Mid-cycle Performance Review and Inspection Plan - Millstone Station Units 2 and 3
ML062430532
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/31/2006
From: Brian Holian
Division Reactor Projects I
To: Christian D
Dominion Resources
Krohn P, RI/DRP/PB6/610-337-5120
References
Download: ML062430532 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glenn Allen, VA 23060-6711

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

MILLSTONE STATION UNITS 2 AND 3

Dear Mr. Christian:

On August 8, 2006, the NRC staff completed its performance review of Millstone Station Units 2 and 3 for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at Millstone Unit 2 was within the Regulatory Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and a White PI for Scrams with a Loss of Normal Heat Removal (LONHR). On May 15, 2006, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the LONHR Scram PI. Therefore, we plan to conduct supplemental inspection 95001 beginning on September 11, 2006.

Plant performance for the most recent quarter at Millstone Unit 3 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at Unit 3.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. In addition to baseline inspections, we plan on conducting two other inspections for activities related to the Unit 2 pressurizer installation and independent spent fuel storage facility operations. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival

D. A. Christian 2 onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Paul Krohn at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Brian E. Holian, Director Division of Reactor Projects Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49

Enclosure:

Millstone Units 2 and 3 Inspection/Activity Plan

D. A. Christian 3 cc w/encl:

J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.

R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)

S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority Institute of Nuclear Power Operations

D. A. Christian 4 Distribution w/encl: VIA E-MAIL:

S. Collins, RA M. Dapas, DRA B. Holian, DRP D. Lew, DRP A. Blough, DRS M. Gamberoni, DRS S. Schneider, Senior Resident Inspector E. Bartels, Resident OA P. Krohn, DRP S. Barber, DRP B. Sosa, RI OEDO D. Roberts, NRR V. Nerses, NRR E. Miller, NRR D. Screnci, PAO J. Rogge, DRS L. Doerflein, DRS M. Sykes, DRS R. Lorson, DRS D. Jackson, DRS J. White, DRS Region I Docket Room (with concurrences)

SUNSI Review Complete: ____PGK___ (Reviewer's Initials)

DOCUMENT NAME: S:\ROP 7 Mid Cycle Review\2006 ROP7 Mid-Cycle Letters\MILLSTONE Station 2006 Midcycle letter.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME SBarber/GSB Mschneider/PGK for PKrohn/PGK BHolian/BEH DATE 08/11/2006 08/30/06 08/30/06 08/31/06 OFFICIAL RECORD COPY

