MONTHYEARIR 05000245/20240012024-11-12012 November 2024 Safstor Inspection Report 05000245/2024001 IR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) IR 05000336/20240112024-04-0101 April 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000336/2024011 and 05000423/2024011 IR 05000336/20230062024-02-28028 February 2024 Annual Assessment Letter for Millstone Power Station, Units 2 and 3, (Reports 05000336/2023006 and 05000423/2023006) IR 05000336/20230042024-02-14014 February 2024 Integrated Inspection Report 05000336/2023004 and 05000423/2023004 IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) IR 05000336/20230022023-08-0909 August 2023 Integrated Inspection Report 05000336/2023002 and 05000423/2023002 IR 05000336/20234012023-07-17017 July 2023 Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) IR 07200047/20234012023-06-0808 June 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 IR 05000336/20230012023-05-0808 May 2023 Integrated Inspection Report 05000336/2023001 and 05000423/2023001 IR 05000336/20234032023-05-0202 May 2023 Public - Millstone Power Station, Units 2 and 3 – Final Significance Determination of Green Finding; Inspection Report 05000336/2023403 and 05000423/2023403 IR 05000336/20233022023-03-0707 March 2023 Operator Licensing Retake Examination Report 05000336/2023302 IR 05000336/20220062023-03-0101 March 2023 Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Reports 05000336/2022006 and 05000423/2022006) IR 05000336/20220042023-02-13013 February 2023 Integrated Inspection Report 05000336/2022004 and 05000423/2022004 IR 05000336/20224012023-01-26026 January 2023 Security Baseline Inspection Report 05000336/2022401 and 05000423/2022401 and Preliminary Finding(S) of Greater than Very Low Significance and Apparent Violation(S) (Cover Letter Only) IR 05000245/20220012023-01-0909 January 2023 – Safstor Inspection Report 05000245/2022001 IR 05000336/20224032023-01-0505 January 2023 Cyber Security Inspection Report 05000336/2022403 and 05000423/2022403 IR 05000336/20225012022-12-14014 December 2022 Reissued Emergency Preparedness Biennial Exercise Inspection Report 05000336/2022501 and 05000423/2022501 IR 05000336/20223012022-11-22022 November 2022 Initial Operator Licensing Examination Report 05000336/2022301 ML22325A1042022-11-21021 November 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2022501 and 05000423/2022501 IR 05000336/20220032022-11-14014 November 2022 Integrated Inspection Report 05000336/2022003 and 05000423/2022003 IR 05000336/20220102022-11-0101 November 2022 Biennial Problem Identification and Resolution Inspection Report 05000336/2022010 and 05000423/2022010 IR 05000336/20220112022-09-0808 September 2022 Triennial Fire Protection Inspection Report 05000336/2022011 and 05000423/2022011 IR 05000336/20220052022-08-31031 August 2022 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2022005 and 05000423/2022005) IR 05000336/20220022022-08-11011 August 2022 Integrated Inspection Report 05000336/2022002 and 05000423/2022002 IR 05000336/20224022022-05-23023 May 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000336/2022402 and 05000423/2022402 IR 05000336/20220012022-05-10010 May 2022 Integrated Inspection Report 05000336/2022001 and 05000423/2022001 IR 05000423/20223022022-03-0707 March 2022 Operator Licensing Retake Examination Report 05000423/2022302 IR 05000336/20210062022-03-0202 March 2022 Annual Assessment Letter for Millstone Power Station, Units 2 and 3 (Reports 05000336/2021006 and 05000423/2021006) IR 05000336/20210042022-02-10010 February 2022 Integrated Inspection Report 05000336/2021004 and 05000423/2021004 IR 05000336/20210032021-11-12012 November 2021 Integrated Inspection Report 05000336/2021003 and 05000423/2021003 IR 05000423/20213012021-11-10010 November 2021 Initial Operator Licensing Examination Report 05000423/2021301 2024-08-06
[Table view] Category:Letter
MONTHYEARIR 05000245/20240012024-11-12012 November 2024 Safstor Inspection Report 05000245/2024001 ML24317A2562024-11-12012 November 2024 Core Operating Limits Report, Gycle 30 IR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report 2024-09-04
[Table view] |
Text
September 19, 2023
SUBJECT:
MILLSTONE POWER STATION, UNIT 1 - SAFSTOR INSPECTION REPORT 05000245/2023001
Dear Daniel Stoddard:
On August 24, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, at the permanently shutdown Millstone Power Station, Unit 1 (MS-1). The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and the conditions of your license. The inspection consisted of observations by the inspectors, interviews with site personnel, a review of procedures and records, and plant walk-downs. The results of the inspection were discussed with Guy Blackburn, Plant Manager, and other members of your staff on August 24, 2023, and are described in the enclosed report.
Within the scope of this inspection, no violations of more than minor safety significance were identified.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure(s), and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the NRC Agencywide Document and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response, if any, should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Current NRC regulations and guidance are included on the NRCs website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRCs website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under Related Information). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Orysia Masnyk Bailey of my staff at 864-427-1032 if you have any questions regarding this matter.
