TXX-6770, Advises of Rev to 870925 Date for Completion of Final Design Validation of Conduit Sleeve Identification,Committed to in 860814,870506 & 0522 Responses to Violation Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Date Revised to 880301
| ML20235G384 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/23/1987 |
| From: | Counsil W, Keeley G TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| TXX-6770, NUDOCS 8709300017 | |
| Download: ML20235G384 (1) | |
Text
_ - - - _ _ - - -
M Log # TXX '70 USNRC10S
-9 File # 101 IR 85-13 M81 SEP 28 A 9 5S E
IR 85-09 C
Ref H 10CFR2.201 nlELECTRIC September 23, 1987 William G. Counsil Emuthe We Prvsident U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D. C. 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/85-13 AND 50-446/85-09 REVISED DATE OF FULL COMPLIANCE ON NOTICE OF VIOLATION (N0V) ITEM D
REFERENCE:
- 1) TUGCo Letter TXX-4392 from W. G. Counsil to E. H. Johnson dated August 14, 1986
- 2) TV Electric Letter TXX-6424 from W. G. Counsil to NRC dated May 6, 1987
Gentlemen:
The referenced letters provided our response to NOV 445/8513-V-01 (Item D).
Our response stated that final design validation of conduit sleeve l
identification on Unit 1 and Common Systems would be completed by September 25, 1987.
This final design validation has been incorporated into the Unit 1 Post-Construction Hardware Validation Program (PCHVP).
The PCHVP is scheduled i
for completion by March 1, 1988. Accordingly, our date for completion of the Unit 1 and common conduit sleeve identification final design validation is I
hereby revised to be no later than March 1,1988.
l l
Very truly yours,
[h U?sd&
W. G. Counsil By:
/
G'. S. Keeley Manager, Nuclear Li nsing RSB:tgj c-Mr. R. D. Martin, Region IV Resident Inspectors (3)