|
---|
Category:Inspection Plan
MONTHYEARML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) IR 05000336/20220062023-03-0101 March 2023 Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Reports 05000336/2022006 and 05000423/2022006) IR 05000336/20220052022-08-31031 August 2022 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2022005 and 05000423/2022005) IR 05000336/20224022022-05-23023 May 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000336/2022402 and 05000423/2022402 ML22081A1992022-03-28028 March 2022 Notification of Conduct of a Fire Protection Team Inspection IR 05000336/20210062022-03-0202 March 2022 Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Reports 05000336/2021006 and 05000423/2021006) IR 05000336/20210052021-09-0101 September 2021 Updated Inspection Plan for the Millstone Power Station, Units 2 and 3 (Report 05000336/2021005 and 05000423/2021005) IR 05000336/20200062021-03-0303 March 2021 Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Reports 05000336/2020006 and 05000423/2020006) ML20323A1092020-11-18018 November 2020 Information Request to Support Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000336/2021011 and 05000423/2021011 IR 05000336/20200052020-08-31031 August 2020 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Inspection Report 05000336/2020005 and 05000423/2020005) ML20160A1362020-06-0808 June 2020 Request for Information to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000336/2020013 and 05000423/2020013 ML20084J9452020-03-24024 March 2020 Ti 2515/194 Inspection Documentation Request IR 05000336/20190062020-03-0303 March 2020 Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Report 05000336/2019006 and 05000423/2019006) IR 05000336/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000336/2019005 and 05000423/2019005) IR 05000336/20180062019-03-0404 March 2019 Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Reports 05000336/2018006 and 05000423/2018006) IR 05000336/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000336/2018005 and 05000423/2018005) IR 05000336/20170062018-02-28028 February 2018 Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Report 05000336/2017006 and 05000423/2017006, Report 05000336/2017402 and 05000423/2017402, Report 05000336/2017501 and 05000423/2017501) IR 05000336/20170052017-08-28028 August 2017 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2017005 and 05000423/2017005) IR 05000336/20160062017-03-0101 March 2017 Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Report 05000336/2016006 and 05000423/2016006) IR 05000336/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Millstone Power Station, Units 2 and 3 (Report 05000336/2016005 and 05000423/2016005) ML16074A2562016-03-14014 March 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection 2016007 IR 05000336/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Report 05000336/2015006 and 05000423/2015006) IR 05000336/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Millstone Power Station Units 2 and 3 (Report 05000336/2015005 and 05000423/2015005) IR 05000336/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for Millstone Power Station, Units 2 and 3, (Report 05000336/2014001 and 05000423/2014001)(w/Inspection Plan) IR 05000336/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Millstone Power Station Units 2 and 3 (Report 05000336/2014006 and 05000423/2014006) IR 05000336/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Millstone Power Station Units 2 and 3 (Report 05000336/2013001 and 05000423/2013001)(w/Inspection Plan) IR 05000336/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Millstone Power Station Units 2 and 3 (Report 05000336-13-006 and 05000423-13-006) ML13198A4452013-07-12012 July 2013 Notification of Inspection of Implementation of Interim Cyber Security Milestones 1-7 ML13109A2232013-04-18018 April 2013 Notification of Conduct of a Triennial Fire Protection Baseline Inspection IR 05000336/20120012013-03-0404 March 2013 Annual Assessment Letter for Millstone Power Station Unit 2 and Unit 3 (Report 05000336/2012001 and 05000423/2012001) ML12244A4022012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Millstone Power Station Units 2 and 3 IR 05000336/20110012012-03-0505 March 2012 Unit 3 Annual Assessment Letter (Report 05000336/2011001) ML1124400122011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Millstone Power Station Unit 2 and Unit 3 IR 05000336/20100012011-03-0404 March 2011 Annual Assessment Letter for Millstone Power Station Unit 2 and Unit 3 (Report 05000336/2010001 and 05000423/2010001) ML1024405802010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Millstone Power Station ML1006214202010-03-0303 March 2010 Annual Assessment Letter - Millstone 2010 (Reports 05000336-10-001 and 05000423-10-001) ML0924401912009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Millstone Power Station IR 05000336/20090012009-03-0404 March 2009 Annual Assessment Letter - Millstone