,_ - -

' V.

'f jy j

M lllllllL" M Log # TXX-90135 h

d File #-10110 1

907.3 TUELECTRIC.

April 10, 1990 Wmism J. Cahm, Jr.

[

Lurcunvr Vke hendern i

U..S Nuclear-Regulatory Commission

.. Document Control Desk d

1 Attn:

Washington, D, C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC' STATION (CPSES)

DOCKET NOS 50-445-AND.50-446, ASCO' SOLEN 0!DS FOR MAIN STEAM ISOLATION. VALVES-Gentlemen:

4 A meeting was held on March 5,1990,- at the NRC White Flint office among'

.f representatives of the NRC,and TV-Electric to discuss offsite power -

J availability for the: Automatic Switch-Company:(ASCO) solenoid. operated.. valve:

.(S0V)-for each Main Steam Isolation 4 Valve (MSIV) in'the' event of the non-T mechanistic Main Steam line crack' in the superpipe region. The latest report l.

related'to this issue, logged TXX-90013, was submitted February 7, 1989.'

The ASCO SOV is located in the air supply to,the hydraulic-pump for-the MSIV actuator and is energized to close:to prevent the: continued pumping off hydrculic fluid to the MSIV's actuator..TU Electric clarifiedlit's position, consistent with FSAR' 0&R 10.20'and 140'1 - that each ASCO S0Y is energized from Non-1E available offsite power during this event.

Further,'should'offsite power not be available, the ASCO SOV's can be energized to close from Non-1E-l.

batteries.

In' response to this position, the NRC. requested that TU' Electric-L provide additional assurances that if-offsite powerfwere to become L:

unavailable, provisions are made to restore power torthe appropriate battery

-i l'

charger for the. subject ASCO S0V's earlysin the recovery, process.

The NRC-requested a submittal with a commitment to.-incorporate the necessary guidance L

into 'the appropriate Emergency. 0perating Procedure'.(EOP). The NRC also L

requested that the-submittal contain information concerning the required steps to restore power to the subject battery charger, if.offsitel power were to l

become unavailable.

l-The attachment provides the information required to' address the NRC questions.

Sincerely, i

/

i William J. Cahill,yJr..

HAM /vid

,[

Attachment.

c - Mr.

R.,D.

Martin, Region IV

'O Resident Inspectors, CPSES (3)

-9 OA190288 9004'10-O

~

jDR : ADOCK.0500gj5 m

m sw u H m' Texas 7520t c

.L 1

N; 5

4' ha

P U.

- u -- -

2 l5 m

e m

A 1

4

^

O.

4 Attachment to TXX-90135 Page 1 of 1 Restoration of Power to the ASCO SOV Battery Charcer Guidance willHbe provided;in the appropriate E0P to assure restoration of power to the appropriate:Non 1E battery' charger, fer the batteries which power the ASCO'SOV's, early in the recovery process, if required.

Restorati on' of' power will provide additional. assurances that, if-offsite power is lost.1 and-the Main Steam"line break is inside the Main Steam pipe penetration areas-outside containment, the HSIV's,will remain closed.f_The operator _will be instructed-to restore power to-the batteries that supply power-to the ASCO l

- S0V's.

The required: change to' the subject Unit l' E0P is scheduled to'be' completed by April.16, 1990, Incorporation of'the above-guidance into the Unit 2 E0P will be determined when Unit 2 activities resume, 1

i Y

[