|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene ML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl CY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests 1999-09-30
[Table view] Category:NRC TO U.S. CONGRESS
MONTHYEARML20248F0321989-09-14014 September 1989 Forwards Rept of AOs at Licensed Facilities for First Calendar Quarter 1989.Plug Failure Resulted in Steam Generator Tube Leak at North Anna Unit 1 & Steam Generator Ruptured at McGuire Unit 1.W/o Encl ML20247L2401989-09-13013 September 1989 Responds to Re K Barnes Concerns Regarding Safety at Plants.Advises That to Date,Releases from Plants Remain Well within Accepted Stds ML20246K8571989-08-25025 August 1989 Discusses NRC Actions in Reponse to Constituent Concerns Re Excessive Overtime Worked by Employees of Plants ML20246B6591989-08-18018 August 1989 Forwards 40th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants from Apr-June 1989. Lilco Shareholders Voted to Accept Terms That Provide for Sale of Plant to State of Ny ML20246E0531989-06-30030 June 1989 Responds to Re Constituent GL Johnson Safety Concerns Expressed in 890515-17 Ltrs to Lw Zech.Nrc Takes Nuclear Safety Very Seriously & Will Bring Technical & Investigative Resources to Bear in Resolving Concerns ML20247C0111989-05-12012 May 1989 Forwards NRC Quarterly Status Rept to Congress Covering First Quarter 1989.On 890303,NRC Dismissed Shoreham Intervenors from Licensing Proceeding for Misconduct During Proceeding.W/O Encl ML20247C3541989-03-17017 March 1989 Forwards Detailed Info Re Status of Implementation of TMI Action Plan Items at Listed Plants.Small Number of Action Items Still Need Resolution ML20236D4761989-03-0909 March 1989 Forwards NRC 38th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1988 ML20195G8521988-11-10010 November 1988 Forwards Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Jul-Sept 1988.Inability of Commission to Forecast Licensing Schedule for Shoreham & Seabrook Noted ML20245D6531988-09-14014 September 1988 Responds to Re Requested Response to Concerns of H Nickerson Long Work Hrs for Personnel at Various Central Illinois Nuclear Generating Plants.Related Info Encl ML20245D5811988-08-22022 August 1988 Forwards 36th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants Covering Apr-June 1988.Licensing Schedule Cannot Be Realistically Forecast Due to Unresolved Emergency Preparedness Issues ML20207G2211988-08-15015 August 1988 Responds to Requesting Response to P Birnie Re Event at LaSalle Involving Recirculation Pump. NRC Response to P Birnie Identical to Ltr Addressed to Recipient ML20195G6681988-06-10010 June 1988 Provides Info in Response to Rl Spaulding Re Problems Associated W/Full Power Operation Authorization & Plant Shutdown.Plants Must Demonstrate Satisfactory Solutions to Issues Before Restart or Full Power Operation ML20155A1581988-06-0101 June 1988 Ack Receipt of Re Hj Lloyd Concerns About Odor from Plant.Lloyd Has Been Advised That Radiation Releases from Nuclear Power Plants Do Not Cause Smells & Review Did Not Identify Source of Odor ML20154S0881988-06-0101 June 1988 Responds to Re Concerns of Hj Lloyd.Nrc Review of Subj Concerns Concluded That Described Odor Not Attributable to Subj Plant.Ltr Addressing Hj Lloyd Concerns Encl ML20151D3921988-04-0606 April 1988 Provides Listed Info Requested in Re Operating Nuclear Power Units Located at Twelve Sites Along Great Lakes ML20148E0961988-02-29029 February 1988 Forwards Quarterly Rept Covering Fourth Quarter of 1987,in Response to House Rept 97-850 ML20196G9691988-02-29029 February 1988 Forwards 34th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1987. Commission Unable to Forecast Licensing Schedule for Shoreham & Seabrook Because of Unresolved Issues