Sincerely, Anthony Dimitriadis, Chief Decommissioning, ISFSI, and Reactor Health Physics Branch Division of Radiological Safety and Security Docket No: 05000245 License No: DPR-21 Enclosure: Inspection Report No. 05000245/2023001 w/ Attachment cc w/encl: Distribution via ListServ Anthony M.
Dimitriadis Digitally signed by Anthony M. Dimitriadis Date: 2023.09.19 08:59:41 -04'00'
EXECUTIVE SUMMARY
Dominion Energy, Inc.
Millstone Power Station, Unit 1 NRC Inspection Report No. 5000245/2023001
A routine, announced SAFSTOR safety inspection was completed on August 24, 2023, at the permanently shut down Millstone Power Station, Unit 1 (MS-1). The inspection included a review of activities related to the safe storage of radioactive material, including site operations, engineering, maintenance, plant support activities, management oversight, site radiological programs, and corrective action program (CAP) implementation. The inspection consisted of observations by the inspectors, interviews with site personnel, a review of procedures and records, and plant walk-downs. At the time of the inspection, no ongoing decommissioning activities were being conducted at MS-1. The U.S. Nuclear Regulatory Commissions (NRCs)program for overseeing the safe storage (SAFSTOR) of a shutdown nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program.
Based on the results of this inspection, no violations of more than minor safety significance were identified.
REPORT DETAILS
1.0 Background
MS-1 went into commercial operation on December 28, 1970, and permanently ceased operation on July 17, 1998. Subsequently, the fuel was permanently removed from the reactor vessel and is currently stored in the spent fuel pool. MS-1 is in safe storage (SAFSTOR), and Dominion Energy, Inc. (Dominion) plans to actively decommission MS-1 in the future, possibly in parallel with the decommissioning of the operational units after they have been permanently shut down. Operations and radiation protection and chemistry personnel from Millstone Power Station Unit 2 (MS-2) provide routine support functions to MS-1.
The NRCs program for overseeing the safe storage of a shutdown nuclear power reactor is described in IMC 2561.
2.0 SAFSTOR Performance and Status Review
a. Inspection Scope
(Inspection Procedures 37801, 40801, 60801, 64704, 71801, 83750, 84750, 86750)
A routine announced safety inspection was conducted August 22-24, 2023, at Unit 1. The inspection consisted of observations by the inspectors, interviews with site personnel, a review of procedures and records, and plant walk-downs. The inspectors reviewed the SAFSTOR program as outlined in the defueled safety analysis report and technical specifications and assessed the adequacy of management oversight of SAFSTOR responsibilities for the MS-1 facility.
Specifically, the inspectors reviewed documentation of the decommissioning management and staff organization and Dominions implementation of SAFSTOR activities related to safe storage of radioactive material. The inspectors also conducted walk-downs to assess the material condition of the MS-1 facility including the reactor building, fuel handling floor, and turbine building and discussed any design changes or modifications since the previous inspection, conducted in 2022.
The inspectors reviewed MS-1s program for the safe wet storage of spent fuel.
The inspectors performed a walk-down of the spent fuel pool and associated support systems to assess material condition, configuration control, and system operation.
Additionally, the inspectors reviewed the associated water chemistry analytical data and examined the controls and indications relevant to MS-1 that are available to operators in the MS-2 control room.
The inspectors reviewed activities, components, and documentation associated with the following SAFSTOR programs: occupational exposure, fire protection, radioactive effluent control, site radiological environmental monitoring program (REMP), maintenance, surveillance, decommissioning organization, and staffing. The inspectors reviewed records of radiological surveys, the annual REMP report, the annual effluent release report, and MS-1 firefighting strategies and procedures.
The inspectors reviewed Dominion fleet audit reports and CAP documents associated with MS-1 to determine if issues had been appropriately identified, assessed, and reviewed, and that corrective actions had been appropriately implemented.
b. Observations and Findings
The inspectors verified that the SAFSTOR program was effectively implemented.
The inspectors verified that the maintenance and surveillance program for systems and components had been conducted in accordance with the technical specification requirements and established procedures. The inspectors also confirmed that no dismantlement or decommissioning activities were performed since the previous inspection. The inspectors determined that MS-1 was safely storing spent fuel in wet storage.
The inspectors noted that there were no temporary or permanent modifications to the site since the last SAFSTOR inspection performed in calendar year 2022. The inspectors reviewed information relevant to the status of the decommissioning trust fund and its expenditures, as provided by Dominion during the inspection period, with no concerns identified.
As previously indicated, MS-2 operations staff support maintenance activities at MS-1. The inspectors reviewed MS-1s firefighting strategies and noted that the fire brigade staffed from MS-2 and MS-3s operations would respond in the event of a fire at MS-1. Fire drills were routinely performed at MS-1 and staff had completed familiarization activities in MS-1 during training. The inspectors noted that MS-2 health physics supported maintenance work at MS-1 by performing surveys, providing radiation protection coverage for any emerging work, and providing radiation protection briefings as necessary.