Page 1 of 3 Millstone 08/31/2006 09:43:36 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 60855.1 - OPERATION OF AN ISFSI 3 2, 3 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 05/01/2006 09/15/2006 Other Routine 7111111B - L.O. REQUAL.PROG.(FOCUS U2)+P/F RVW 2 2, 3 IP 7111111B Licensed Operator Requalification Program 09/04/2006 09/08/2006 Baseline Inspections 50003 - PRESSURIZER REPLACEMENT 1 2 IP 50003 Pressurizer Replacement Inspection 08/01/2006 08/04/2006 Safety Issues 2 IP 50003 Pressurizer Replacement Inspection 08/20/2006 08/24/2006 Safety Issues 2 IP 50003 Pressurizer Replacement Inspection 10/01/2006 10/04/2006 Safety Issues 2 IP 50003 Pressurizer Replacement Inspection 11/06/2006 11/10/2006 Safety Issues 2 IP 50003 Pressurizer Replacement Inspection 11/20/2006 11/22/2006 Safety Issues ISFSI - ISFSI 2 2, 3 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/01/2006 08/31/2006 Other Routine 7111107B - U2: HEAT SINK 1 2 IP 7111107B Heat Sink Performance 07/10/2006 07/14/2006 Baseline Inspections TI-169 - MSPI VERIFICATION 1 2, 3 IP 2515/169 Mitigating Systems Performance Index Verification 08/04/2006 09/01/2006 Safety Issues 95001 - SCRAMS WITH LOSS OF NORMAL HEAT REMOVAL 2 2 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 09/11/2006 09/15/2006 Supplemental Program 7112202 - PUB RAD SAFETY - RADWASTE 1 2, 3 IP 7112202 Radioactive Material Processing and Transportation 09/18/2006 09/22/2006 Baseline Inspections 7111108P - INSERVICE INSPECTION - UNIT 2 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/10/2006 10/13/2006 Baseline Inspections 2 IP 7111108P Inservice Inspection Activities - PWR 10/23/2006 10/27/2006 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 2, 3 IP 7112102 ALARA Planning and Controls 11/13/2006 11/17/2006 Baseline Inspections TI-166 - UNIT 2 CONTAINMENT SUMP MODS INSPECTION 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 11/13/2006 11/17/2006 Safety Issues 7111112B - MAINTENANCE RULE 1 2, 3 IP 7111112B Maintenance Effectiveness 11/27/2006 12/01/2006 Baseline Inspections 7111107 - U3 BIENNIAL HEAT SINK INSP 2 2, 3 IP 7111107B Heat Sink Performance 01/08/2007 01/12/2007 Baseline Inspections 3/12 EXM - U3 OPERATOR LICENSING INITIAL EXAMS 3 3 U01638 MILLSTONE 3 INITIAL EXAM (FY07) 02/12/2007 02/16/2007 Not Applicable 3 U01638 MILLSTONE 3 INITIAL EXAM (FY07) 03/12/2007 03/23/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Millstone 08/31/2006 09:43:36 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7112101 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 02/12/2007 02/16/2007 Baseline Inspections 7111108P - IN-SERVICE INSPECTION - UNIT 3 1 3 IP 7111108P Inservice Inspection Activities - PWR 04/09/2007 04/20/2007 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 2, 3 IP 7112102 ALARA Planning and Controls 04/23/2007 04/27/2007 Baseline Inspections TI-166 - CONTAINMENT SUMP MODIFICATIONS - UNIT 3 1 3 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 04/23/2007 04/29/2007 Safety Issues 7112201 - PUB RAD SAFETY - RETS 1 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/04/2007 06/08/2007 Baseline Inspections 7111111B - L.O. REQUAL.PROG.(FOCUS U3)+P/F RVW 3 2, 3 IP 7111111B Licensed Operator Requalification Program 09/10/2007 09/14/2007 Baseline Inspections 71114 - EP PRGM INSP 1 2, 3 IP 7111402 Alert and Notification System Testing 09/10/2007 09/14/2007 Baseline Inspections 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 09/10/2007 09/14/2007 Baseline Inspections 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/10/2007 09/14/2007 Baseline Inspections 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 09/10/2007 09/14/2007 Baseline Inspections 2, 3 IP 71151-EP01 Drill/Exercise Performance 09/10/2007 09/14/2007 Baseline Inspections 2, 3 IP 71151-EP02 ERO Drill Participation 09/10/2007 09/14/2007 Baseline Inspections 2, 3 IP 71151-EP03 Alert & Notification System 09/10/2007 09/14/2007 Baseline Inspections TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 3 IP 7111105T Fire Protection [Triennial] 09/17/2007 09/21/2007 Baseline Inspections 3 IP 7111105T Fire Protection [Triennial] 10/01/2007 10/05/2007 Baseline Inspections 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/24/2007 09/28/2007 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 2, 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 10/15/2007 10/19/2007 Baseline Inspections 7111117B - MODS AND 50.59 4 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 11/05/2007 11/09/2007 Baseline Inspections 2, 3 IP 7111117B Permanent Plant Modifications 11/05/2007 11/09/2007 Baseline Inspections TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 2 IP 7111105T Fire Protection [Triennial] 01/14/2008 01/18/2008 Baseline Inspections 2 IP 7111105T Fire Protection [Triennial] 01/28/2008 02/01/2008 Baseline Inspections 7112101 - OCC RAD SAFETY - ACCESS 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 02/11/2008 02/15/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Millstone 08/31/2006 09:43:36 Inspection / Activity Plan Report 22 07/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71152B - PI&R 4 2, 3 IP 71152B Identification and Resolution of Problems 02/11/2008 02/15/2008 Baseline Inspections 2, 3 IP 71152B Identification and Resolution of Problems 02/25/2008 02/29/2008 Baseline Inspections 2/11EXAM - U2 OPERATOR LICENSING INITIAL EXAMS 3 2 U01634 MILLSTONE 2 INITIAL EXAM (FY08) 03/11/2008 03/14/2008 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.