ML20195J6611988-01-20020 January 1988 Responds to Concerns Raised in Re Stainless Steel Matl Designated as E-Brite 26-1.Actions Taken to Address Allegation That E-Brite 26-1 Unsuitable for Use in Nuclear Power Plants Listed ML20236K8761987-11-0303 November 1987 Responds to Sztaba Expressing Concerns Re Safe Operation of State of CT Nuclear Power Plants.Plants in State Not Rated Among Most Troublesome in Nation.Licensee Performance Monitored in Publicly Available SALP Repts ML20236G1831987-10-27027 October 1987 Responds to Re Proposed Rule 10CFR50 & Congressional Ltrs Received on Morning of 871022 Meeting. Commission Stands Behind Declaring Process for Proposed Rule Open ML20235J1171987-09-28028 September 1987 Responds to Requesting Info Re Ucs 870210 Petition Requesting Mods to B&W Facilities,Per E Gallizzi to Recipient Requesting Support of Petition. Gallizzi Statements Discussed.Petition Under Review ML20235J5351987-09-28028 September 1987 Responds to Constituent Tf Gross Ltr Supporting Ucs 870210 10CFR2.206 Petition to Suspend OLs & CPs of Any Util Operating or Bldg Nuclear Power Reactors Designed by B&W,Per 870803 Request.Nrc Statements Re Plants Discussed ML20236L1811987-08-0404 August 1987 Responds to Addressed to Chairman Zech,Requesting That Commission Keep Recipient Fully Apprised of All Developments Re Both Petition Filed by Ucs & Ongoing Reassessment of B&W Reactors.Review of Petition Continuing ML20215K5981987-06-10010 June 1987 Responds to 870508 Request for Testimony at 870514 Hearing on External Influence on NRC Adjudicatory Procedures in Shoreham Proceeding.Index of Pertinent Documents Encl ML20215H9431987-06-0505 June 1987 Advises That Review of B&W Designed Nuclear Power Plants Will Not Satisfactorily Address Safety Issues Associated W/ B&W Design.Supports Efforts to Create Independent Safety Review Board ML20214J5261987-05-15015 May 1987 Responds to Recipient Expressing Support for NRC Shut Down of Peach Bottom Atomic Power Station & Concern Re Emergency Planning Issues at Seabrook.Commission Unable to Comment on Issues Before Commission or Adjudicatory Boards ML20214P8401987-05-15015 May 1987 Responds to Rj Mrazek Re Util Request to Operate Facility at 25% Power.Commission Will Not Make Decision on Merits of Request Until All Parties Have Opportunity to Have Views Considered ML20207A2061987-04-17017 April 1987 Responds to Request for Rept Re Legal & Institutional Aspects Under NRC Jurisdiction on Possible Conversion of Unit 1 to Defense Matls Production Reactor.Cp Still in Effect.Util Plans to Mothball Reactor by June 1988 ML20210N2161986-09-25025 September 1986 Discusses Governor Celeste Opposing Full Power Operations of Plants.Order Bars Commission from Voting Until Further Order by Us Court of Appeals.Served on 860930 NUREG-0396, Forwards Chronology of Meetings & Discussions W/Util & Other Groups,Internal Meetings & Lists of Public & Internal Documents,Per 860828 Request for Info Re Reducing Emergency Planning Zones for Seabrook & Calvert Cliffs1986-09-10010 September 1986 Forwards Chronology of Meetings & Discussions W/Util & Other Groups,Internal Meetings & Lists of Public & Internal Documents,Per 860828 Request for Info Re Reducing Emergency Planning Zones for Seabrook & Calvert Cliffs ML20209E6291986-08-26026 August 1986 Responds to 860731 Request to Be Kept Informed of Proceedings Re Facilities NUREG-1068, Responds to Constituent Inquiry Re Nuclear Reactor Containment Sys Designed by G.E.Probability of Severe Reactor Accidents Quite Low.Third Party Liability Insurance Provided Under Price-Anderson Legislation.W/O Stated Encls1986-08-26026 August 1986 Responds to Constituent Inquiry Re Nuclear Reactor Containment Sys Designed by G.E.Probability of Severe Reactor