ML20133A494

From kanterella
Revision as of 04:31, 10 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Responds to That Withdrew Amend Request for Mod of Facility TS Pertaining to Certain Control Rod Scram Insertion Time Testing Limits.Notice of Withdrawal of Application for Amend W/Ofc of Fr for Publication Encl
ML20133A494
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 12/24/1996
From: Kelly G
NRC (Affiliation Not Assigned)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20133A497 List:
References
TAC-M94584, NUDOCS 9612310144
Download: ML20133A494 (3)


Text

-, , . .

  • ~

'.- December 24,19s6 Distribution w/encls:

Docket File 0GC .

PUBLIC JCaldwell, RIII l PD3-3 r/f- GMarcus 1 ACRS JRoe ,

Mr. Lee Liu l

. Chairman of the Board, President, ,

and Chief Executive Officer  :

IES Utilities Inc. 1 200 First Street, SE  !

Cedar Rapids, IA 52406-0351

SUBJECT:

DUANE ARN0LD ENERGY CENTER - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. M94584)

Dear Mr. Liu:

By letter dated January 30, 1996, you applied for an amendment to the Duane i Arnold Energy Center Operating License No. 50-331. The proposed change would 1 have modified the facility technical specifications pertaining to certain control rod scram insertion time testing limits. Subsequently, by letter dated February.26, 1996, you withdrew the amendment request.

1 The Commission has filed the enclosed Notice of Withdrawal of Application for i Amendment to Facility Operating License with the Office of the Federal Register for. publication.

Sincerely, Original signed by:

Glenn B. Kelly, Sr. Project Manager Project Directorate III-3 Division of Reactor Projects III/IV ,

Office of Nuclear Reactor Regulation  !

l Docket No. 50-331 ,  !

Enclosure:

Notice of Withdrawal i

cc w/ encl: See next page ,

DOCUMENT NAME:G:\DUANEARN\DUA94584.WIL To receive a copy of this document, indicate in the box: "C" = Copy without enclo res *E" = Copy with enclosures "N" = No copy e 6 0FFICE PD33:LA: l6 PD33:PM j.6 Osc #

NAME DFoster-Curteen GKelly W /f M DATE 12/)l/96 - & L '

12/.n/96 1 g /96 N b._ l I 0FFICIAL RECORD COPY i

310054 nA2 aan na88: 21 P PDR NBC HLE CENER C8PY

December 24, 1996

. Distribution w/encls: I 2

Docket File OGC PUBLIC JCaldwell, RIII l PD3-3 r/f GMarcus ACRS JRoe Mr. Lee Liu I

Chairman of the Board, President, and Chief Executive Officer IES Utilities Inc.

l 200 First Street, SE Cedar Rapids, IA 52406-0351

SUBJECT:

DUANE ARNOLD ENERGY CENTER - WITHDRAWAL OF AN AMENDMENT REQUEST e

(TAC NO. M94584)

Dear Mr. Liu:

By letter dated January 30, 1996, you applied for an amendment to the Duane Arnold Energy Center Operating License No. 50-331. The proposed change would have modified the facility technical specifications pertaining to certain l

control rod scram insertion time testing limits. Subsequently, by letter l dated February 26, 1996, you withdrew the amendment request. I The Commission has filed the enclosed Notice of Withdrawal of Application for l Amendment to Facility Operating License with the Office of the Federal i Register for publication. l Sincerely, i

Original signed by:

Glenn B. Kelly, Sr. Project Manager Project Directorate III-3 i

, Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Socket No. 50-331

Enclosure:

Notice of Withdrawal cc w/ encl: See next page j DOCUMENT NAME:G:\DUANEARN\DUA94584.WIL To receive a copy of this document, indicate in the box: 'C" = Copy without enclosures *E" = Copy with enclosures

  • M" = No copy 0FFICE PD33:LA 6 PD33:PM l e' 0Q; f NAME DFoster-Curteen GKelly){yM M
DATE 12/Ji/96 && '

12/.n/96 1)( /96 N_

0FFICIAL RECORD COPY

Mr. Lee Liu Duane Arnold Energy Center IES Utilities Inc.

cc:

Jack Newman, Esquire Kathleen H. Shea, Esquire Morgan, Lewis, & Bockius 1800 M Street, NW. ,

Washington, DC 20036-5869 Chairman, Linn County Board of Supervisors Cedar Rapids, Iowa 52406 l IES Utilities Inc.

ATTN: Gary Van Middlesworth Plant Superintendent, Nuclear 3277 DAEC Road Palo, Iowa 52324 Mr. John F. Franz, Jr.

. Vice President, Nuclear Duane Arnold Energy Center 3277 DAEC Road Palo, Iowa 52324 4

. Mr. Ken Peveler Manager, Nuclear Licensing

Duane Arnold Energy Center

! 3277 DAEC Road Palo, Iowa 52324 d

U. S. Nuclear Regulatory Commission i Resident Inspector's Office ,

Rural Route #1 l Palo, Iowa 52324 l Regional Administrator, RIII 1 U. S. Nuclear Regulatory Commission i 801 Warrenville Road l Lisle, Illinois 60532-4531  !

Ms. Parween Baig Utilities Division Iowa Department of Commerce Lucas Office Building, 5th floor Des Moines, Iowa 50319 i