TXX-6770, Advises of Rev to 870925 Date for Completion of Final Design Validation of Conduit Sleeve Identification,Committed to in 860814,870506 & 0522 Responses to Violation Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Date Revised to 880301

From kanterella
Revision as of 19:55, 8 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises of Rev to 870925 Date for Completion of Final Design Validation of Conduit Sleeve Identification,Committed to in 860814,870506 & 0522 Responses to Violation Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Date Revised to 880301
ML20235G384
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/23/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-6770, NUDOCS 8709300017
Download: ML20235G384 (1)


Text

_ - - - _ _ - - - -

M Log # TXX '70 USNRC10S -9 File # 101 IR 85-13 M81 SEP 28 A 9 5S -

C E IR 85-09 Ref H 10CFR2.201 nlELECTRIC September 23, 1987 William G. Counsil Emuthe We Prvsident U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/85-13 AND 50-446/85-09 REVISED DATE OF FULL COMPLIANCE ON NOTICE OF VIOLATION (N0V) ITEM D

REFERENCE:

1) TUGCo Letter TXX-4392 from W. G. Counsil to E. H. Johnson dated August 14, 1986
2) TV Electric Letter TXX-6424 from W. G. Counsil to NRC dated May 6, 1987
3) TU Electric Letter TXX-6465 from W. G. Counsil to NRC dated may 22, 1987 j Gentlemen:

The referenced letters provided our response to NOV 445/8513-V-01 (Item D).

Our response stated that final design validation of conduit sleeve l identification on Unit 1 and Common Systems would be completed by September 25, 1987. This final design validation has been incorporated into the Unit 1 Post-Construction Hardware Validation Program (PCHVP). The PCHVP is scheduled i for completion by March 1, 1988. Accordingly, our date for completion of the Unit 1 and common conduit sleeve identification final design validation is I hereby revised to be no later than March 1,1988. l l

Very truly yours,

[h U?sd&

W. G. Counsil By: /

G'. S. Keeley -

Manager, Nuclear Li nsing RSB:tgj c- Mr. R. D. Martin, Region IV Resident Inspectors (3)

OY i o 400 North Olive Street LB Si Dall.ss. Texas 75201

, . . . . . . , , 4