Accidents Quite Low.Third Party Liability Insurance Provided Under Price-Anderson Legislation.W/O Stated Encls ML20206Q1321986-08-20020 August 1986 Submits Interim Response to Re Alleged Falsification of Welding Certificates for Welders at Plants Employed by Powerplant Specialists,Inc ML20204F9361986-07-30030 July 1986 Responds to from R Blank,Addressing Concerns Re Safety of Older Nuclear Plants,Per SO Conte 860701 Request ML20215L2051986-06-16016 June 1986 Responds to to NRC Requesting That FEMA Conduct Public Meeting Re FEMA Assessment of 861213 Emergency Planning Exercise.Commission Addressed Similar Response in 860606 Memorandum & Order ML20211B7121986-05-28028 May 1986 Forwards Temporary Exemption Issued to Util & SER Re Recently Identified single-failure Vulnerability at Plant,In Response to .Encl Provides NRC Justification Why Plant Operation Will Not Present Undue Risk to Public NUREG-1195, Forwards Response to Re NRC Reexam of B&W Reactor Design.Review Efforts Intensified After TMI Accident.Nrr Reorganized Last Yr to Increase Attention to Major Vendor Product Lines.Action Plan Under Development for Rancho Seco1986-04-23023 April 1986 Forwards Response to Re NRC Reexam of B&W Reactor Design.Review Efforts Intensified After TMI Accident.Nrr Reorganized Last Yr to Increase Attention to Major Vendor Product Lines.Action Plan Under Development for Rancho Seco NUREG-0560, Forwards NRC Response to Congressman Matsui Re Broader Issues Related to B&W Design.Efforts to Enhance Response & Review of Events Underway.Plans to Reexam B&W Design in Progress1986-04-23023 April 1986 Forwards NRC Response to Congressman Matsui Re Broader Issues Related to B&W Design.Efforts to Enhance Response & Review of Events Underway.Plans to Reexam B&W Design in Progress ML20137P5121986-01-24024 January 1986 Provides Info Concerning Financial Qualifications of Utils Re Safety of Plants.Nrc Regulation of Commercial Nuclear Power Based on Responsibility of Licensees for Safe Operation.Addl Views of Asselstine Encl ML20132G6251985-09-19019 September 1985 Forwards Responses to Gao Rept, NRC Should Rept on Progress in Implementing Lessons Learned from TMI Accident ML20140H5551985-08-13013 August 1985 Forwards Press Release 85-108 Re Proposed Fine Concerning Util Alleged Violation of NRC Requirements Which Prohibit Discrimination Against Employee for Identifying Safety Concerns to Mgt ML20140H5741985-08-12012 August 1985 Forwards Press Release 85-106 Re Proposed Fine for Util Alleged Violation of NRC Requirements Concerning Employee Discrimination in Cleanup Program ML20140H5911985-07-23023 July 1985 Forwards Press Release 85-99 Re NRC Proposed Civil Penalty in Amount of $150,000 Against Util for Violation of Requirements Concerning Reactor Vessel Water Level Instruments ML20132B8341985-07-18018 July 1985 Forwards Quarterly Status Rept for Second Quarter CY85. Licensing Delay for Limerick 1 Projected to Be 5 Months. Delay Cannot Be Quantified for Shoreham Due to Litigation. Full Power OL Issued for Palo Verde 1 on 850601 IR 05000409/20050311985-07-16016 July 1985 Forwards Notice of Violation Issued to Util Based on 850409-0531 Insp ML20140H6231985-07-15015 July 1985 Forwards Press Release 85-95 Re NRC Proposed Fine Against Util for Alleged Violations of Safety Requirements During Apr 1985 ML20141H1081985-07-0909 July 1985 Forwards Responses to 850610 Questions Re Diablo Canyon OL Proceeding.Responses Delayed Due to Press of Other Business ML20140H6461985-06-0404 June 1985 Forwards Press Release 85-80 Re NRC Proposed Civil Penalty in Amount of $500,000 Aginst Util for Alleged Matl False Statements Made to NRC Concerning Operator Qualifications & Training ML20140H6701985-06-0303 June 1985 Forwards Press Release 85-78 Re NRC Proposed Fine Against Util for Alleged Violations of Requirements Concerning Unplanned Occupational Radiation Exposures & Failure to Control Contractor Work Forces 1989-09-14
