Responds to Re Spent Fuel Survey Commitments for Waterford Steam Electric Station,Unit 3
ML20116E584
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/01/1996
From: James Fisicaro
ENTERGY OPERATIONS, INC.
To: Chandu Patel
NRC (Affiliation Not Assigned)
References
TAC-M88094, W3F1-96-0121, W3F1-96-121, NUDOCS 9608060047
Download: ML20116E584 (2)


Text

.

nti gy Operations,Inc.

] Killona. LA 70066 Tel 504 739 6242 James J. Fisicaro O";h*

l l

W3F1-96-0121 A4.05 PR August 1,1996 U.S. Nuclear Regulatory Commission ATTN: Mr. Chandu P. Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects lil/IV Office of NRR Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Spent Fuel Survey Commitments For Waterford Steam Electric Station, i

Unit 3 (TAC NO. M88094)

Dear Mr. Patel:

This letter is in response to your letter dated June 27,1996 on the above subject.

Your letter requested that Waterford 3 provide, within 30 days of receipt, written confirmation of a commitment to revise the appropriate administrative procedures for consistency with the recently revised UFSAR Section 9.1.3.1 (Fuel Pool System).

} The revised UFSAR section was included in the latest Waterford 3 periodic UFSAR

submittal (W3F1-96-0067 dated May 6,1996).
Waterford 3 commits to revise procedure RF-005-001 to address the identified concerns prior to Refuel 8, which is currently scheduled to begin in April of 1997.

i Information is being added to RF-005-001 as prerequisites, precautions, limitations, or initial conditions, as appropriate associated with fuel movement in the Spent Fuel l Pool. Specific guidelines will be provided in the procedure.

9 0\

0500'7G 388* 188M os888 sea P PDR ]

s I Spent Fuel Survey Commitments For Waterford Steam Electric Station, Unit 3 (TAC NO. M88094)

W3F1-96-0121 Page 2 l August 1,1996 Appropriate references will be identified in the procedure (FSAR Section 9.1.3/ Figures 9.1-21 and 9.1-22). An engineering analysis has been conducted to bound typical fuel reloads, including a full core offload. Procedure RF-005-001 will i require that, if conditions occur that are outside of procedure guidelines, an additional engineering analysis will be performed prior to moving fuel to the Spent Fuel Pool.

if you should have any questions concerning the above, please contact me at i (504) 739-6242 or Tim Gaudet at (504) 739-6666.

Very truly yours, I

J -

< 1 l

53r ,

J.J. Fisicaro  !

Director Nuclear Safety l JJF/ OPP /ssf cc: L.J. Callan, NRC Region IV l R.B. McGehee N.S. Reynolds NRC, Document Control Desk NRC Resident inspectors Office 4