2005 Mid-Cycle Review and Inspection Plan - Millstone Station, Units 2 and 3
ML052420716
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/30/2005
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To: Christian D
Dominion Resources
Krohn P, RI/DRP/PB6/610-337-5120
References
Download: ML052420716 (6)


Text

August 30, 2005 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glenn Allen, VA 23060-6711

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - MILLSTONE STATION UNITS 2 AND 3

Dear Mr. Christian:

On August 2, 2005, the NRC staff completed its performance review of Millstone Units 2 and 3 for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter for Millstone Units 2 and 3 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility. We also plan on conducting two non-baseline inspections which include inspections of your independent spent fuel storage installation and Millstone Unit 2 pressurizer replacement.

The enclosed inspection plan lists the inspections, less those related to physical protection, scheduled through March 31, 2007. The inspection plan is provided to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Paul G. Krohn, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49

Enclosure:

Millstone Units 2 and 3 Inspection/ Activity Plan

cc w/encl:

J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford R. Rubinstein, Waterford Library J. Markowicz, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.

R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)

S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Smith, President, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority Institute of Nuclear Power Operations

Distribution w/encl: VIA E-MAIL:

S. Collins, RA M. Dapas, DRA S. Lee, RI OEDO D. Roberts, NRR V. Nerses, NRR G. Wunder, NRR S. Schneider, Senior Resident Inspector E. Bartels, Resident OA P. Krohn, RI S. Barber, RI T. Madden, OCA D. Screnci, PAO A. R. Blough, DRS R. Crlenjak, DRS J. Rogge, DRS L. Doerflein, DRS R. Conte, DRS R. Lorson, DRS J. White, DRS C. ODaniell, DRP ROPreports@nrc.gov Region I Docket Room (with concurrences)

SISP Review Complete: PGK (Reviewers Initials)

DOCUMENT NAME: S:\ROP-6 Mid-Cycle Review\2005 Mid-Cycle Letters\Millstone ROP 6 Mid-Cycle Assessment Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure " N" = No copy OFFICE R1/DRP R1/DRP R1/DRP NAME SBarber/GSB MSchneider/GSB for PKrohn/PGK DATE 08/03/2005 08/09/2005 08/10/2005 OFFICIAL RECORD COPY

Page 1 of 2 Millstone 08/30/2005 10:34:48 Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111111B - L.O. REQUAL PARTIAL - FOCUS UNIT 3 2 2, 3 IP 7111111B Licensed Operator Requalification Program 08/29/2005 09/02/2005 Baseline Inspections 7111121 - SSDI - U3 6 3 IP 7111121 Safety System Design and Performance Capability 08/29/2005 09/02/2005 Baseline Inspections 3 IP 7111121 Safety System Design and Performance Capability 09/12/2005 09/16/2005 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/29/2005 09/02/2005 Baseline Inspections 71114 - EP PROGRAM INSP & PI VERIFICATION 1 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/12/2005 09/12/2005 Baseline Inspections 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 09/12/2005 09/12/2005 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 09/12/2005 09/12/2005 Baseline Inspections 2, 3 IP 7111402 Alert and Notification System Testing 09/12/2005 09/16/2005 Baseline Inspections 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 09/12/2005 09/16/2005 Baseline Inspections 7111108P - INSERVICE INSPECTION - U3 2 3 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 10/03/2005 10/07/2005 Safety Issues 3 IP 7111108P Inservice Inspection Activities - PWR 10/03/2005 10/07/2005 Baseline Inspections 3 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03-009) 10/17/2005 10/21/2005 Safety Issues 3 IP 7111108P Inservice Inspection Activities - PWR 10/17/2005 10/21/2005 Baseline Inspections 7112102 - OCC RDA SAFETY - ALARA 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 10/24/2005 10/28/2005 Baseline Inspections 3 IP 7112102 ALARA Planning and Controls 10/24/2005 10/28/2005 Baseline Inspections 7111111B - LO REQUAL PROG (FU HUM PER.+SIM ISSUES) 2 2, 3 IP 7111111B Licensed Operator Requalification Program 10/30/2005 11/03/2005 Baseline Inspections MODS - MODS & 50.59 UNITS 2/3 5 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 11/14/2005 11/18/2005 Baseline Inspections 2, 3 IP 7111117B Permanent Plant Modifications 11/14/2005 11/18/2005 Baseline Inspections 71152B - PI&R 6 2, 3 IP 71152B Identification and Resolution of Problems 02/13/2006 02/17/2006 Baseline Inspections 2, 3 IP 71152B Identification and Resolution of Problems 02/27/2006 03/03/2006 Baseline Inspections 7112101 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 02/13/2006 02/17/2006 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 2 IP 7112102 ALARA Planning and Controls 04/03/2006 04/07/2006 Baseline Inspections 7111121 - U2 SSD&PC 6 2, 3 IP 7111121 Safety System Design and Performance Capability 05/08/2006 05/12/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Millstone 08/30/2005 10:34:48 Inspection / Activity Plan Report 22 08/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 7111121 - U2 SSD&PC 6 2, 3 IP 7111121 Safety System Design and Performance Capability 05/22/2006 05/26/2006 Baseline Inspections 2, 3 IP 7111121 Safety System Design and Performance Capability 06/05/2006 06/09/2006 Baseline Inspections 2, 3 IP 7111121 Safety System Design and Performance Capability 06/12/2006 06/16/2006 Baseline Inspections 7111401 - EXERCISE EVALUATION & EP PI VERIFICATION 5 2, 3 IP 7111401 Exercise Evaluation 05/15/2006 05/19/2006 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 05/15/2006 05/19/2006 Baseline Inspections INSP - OPERATION OF AN ISFSI 1 2, 3 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/01/2006 07/30/2006 Other Routine 7111107B - HEAT SINK 1 2 IP 7111107B Heat Sink Performance 07/10/2006 07/14/2006 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 2, 3 IP 7112202 Radioactive Material Processing and Transportation 07/31/2006 08/04/2006 Baseline Inspections 7111111B - UNIT 2 L.O. REQUAL PROG.&PASS/FAIL RSLTS 2 2 IP 7111111B Licensed Operator Requalification Program 10/09/2006 10/13/2006 Baseline Inspections 50003 - PRESSURIZER REPLACEMENT 1 2 IP 50003 Pressurizer Replacement Inspection 10/10/2006 10/27/2006 Safety Issues 7111108P - INSERVICE INSPECTION - UNIT 2 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/23/2006 10/27/2006 Baseline Inspections 7112102 - OCC RDA SAFETY - ALARA 1 2, 3 IP 7112102 ALARA Planning and Controls 11/13/2006 11/17/2006 Baseline Inspections 7111112B - MAINTENANCE RULE 1 2, 3 IP 7111112B Maintenance Effectiveness 11/27/2006 12/01/2006 Baseline Inspections 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/11/2006 12/15/2006 Baseline Inspections 7111107 - HEAT SINK INSP 1 2, 3 IP 7111107B Heat Sink Performance 01/08/2007 01/12/2007 Baseline Inspections 3/12 EXM - U3 OPERATOR LICENSING INITIAL EXAMS 3 3 U01638 MILLSTONE 3 INITIAL EXAM (FY07) 02/12/2007 02/16/2007 Not Applicable 3 U01638 MILLSTONE 3 INITIAL EXAM (FY07) 03/12/2007 03/16/2007 Not Applicable 7112101 - OCC RAD SAFETY 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 02/12/2007 02/16/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.