TXX-6465, Advises of Delays in Field Verification Activities for Identification of Raceway Sleeves,Per Util 870506 Response to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Verification Will Be Completed by 870626

From kanterella
(Redirected from TXX-6465)
Jump to navigation Jump to search
Advises of Delays in Field Verification Activities for Identification of Raceway Sleeves,Per Util 870506 Response to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Verification Will Be Completed by 870626
ML20214J584
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/22/1987
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-6465, NUDOCS 8705280116
Download: ML20214J584 (1)


Text

. _ . _ _ _ _ _ _ _ _ . _ _ _ . _ _ - . . . - _ _ _ _ _ _ _ - - _

J. _

E Log # TXX-6465

' File # 10130 l 1-n d

IR 85-13 IR 85-09

=

i-Ref: 10CFR50.55(e)

May 22, 1987 1

. U. S.' Nuclear Regulatory Commission i

ATTN: Document Control Desk j Washington, D.C. 20555 i SU8 JECT: COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 INSPECTION REPORT NOS. 50-445/85-13 AND 50-446/85-09

^

REVISED DATE OF FULL COMPLIANCE ON NOTICE OF VIOLATION (NOV) ITEM D

REFERENCE:

1) TUGC0 Letter TXX-4932 from W. G. Counsil' to E. H. Johnson dated August 14, 1986.
2) TU Electric Letter TXX-6424 from W. G. Counsil to NRC dated May 6, 1987.

i Gentlemen:

In cur response (Reference 2) to NOV 445/8513-V-01 (Item D), we stated that the I

field verification activities for the identification of electrical and raceway i sleeves for Unit 1 and Common installations were scheduled to be completed by May 4

22, 1987. As a result of delays in these activities, we will be unable to complete our field verification by this date. We anticipate completion of our field verification activities for Unit I and Common installations by June 26, 1987. The remaining dates when full compliance will be achieved stated in Reference 2 for the Unit 1 and Common final design verification and for all Unit' 2 l

activities remain unchanged.

3 Very truly yours,

, aim W. G. Counsil i

RSB/mlh

. c - Mr. R. D. Martin, Region IV l CPSES Resident Inspector - 3 copies B705280116'870526) g PDR ADOCK 05000445

)

G PDR