Responds to NRC Re Deviation Noted in Insp Repts 50-338/84-39 & 50-339/84-39.Corrective Actions:Requirement for Shift Technical Advisor Mgt Training Included in Formal Generic Class Schedule
ML20127E435
Person / Time
Site: North Anna, 05000000
Issue date: 03/21/1985
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20127E402 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.1, TASK-TM 85-140, NUDOCS 8505200076
Download: ML20127E435 (2)


Text

-

m l Wkluul \rras vr Nw la ur , qe vittn om ikftartrwrit Yu e !%sutent itet r *t'n e Ika 3xsi>

_m x.a .,, - . ...._n,,,,,,.~

sui,na, rut ti va rua J u,,1 S_ _

eM

_M S r 26March All :21, 211985 ' 5 3 g

-EEEii ViftGINIA POWEft Q m

M Dr. J. Nelson Grace Serial No.: 85-140 g Regional Administrator N0/BLS:act w Region II Docket Nos: 50-338 -M U. S. Nuclear Regulatory Commission 50-339 101 Marietta Street, Suite 2900 License Nos: NPF-4 M Atlanta, Georgia 30323 NPF-7 7j

Dear Dr. Grace:

M 6

6 We have reviewed your letter of February 20, 1985, in reference to the -

inspection conducted at Surry and North Anna Power Stations from November 5 through November 28, 1984 and reported in IE inspection report 50-280/84-31, 50 d1/84-31, 50-338/84-39 and 50-339/84-39 Our response to the deviation is g addressed individually on the attachment. g w

We have determined that no proprietary information is contained in the M report. Accordingly, Virginia Power has no obiection to this inspection M report being made a matter of public disclosure. The information contained in 7 the attached pages is true and accurate to the best of my knowledge and 6 belief. N

- Very truly yours, m a

l M

m a

% [. Js 73 %4 g W. L. Stewart N

Attachment -s M

cc: Mr. Richard C. Lewis, Director Division of Project and Resident Programs M Mr. James R. Miller, Chief Operating Reactors Branch No. 3 7 Division of Licensing E N

Mr. M. W. Branch m

NRC Resident Inspector Q

__ --g North Anna Power Station Mr. D. J. Burke NRC Resident inspactor .y Surry Power Station __

m m

M 6 OSO40 N eSOS2 CgOS00h33g DR

- =ji PDR G E A

. a j, . r' e

RESPONSE TO NOTICE OF DEVIATION ITEM REPORTED DURING NRC INSPECTION

. CONDUCTED FROM NOVEMBER S TO NOVEMBER 28, 1984 REPORT NOS. 50-338/84-39 AND 50-339/84-39

. NRC Comment l '. ~ In - a : June '18, - 1981 '-letter to . the NRC responding to NUREG 0737, Item I. A.1.1, . Shif t ' Technical - Advisor, the . licensee . committed to provide 24 -

contact ' hours' ' of . management skills training to candidates for Shift Technical Advisors.

Contrary to the above, .the 1984 Shif t Technical Advisor's class did not

, receive instruction in the area of management skills.

- Response II. Description of Corrective Actions A three day management skills training course was conducted January 23

-through January 25,:1985 for the three STA's from the 1984 class who had' not received this training.. .

~

.2. Actions Taken to Avoid Further Deviations The requirement _ for STA' Management Training has been included in the Lformal . generic- STA class schedule' to prevent recurrence of- this

, deviation.

~

3. Dates When These Actions Were or Will Be Completed As stated above.