Power Station (Reports 05000336/2009001 and 05000423/2009001) ML0824702232008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Millstone IR 05000336/20080012008-03-0303 March 2008 IR 05000336-08-001, and IR 05000423-08-001, Millstone Power Station - Annual Assessment Letter ML0734709562007-12-13013 December 2007 ROP8 - Millstone - Change to Inspection Plan, 12/13/07 ML0724309462007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Millstone Station Units 2 and 3 ML0706104642007-03-0202 March 2007 Annual Assessment Letter - EOC 2006 - Millstone (05-336/2007001 and 05-423/2007001) ML0624305322006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Millstone Station Units 2 and 3 IR 05000336/20060012006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Millstone Power Station Units 2 and 3 (Reports 05000336-06-001 and 05000423-06-001) ML0524207162005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Millstone Station, Units 2 and 3 IR 05000336/20050012005-03-0202 March 2005 Annual Assessment Letter - Millstone Units 2 & 3 (Report (05000336/2005001 and 05000423/2005001) ML0424402162004-08-30030 August 2004 Mid-Cycle Performance Review and Inspection Plan - Millstone Power Station Unit 2 and Unit 3 ML0406301592004-03-0303 March 2004 Annual Assessment Letter - Millstone 2024-01-04
[Table view] Category:Letter
MONTHYEARML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23334A2242023-11-30030 November 2023 Request for Exemption from Enhanced Weapons Firearms Background Checks, and Security Event Notifications Implementation ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23317A2702023-11-13013 November 2023 Core Operating Limits Report, Cycle 23 IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 ML23298A1652023-10-26026 October 2023 Requalification Program Inspection IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) ML23248A2132023-08-30030 August 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. ML23242A0142023-08-30030 August 2023 Operator Licensing Examination Approval ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits IR 05000336/20230022023-08-0909 August 2023 Integrated Inspection Report 05000336/2023002 and 05000423/2023002 ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000336/20234012023-07-17017 July 2023 Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23159A2202023-06-0808 June 2023 Associated Independent Spent Fuel Storage Installation Revision to Emergence Plan - Report of Changes IR 07200047/20234012023-06-0808 June 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 2024-01-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 4, 2012 Mr. David Heacock Sr. Vice President and Chief Nuclear Officer Dominion Resources 500 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
MILLSTONE POWER STATION UNIT 2 AND UNIT 3 (REPORT 05000336/2012006 and 05000423/2012006)
Dear Mr. Heacock:
On August 14, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Millstone Power Station Unit 2 and Unit 3. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
This assessment reflects the integration of the Security Cornerstone into the Reactor Oversight Process (ROP) performance assessment program governed by Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program.
The NRC determined the performance at Millstone Power Station Unit 2 during the most recent quarter was within the Regulatory Response Column of the NRCs ROP Action Matrix based on one finding assigned to the second quarter of 2011 having low to moderate safety significance (White) in the Initiating Events Cornerstone. This finding involved the failure of Unit 2 Millstone personnel to carry out their assigned roles and responsibilities and inadequate reactivity management during main turbine valve testing, which contributed to an unintended eight percent reactor power transient (88 percent to 96 percent) on February 12, 2011.
As a result of our review of Millstone Power Station Unit 2 performance, we plan to conduct a supplemental inspection using NRC Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, in September 2012. This inspection procedure is conducted to provide assurance that the root cause and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.
The NRC determined the performance at Millstone Power Station Unit 3 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at Unit 3.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan.
D. Heacock 2 In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns, and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Dr. Ronald R. Bellamy at (610) 337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/
Darrell J. Roberts, Director Division of Reactor Projects Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49
Enclosure:
