ML20127E435
| ML20127E435 | |
| Person / Time | |
|---|---|
| Site: | North Anna, 05000000 |
| Issue date: | 03/21/1985 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20127E402 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.1, TASK-TM 85-140, NUDOCS 8505200076 | |
| Download: ML20127E435 (2) | |
Text
l m--
Wkluul \\rras vr Nw la ur, qe vittn om ikftartrwrit Yu e !%sutent itet r *t'n e Ika 3xsi>
x.a.,, -.
...._n,,,,,,.~
_m sui,na, rut ti va rua J u,,1 S_
eM
_M 5
S r 26 All : 21 March 21, 1985 3
g
-EEEii ViftGINIA POWEft Q
m M
Dr.
J. Nelson Grace Serial No.: 85-140 g
Regional Administrator N0/BLS:act w
Docket Nos: 50-338
-M Region II U. S. Nuclear Regulatory Commission 50-339 101 Marietta Street, Suite 2900 License Nos: NPF-4 M
Atlanta, Georgia 30323 NPF-7 7j M
Dear Dr. Grace:
66 We have reviewed your letter of February 20, 1985, in reference to the inspection conducted at Surry and North Anna Power Stations from November 5 through November 28, 1984 and reported in IE inspection report 50-280/84-31, 50 d1/84-31, 50-338/84-39 and 50-339/84-39 Our response to the deviation is g
addressed individually on the attachment.
gw We have determined that no proprietary information is contained in the M
report.
Accordingly, Virginia Power has no obiection to this inspection M7 report being made a matter of public disclosure. The information contained in the attached pages is true and accurate to the best of my knowledge and 6
belief.
N Very truly yours, a
m l
Mm a
[. J 73 %4 s
g W.
L.
Stewart N-s Attachment M
cc:
Mr. Richard C. Lewis, Director Division of Project and Resident Programs M
Mr. James R.
Miller, Chief Operating Reactors Branch No. 3 7E Division of Licensing N
-m Mr. M.
W. Branch Q
NRC Resident Inspector North Anna Power Station
__ g Mr. D. J.
Burke NRC Resident inspactor
.y m
Surry Power Station mM OSO40 eSOS2 CgOS00h33g 6
N DR PDR
- =ji E
G A
ar' j,.
e RESPONSE TO NOTICE OF DEVIATION ITEM REPORTED DURING NRC INSPECTION
. CONDUCTED FROM NOVEMBER S TO NOVEMBER 28, 1984 REPORT NOS. 50-338/84-39 AND 50-339/84-39
. NRC Comment l '.
~ In - a : June '18, - 1981 '-letter to. the NRC responding to NUREG 0737, Item I. A.1.1,. Shif t ' Technical - Advisor, the. licensee. committed to provide 24 -
contact ' hours' ' of. management skills training to candidates for Shift Technical Advisors.
Contrary to the above,.the 1984 Shif t Technical Advisor's class did not
, receive instruction in the area of management skills.
- Response II.
Description of Corrective Actions A three day management skills training course was conducted January 23
-through January 25,:1985 for the three STA's from the 1984 class who had' not received this training..
~
.2.
Actions Taken to Avoid Further Deviations The requirement _ for STA' Management Training has been included in the Lformal. generic-STA class schedule' to prevent recurrence of-this
, deviation.
~
3.
Dates When These Actions Were or Will Be Completed As stated above.
s-h s
-~
s-.
o a
-.