The annual radiological effluent and the annual REMP reports demonstrated that all calculated doses were below regulatory dose criteria outlined in 10 CFR 50, Appendix I, Numerical Guides for Design Objectives and Limiting Conditions for Operation to Meet the Criterion As Low as is Reasonably Achievable for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents. The inspectors noted that MS-1 had one shipment of Class A dry active waste for offsite disposal (Energy Solutions) since the last inspection. Additionally, the inspectors discussed shipping requirements and processes with site staff to gain an understanding of the sites experience and expertise on shipping radwaste.
Findings or issues identified from audits, plant equipment operator rounds, and staff observations had been entered into the CAP. Site staff effectively addressed identified issues, implemented corrective actions, and tracked them to closure.
Condition reports and corrective actions appeared to be prioritized and evaluated commensurate with their safety significance.
c. Conclusions
No violations of more than minor safety significance were identified.
3.0
Exit Meeting Summary
On August 24, 2023, the inspectors presented the inspection results to Guy Blackburn, Plant Manager, and other members of the Millstone Power Station staff who acknowledged the inspection results. No proprietary information was retained by the inspectors or documented in this report.
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
Millstone Power Station Personnel
- G. Blackburn, Plant Manager
- L. Armstrong, Director, Safety & Licensing
- G. Baker, Unit 2 OPS Shift Manager
- D. Beachy, Supervisor Licensing
- C. Dix, Radiation Material Control Supervisor
- D. Edwards, Assistant Plant Manager
- T. Gardner, Unit 1 Equipment Operator
- B. McCollum, Engineering Technical Specialist III
- D. Rowe, Manager, Emergency Preparedness & Licensing
- J. Rowland, Licensing Lead, Engineering Technical Specialist II
- M. Sweet, Superintendent, Health Physics Operations
- C. Wooten, Manager, Radiological Protection & Chemistry
- M. Wynn, Superintendent, Health Physics Technical Services
- J. Zummo, Supervisor, Exposure Control & Instrumentation
ITEMS OPEN, CLOSED, AND DISCUSSED
None
LIST OF DOCUMENTS REVIEWED
Condition Reports
217145
21108
233124
218399
28090
233125
21105
28122
Miscellaneous
23 SFP Chemistry Samples and Analysis
23 Unit 1 Radiological Surveys
23 Annual Radioactive Effluent Release Report
23 Annual Radiological Environmental Operating Report
23 Waste Shipment Records
DOM-QA-1, Nuclear Facility Quality Assurance Program Description, Rev. 35
MPG-22-01092, Rev. 3, Upgrades on Unit 1 & 2 Turbine Bldg. Cranes (M1TBC-1 & M2H11)
Millstone Power Station Unit 1 Decommissioning Funding Status Report, March 2023
Millstone Power Station Unit 1 Defueled Safety Analysis Report, Rev. 18
Millstone Power Station Unit 1 Defueled Technical Requirements Manual Millstone
Power Station Unit 1 Defueled Technical Specifications
Year -B4C Blackness Testing
Millstone Unit 1, Fire Hazards Analysis, Rev. 6
MP-PROC-OPS-SF9-001 Technical Procedure Approval, Unit 1 Fire Extinguisher Inspection
OP 312K, Sample Tank Radioactive Liquid Discharge Surveillance, Dated 12/1/17
SP 608AA, Backup Diesel Generator Loaded Run Surveillance, dated 3/28/2012
SP 682.2, Oil Separator Pit Inspection Surveillance, dated 6/1/2016
SP 2669B, Unit 1 Cold and Dark Area Inspections, dated 4/26/2012
SP1054A Spent Fuel Rack Surveillance Program Boron Carbide Plate
Topical Report DOM-QA-1, Dominion Energy Nuclear Facility Quarterly Assurance
Description, R 35
SP 2669B, Unit 1 Operator Logs and Inspections
Procedures
CM-AA-FPA-101, Control of Combustible and Flammable Materials, Rev. 16
CM-AA-FPA-102, Fire Protection and Fire Safe Shutdown Review and Preparation Process
and Design Change Process, Rev. 11
CM-AA-FPA-100, Fire Protection/Appendix R (Fire Safe Shutdown) Program, Rev. 20
ETE-MP-2021-1035, Fire Protection Program Manual
MP-22-REC-BAP01, Radiological Effluent Monitoring and Offsite Dose Calculation
Manual, Rev. 32
SP 419 Spent Fuel Pool Island Instrumentation Calibration, Rev.1
Work Orders
53102445515
203335978
53102937089
203308279
203314032
203368837
LIST OF ACRONYMS USED
ADAMS
Agencywide Document and Management System
CAP
Corrective Action Program
CFR
Code of Federal Regulations
Dominion
Dominion Energy, Inc.
GPO
Government Printing Office
IMC
Inspection Manual Chapter
MS-1
Millstone Power Station Unit 1
MS-2
Millstone Power Station Unit 2
NRC
U.S. Nuclear Regulatory Commission
REMP
Radiological Environmental Monitoring Program