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20211K5171999-09-0202 September 1999 Expresses Appreciation for Support Provided for NRC Public Meeting on 990825 ML20211H0741999-08-30030 August 1999 Discusses GL 92-01,Rev 1, Rv Structural Integrity, Issued by NRC on 950519 & NNECO Responses for Millstone Unit 2 & 980715.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 Based on Response Review ML20211H9971999-08-27027 August 1999 Forwards Insp Rept 50-423/99-07 on 990614-0715.Violations of NRC Requirements Occurred Re Adequacy of C/As for Organizational Changes & Being Treated as NCVs DD-99-09, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-09) Expired.Commission Declined Any Review & Decision Became Final on 990823.With Certificate of Svc.Served on 9908261999-08-26026 August 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-09) Expired.Commission Declined Any Review & Decision Became Final on 990823.With Certificate of Svc.Served on 990826 ML20211F5841999-08-23023 August 1999 Discusses Proposed Rev 21 to Northeast Utils Quality Assurance Program TR for NRC Review & Approval,Iaw 10CFR50.54 ML20211D5701999-08-20020 August 1999 Informs That in May 1999,Northeast Nuclear Energy Co, Restarted Millstone Nuclear Power Station,Unit 2.Licensee Has Been Tasked Charter with Listed Specific Responsibilities ML20211E8051999-08-20020 August 1999 Forwards Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted.Completion of Corrective Actions for Spent Fuel Bldg Ventilation Issues Adequate ML20211C4621999-08-18018 August 1999 Discusses Rev to TS Bases Sections 3/4.5.2 & 3/4.5.3, Emergency Core Cooling Sys Subsystems ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210N4921999-08-0909 August 1999 Ack Receipt of 990331 Electronic Transfer of $88,000 for Civil Penalty,Proposed on 990309.Corrective Actions Will Be Examined During Future Insp ML20210J6021999-08-0202 August 1999 Informs That Info Re Orise Technical Survey Assistance to NRC at CT Yankee Is to Include Copies of Listed Documents ML20210C0751999-07-21021 July 1999 Forwards 990721 Notice of Public Meeting Re post-shutdown Decommissioning Activities Rept ML20210A9681999-07-14014 July 1999 Responds to Re Changes to Millstone Physical Security Plan Identified as Rev 32,submitted Per Provisions of 10CFR50.54(p).No NRC Approval Is Required,Based on Util Determination That Revs Do Not Decrease Plan Effectiveness ML20209E7341999-07-12012 July 1999 Discusses Util Responses to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. Responses Acceptable.Info Revised in Reactor Vessel Integrity Database (Rvid) & Is Releasing as Rvid Version 2 ML20209G2921999-07-0909 July 1999 Forwards Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy DD-96-23, Informs That on 961226,NRC Issued Partial Director'S Decision DD-96-23,in Response to Petition Submitted,Per 10CFR2.206,on 9508211999-07-0101 July 1999 Informs That on 961226,NRC Issued Partial Director'S Decision DD-96-23,in Response to Petition Submitted,Per 10CFR2.206,on 950821 ML20210C1491999-07-0101 July 1999 Responds to ,Which Responded to NRC Ltr & NOV & Informs That Engagement in Any Similar Wrongdoing in Future May Result in More Significant Enforcement Action. No Further Action Will Be Taken at This Time ML20196J5031999-06-30030 June 1999 Responds to 990414 Petition,Submitted Per 10CFR2.206 to Nrc. NRC Solicited Support from FEMA to Ensure That Appropriate Response to Enhancements Identified to Offsite EP in Event of Radiological Emergency at Millstone,Developed ML20196J2111999-06-30030 June 1999 Forwards