Millstone Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML12244A402 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME TSetzer RBellamy DRoberts DATE 08/28/12 08/29/12 08/30/12 Page 1 of 3 Millstone 08/30/2012 12:33:38 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP ANNUAL REPORT 4 2, 3 06/30/2012 12/31/2012 IP 7111406 Drill Evaluation EP EX - EP EXERCISE EVALUATION 9 2, 3 06/21/2012 08/28/2012 IP 7111401 Exercise Evaluation 2, 3 08/19/2012 08/24/2012 IP 71151 Performance Indicator Verification 71152B - PI&R 4 2, 3 07/16/2012 07/20/2012 IP 71152B Problem Identification and Resolution 2 07/30/2012 08/03/2012 IP 71152B Problem Identification and Resolution TI 182 - DEGRADATION OF UNDERGROUND PIPING 1 2, 3 07/09/2012 07/13/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 71124 - RADWASTE 1 2, 3 07/23/2012 07/27/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 7111111B - MS2 ON-SITE REQUAL INSP W/ P/F RESULTS 2 2 09/17/2012 09/21/2012 IP 7111111B Licensed Operator Requalification Program 71152 - PIR SAMPLE MILLSTONE COMMITMENT FOLLOWUP 1 2, 3 07/30/2012 08/03/2012 IP 71152 Problem Identification and Resolution 2515/188 - SEISMIC WALKDOWNS 3 2, 3 08/06/2012 08/10/2012 IP 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 2515/187 - FLOODING WALKDOWNS 3 2, 3 08/20/2012 08/24/2012 IP 2515/187 Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 95001 - 95001 SUPPLEMENTAL INSPECTION 2 2 09/17/2012 09/21/2012 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 71124 - OCC RADIATION SAFETY 1 2, 3 10/15/2012 10/19/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 10/15/2012 10/19/2012 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 10/15/2012 10/19/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 10/15/2012 10/19/2012 IP 71124.04 Occupational Dose Assessment 7111108P - UNIT 2 INSERVICE INSPECTION 1 2 10/15/2012 10/26/2012 IP 7111108P Inservice Inspection Activities - PWR 71124 - OCC RAD SAFETY 1 2, 3 12/10/2012 12/14/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 12/10/2012 12/14/2012 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 12/10/2012 12/14/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 3 Millstone 08/30/2012 12:33:38 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - OCC RAD SAFETY 1 2, 3 12/10/2012 12/14/2012 IP 71124.04 Occupational Dose Assessment 71124 - HP INSTRUMENTATION 1 2, 3 12/17/2012 12/21/2012 IP 71124.05 Radiation Monitoring Instrumentation EP - EP ANNUAL REPORT 4 2, 3 07/01/2013 12/31/2013 IP 7111406 Drill Evaluation MODS - PERMANENT PLANT MODIFICATIONS 7 2, 3 01/28/2013 02/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 2, 3 02/11/2013 02/15/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications EP PROGR - EP PROGRAM INSPECTION 1 2, 3 02/11/2013 02/15/2013 IP 7111402 Alert and Notification System Testing 2, 3 02/11/2013 02/15/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2, 3 02/11/2013 02/15/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 02/11/2013 02/15/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 8/12 EXM - MILLSTONE 2 INITIAL EXAM 4 2 07/15/2013 07/19/2013 U01871 FY13-MILLSTONE 2 INITIAL OPERATOR LICENSING EXAM 2 08/12/2013 08/16/2013 U01871 FY13-MILLSTONE 2 INITIAL OPERATOR LICENSING EXAM 7111108P - U3 INSERVICE INSPECTION 1 3 04/15/2013 04/26/2013 IP 7111108P Inservice Inspection Activities - PWR 71124 - OCC RADIATION SAFETY 1 2, 3 04/29/2013 05/03/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 04/29/2013 05/03/2013 IP 71124.02 Occupational ALARA Planning and Controls 71124 - REMP 1 2, 3 05/20/2013 05/24/2013 IP 71124.07 Radiological Environmental Monitoring Program 7111111B - MILLSTONE 3 REQUAL INSP WITH P/F RESULTS 2 3 08/26/2013 08/30/2013 IP 7111111B Licensed Operator Requalification Program TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 7 2, 3 07/22/2013 07/26/2013 IP 7111105T Fire Protection [Triennial]
2, 3 08/05/2013 08/09/2013 IP 7111105T Fire Protection [Triennial]
10/21EXM - MILLSTONE 3 INITIAL EXAM 4 3 11/04/2013 11/08/2013 U01874 FY14-MILLSTONE 3 INITIAL OPERATOR LICENSING EXAM 3 12/02/2013 12/11/2013 U01874 FY14-MILLSTONE 3 INITIAL OPERATOR LICENSING EXAM This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 3 of 3 Millstone 08/30/2012 12:33:38 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111107T - TRIENNIAL HEAT SINK 1 2, 3 07/29/2013 08/09/2013 IP 7111107T Heat Sink Performance 71124 - RADIO EFFLUENTS 1 2, 3 08/26/2013 08/30/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2, 3 08/26/2013 08/30/2013 IP 71151 Performance Indicator Verification 71124 - ALARA, IN-PLANT AIRBORNE AND DOSE ASSESS 1 2, 3 09/23/2013 09/27/2013 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 09/23/2013 09/27/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 09/23/2013 09/27/2013 IP 71124.04 Occupational Dose Assessment 71124 - RAD HAZARD, IN-PLANT AIRBORNE, DOSE ASSE 1 2, 3 12/16/2013 12/20/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 12/16/2013 12/20/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 12/16/2013 12/20/2013 IP 71124.04 Occupational Dose Assessment 2, 3 12/16/2013 12/20/2013 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.