on-site and announced inspection procedures.

,

... :

,-',~.

Page 2of2

Millstone 3

031011201 0 ,"

12:44:45

  • Iilspection 1Activity Plan

Report 22

01/01/2010 - 0613012011

Planned Dates

,.........."

Start

End

Title

71124

- oce RAD SAFETY - INSTRUMENTS & ISFSI

3

11115/2010

11/1912010

IP 71124.03

ln-Plant Airborne RadIoactivity Control and Mitigation

3

1111512010

11/1912010

IP 71151

Performance Indicator Verification

TI-177

- MANAGING GAS ACCUMULATION IN EeeS

3

3

0310712011

03/11/2011

IP 25151177

Managing Gas Accumulation In Emergency Core Cooling. Decay Heat Removal & Containment Spray System

frllis report does not include INPO and ourAGE actJvlties.

This report shows only on-site and announced inspection procedures.