SE Concluding Licensee USI A-46 Implementation Program Meets Purpose & Intent of Criteria in Generic Implementation Procedure for Seismic Verification of NPP Equipment, Rev 2 ML20196J1131999-06-29029 June 1999 Forwards Notice of Receipt & Availability for Comment of Post-Shutdown Decommissioning Activities Rept, Re .Notice Provided for Public Comments to Be Submitted within 30 Days of Notice Date ML20196G9531999-06-24024 June 1999 Discusses Changes Provided by NNECO on 990504 to TS Bases Sections 3/4.7.7 & 3/4.7.8.Returns TS Bases to NNECO to Be Inserted in TS to Ensure That NRC Staff & NNECO Have Identical TS Bases Pages ML20212H9661999-06-21021 June 1999 Confirms 990611 & 14 Telcons with M Selden,In Which Beckman & Assocs,Inc Was Advised to Stop Work Under Mod 4 to Task Order 005,under Contract NRC-03-98-021 ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco ML20195J3121999-06-15015 June 1999 Expresses Concern Re M Casey 990523 Column, Gaffes Turn Into Cash at NRC, & Disagrees with New London Day Earlier Editorial Criticism of NRC Investigations of Harassment & Intimidation of Employees at Millstone NPPs 1999-09-30
[Table view] |
Text
, ._ _ _ _ _ _ _ _ _ - - _
.j -
4
^ f NOV 3 27-
<The Honorable ~ Christopher J. Dodd United: States Senate M, , ' Washington, DC:'P0510 d 'd/[ '
- 6
Dear Senator Dodd:
By:1etter" dated September 10,'1987, Mr. Stan Sztaba expressed his concern to you
!about the safe; operation' of Connecticut's nuclear power plants. This concern
?was raised by the. enclosed article that' appearen .in the Stamford Advocate on
. September.9,1087,:which stated that "Two Connecticut nuclear power plants zranked amon9fthe 15 most troublesome in the. nation in 1986...." The article's !
conclusion was. based on the number of Licensee. Event Reports (LEPs) submitted
' Lto the Nuclear' Regulatory Commission (NRC) in 1986 (57 for Millstone 3 and.48 j
~ Lfor Haddam Necki and the eight forced power reductions at Haddam Neck.in 1986.
The NRC does'not rate.any'of the Connecticut nuclear power plants among the
' most troublesome in -the nation. The number of LERs filed for Millstone 3 and Haddam Neck in 1986 are indicative of the need for improvement; however, the LEDs themselves do not- indicate' unsafe operation.
, <The NPC'is continually monitoring the licensee's performance in the operation Lof fits plants through its inspection and licensing programs. The results of this assessmentLare issued periodically as the " Systematic Assessment of
- Licensee Performance /SALP) Report," which is available to the public. The Lla test- such report for Haddam Neck was SALP Report No. 50-213/86-99 issued Vune 10 1087, which covered the period March 1,1986 through March 31, 1987.
The: latest.such report for Millstone 3 was SALP Report No. 50-493/85 08 issued May'14, 1987, which covered the period September 1, 1985 through February 28, 1087 The -SALP reports assess licensee performance in selected functinnal areas, which cover all, significant aspects' of plant operations related to nuclear
' safety and.the environment,.e.g., Plant Operations, Maintenance and 1
Modifications, Surveillance, Fire Protection, Engineering Support, licensing '
Activities, Refueling / Outage Management, Radiological Controls Emergency Preparedness, Security and Safeguards, Training and Qualification Effectiveness, and Quality Assurance. Each selected functional area is
. classified into one n' three performance categories:
Ca tenary 1. Reduced NPC attention mav be appropriate. Licensee management
-attention and _ involvement are aggressive and oriented toward nuclear safety;
'icensee resources are amole and ef fectively used so that a high level of 1
perfonnance with respect to operational safety is being achieved.
