February 28, 2024
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR MILLSTONE POWER STATION, UNITS 2 AND 3 (REPORTS 05000336/2023006 AND 05000423/2023006)
Dear Eric Carr:
The U.S Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Millstone Power Station (Millstone), Units 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Millstone, Units 2 and 3, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e.,
Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Although plant performance was within the Licensee Response Column (Column 1), the NRC has not yet finalized the issues identified during the Special Inspection that was established to assess the circumstances surrounding a security event that occurred on November 8, 2023, as documented in SPECIAL INSPECTION REPORT 05000336/2023440 AND 05000423/2023440.
The final safety significance determination may affect the NRCs assessment of plant performance and the enclosed inspection plan.
The enclosed inspection plan lists the inspections scheduled through December 31, 2025.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In addition to baseline inspections, the NRC will implement Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal Phase 1 and 2, at your facility.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5205 with any questions you have regarding this letter.
Sincerely, Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety
Docket Nos. 05000336 and 05000423 License Nos. DPR-65 and NPF-49
Enclosure:
As stated
cc w/ encl: Distribution via LISTSERV
Matthew R.
Young Digitally signed by Matthew R. Young Date: 2024.02.28 07:22:09 -05'00'
SUNSI Review
x Non-Sensitive
Sensitive
x Publicly Available
Non-Publicly Available
OFFICE RI/DORS RI/DORS
NAME SElkhiamy MYoung
DATE 2/22/2024 2/22/2024
Site Inspection Activity Plan Millstone 01/01/2024 - 12/31/2025 Unit Start End Activity CAC Title Staff Count Access Auth, Fitness for Duty
2,3 1/8/2024 1/12/2024 IP 71130.01 000733 Access Authorization 2,3 1/8/2024 1/12/2024 IP 71130.08 000740 Fitness-For-Duty Program 2,3 4/1/2024 4/5/2024 IP 71130.01 000733 Access Authorization 2,3 4/1/2024 4/5/2024 IP 71130.08 000740 Fitness-For-Duty Program Comprehensive Engineering Team Inspection - Millstone
2,3 2/26/2024 3/1/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 2,3 3/11/2024 3/15/2024 IP 71111.21M 000713 Comprehensive Engineering Team Inspection PI&R Biennial Team Inspection - Millstone
2,3 4/29/2024 5/3/2024 IP 71152B 000747 Problem Identification and Resolution 2,3 5/13/2024 5/17/2024 IP 71152B 000747 Problem Identification and Resolution EP Exercise Inspection - Millstone
2,3 6/3/2024 6/7/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2,3 6/3/2024 6/7/2024 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 2,3 6/3/2024 6/7/2024 IP 71151 001397 Performance Indicator Verification ISFSI Loading Campaign
2,3 6/10/2024 6/14/2024 IP 60855 001001 Operation Of An ISFSI 71124.06 - RETS
2,3 9/2/2024 9/6/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment MS2 Initial Operator Licensing Exam
2 8/5/2024 8/9/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
9/9/2024 9/13/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Access Control, Equipment Testing and Maintenance, Training, SPR
2,3 9/9/2024 9/13/2024 IP 71130.02 000734 Access Control 2,3 9/9/2024 9/13/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2,3 9/9/2024 9/13/2024 IP 71130.07 000739 Security Training 2,3 9/9/2024 9/13/2024 IP 71130.09 001656 Security Plan Changes 2,3 9/9/2024 9/13/2024 IP 71151 001338 Performance Indicator Verification Inservice Inspection - Millstone Unit 2
2 10/7/2024 10/18/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
2,3 11/4/2024 11/8/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 71151 - RP PIV
Prepared on 1/31/2024 10:29:58 PM 1 of 3
Site Inspection Activity Plan 2,3 11/12/2024 11/15/2024 IP 71151 000746 Performance Indicator Verification MS2 Requal Insp with P/F Results
2 11/25/2024 11/29/2024 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance
11/25/2024 11/29/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Cyber Security - Millstone
2,3 12/9/2024 12/13/2024 IP 71130.10 000741 Cybersecurity RP - 71124.03 Airborne and 71124.04 Dose
2,3 1/27/2025 1/31/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2,3 1/27/2025 1/31/2025 IP 71124.04 000728 Occupational Dose Assessment License Renewal Phase 1 - Millstone Unit 3
3 4/14/2025 5/2/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal Inservice Inspection - Millstone Unit 3
3 4/14/2025 4/25/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
71124.01 - Rad Assessment & Exposure Controls
2,3 4/28/2025 5/2/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls EP Program Inspection - Millstone
2,3 5/19/2025 5/23/2025 IP 71114.02 000717 Alert and Notification System Testing 2,3 5/19/2025 5/23/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2,3 5/19/2025 5/23/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2,3 5/19/2025 5/23/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 2,3 5/19/2025 5/23/2025 IP 71151 001397 Performance Indicator Verification 71124.07 - REMP
2,3 5/19/2025 5/23/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program Access Control, Protective Strategy, TSR, SPR, PIs - MS
2,3 6/23/2025 6/27/2025 IP 71130.02 000734 Access Control 2,3 6/23/2025 6/27/2025 IP 71130.05 000737 Protective Strategy Evaluation 2,3 6/23/2025 6/27/2025 IP 71130.09 001656 Security Plan Changes 2,3 6/23/2025 6/27/2025 IP 71130.14 000743 Review of Power Reactor Target Sets 2,3 6/23/2025 6/27/2025 IP 71151 001338 Performance Indicator Verification License Renewal Phase 2 - Millstone Unit 3
3 7/7/2025 7/11/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal
7/21/2025 7/25/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal 71124.05 - Instrumention
2,3 7/14/2025 7/18/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 2025 MS3 Initial Operator Licensing Exam
Prepared on 1/31/2024 10:29:58 PM 2 of 3
Site Inspection Activity Plan
8/25/2025 8/29/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
9/15/2025 9/19/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Age Related Degradation Inspection - Millstone
2,3 9/22/2025 10/10/2025 IP 71111.21N.04 001832 Age-Related Degradation 71124.08 - Rad Waste & Transportation
2,3 10/6/2025 10/10/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation MS3 Requal Inspection with P/F Results
3 12/1/2025 12/5/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance
12/1/2025 12/5/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Prepared on 1/31/2024 10:29:58 PM 3 of 3