1
- , 1 r
\
1p r
~
_ - .J
i
,. o
[ .. .
.l The Honorable Christopher J. Dodd h l
L : Category 2.
.NPC. attention should be maintained at normal levels. Licensee management attention and involvement are evident and concerned with nuclear 1' : safety; licensee' resources are adeouate and reasonably effective-so that !
satisfactory performance with respect to operational safety is being achieved..
Category 3. Both'NRC and licensee attent'a. ?nuld be increased. Licensee management attention or-involvement is tcceptable and considers nuclear safety, but weaknesses-are evident; lv.ensee resources appear strained or not effectively used so that minimally sa'is'actory performance with respect to
- operational safety ~is being achieved.
In the, latest SALP reports, Millstone 3 was rated Category 1 in six functional !
areas and Category 2 in five functional areas: Haddam Neck was rated Category 1 {
'in one functional area, Category 2 in ten functional areas, and Category 3 in '
.'one functional area (fire protection).
- The. Millstone _3 SALP~ report reflected careful and safe performance of initial plant operation with improving performance as the. SALP period progressed. The
-Haddam Neck SALP report reflected continuing safe operation with numerous perfonnance weaknesses. In response to the NRC's SALP report, by letter dated July 17. 1987, the'Haddam Neck licensee stated its goal to return to Category 1 performance in all functional areas and identified several initiatives it has I taken to (1) reduce operator, equipment, and maintenance personnel contributions to unnecessary' trips, (2)- improve radiological controls, (3) reduce maintenance backlog, (4) maintain acceptable containment leakage, (5) ensure licensing issues are fully supported and addressed in a tirrely manner, (6) improve coordination between site and corporate staff, and (7) i:.iprove management involvement in the fire protection area.
We trust this information addresses your constitt.nt's concerns. .
Sincerely
,;v.
,g.
.a t *i. W d Victor Stello, Jr.
( Executive Director for Operations
- Enclosu re
-Article from S+ am'ord . Advoca te
- see previous concurrence f f
i n'/ PR i PDI-4 DRPR:PDJ d DPPR: PDI 4 Tech.Fd D f DP' , R SMNorri s RLFerguson:ah JFS tol Z .1Co rl ey B oger [ Varga
~10/22/87*. 10/99 87* 10/22/87* 10/23/87* 10/t$/8 /
1 10/p/87 ADPR N f , l9L E D' / GP/ , .A
'FJMi (lia T ey V ellol 10f /87 1 87 1 /$/
1 1
n .
f+# m
( c 1The Honorable Christopher J. Dodd :
h l1' Category 2. .NRC attention'should be maintained at normal levels. Licensee '
management attention and involvement are evident and concerned with nuclear
. safety;: licensee resources are adeouate and reasonably effective such that
. satisfactory performance with respect to operational. safety is being
~ achieved.:
Category 3.' Both NRCland licensee attention should be increased. Licensee
. management attention or involvement is acceptable and considers nuclear safety. but weaknesses.are evident;. licensee resources appear strained or not effectively'used such that minimally satisfactory performance with respect to operational; safety .is being' achieved.
n .+
-in 'the latest SALPkeports, Millstone 3 was rated Category 1 in six functional: areas.and? Category 9 in five functional areas, and Haddam Neck was ;
. rated Categoryf1 in one. functional area, Category ? in ten functional areas -l
.and Category 3 inione functional area (fire protection).
h .
(
The Millstone 3 SALP ref\ected careful 'and' safe performance of initial plant 7' 1 operation with improving ' rformance as the SALP period progressed. The
.Haddam Neck-SALP reflected ontinuino safe operation with numerous perfomance weaknesses. In response to heLNDC's_SALP report, by letter dated July 17, 1987, the Haddan Heck licens ~
stated his goal.to return to Category 1 performance in all functional reas and identified several initiatives he has
- taken to
- (1)' reduce' operator equipment, and maintenance personnel contributions to unnecessary t ips, (2) improve radiological controls,
'f3) reduce maintenance. backlog,14) maintain acceptable containment leakage, (5) assure licensing issues are #pily suppnrted and timely addressed,
~(6)- improveL coordination between tite-and corporate staff, and D) improve management involvement in the fire \ protection area. '
We. trust this information addresse our. constituent's concerns. i 4
Sincerely,
\
l Victor Stello, Jr.
Executive Director for Operations
Enclosure:
Article from
= Stamfnrd Advocate"
'DRP :PDI- DRPWiM-4 D DRPP:DIR SM.orr s :PDI-4 Tech.Edc DRPR:ADRI '
RLFeepuson:ah JFSt : h., le., t P.ABoger SAVarga
-10/4G/87 10/;M 87 10/g87 1 0 /.25/ 10/ /87 10/ /87 ADPP NRR:DIR EDO GPA/CA i FJMiraglia TEMurlev VStello ,.
10/:'/87 10/ /87 10/ /87 M _ - __-__ - _ _ _- -
} f ,[
edt i d -i tm .n-., .
t >yosbl .
u o he- o% ed o n s e nle e. t r p e i t at aao:hlu t
,o nlu s oc cddwCc
-- gh n davhw ri a e r r c n ac e t os,h s
u t rn t _eba ho e
r e
o* wdo md et a ue u
l sc o
cd ug s
e g C n e nt osa e wnd ad ad e r .oit aifs o g si w aiu nh o she ohth cc ct
,u a *)
e ags osuasel re u shap r e s v.
csdt rs
, t i
ti t n wCsmihde a l e ynbt r t ci. R yt fl s e r u a nu eht Trl iihy u oH ad a s o a t csn o
'e.be r sNkaIdoo l
um pt yue s nsCbr n s" cc
'e e i n
w r i d "g. narn i
dmgPi m - C5s w
a s gmrwtehc ia rrm n hotci o o e o esto i
r t
doelin o n oisoiaft a nhe i
~ ne u mG a oy mD o Re11. h caw sminh m ede rl ml oeedh aw pot pse n t u r r hf o tcv0p s
o "erwre rt at a .
ei t rdn eal a n
o (g ss O m$ wnih AFea n e e a ni a t n ua r f,fo noui endeSs pt es t a o n it yi u 3 ohrps g yde o i
rt sn ao kei g
d b ch ecd renaact aonh mg Ruomwo r
V e nr pf t
d e s i g Tpu ahr td as abda eh t
ei teh ASwods enr v4 t
rebmsognn m t n wl m1 g Mtuhewl
,i e Yfd e r op sf cu agra l
t thonFir n . ob e ni e ouro $ lg t r l
akdl i a ohri a enhlp t ugco ct b iest ci e i cmlehrad s '
t
~
sf -
a ~t- effib
. tr ne Int 3
- eegrs" -
'n yd di t echidso lah .e c
u 9edro o kaenf dinCcooh nl o ehcoie hfat u rdtn po h '*
t a rni as aa m tsie a sa r e an d n "6 o re dmp
,t r
pto tn sn en eoo nn r n a8t s
f i co m
e o 8 pl bn eamiC et c
- t st t o tC9e n Y%r o p o aMr o ea a petsaa a re 1 i
rp owfeeY r
nng e "m.y kan de t, ai a uh t s dctRw n 8 "" shll s th ernh ay 1
u neril. emit a t,l p g t 1 i ntic
- n i ci 8ibbe anal ais nyet s t
,sMen e ei cosefnt h
e h cuhm t l g t ra rd i
s o td4l c e e
n nhhur bo " ,d petei m d e e et o sba*
v i
aur r eps'*" si ri elhnr i
t dt t ae ek a t nft rei tht odot c npanWi ue iinwy wtha c es oe r 'e npwseekur t c ei u n n v h "* liUhY po oeeld r r ai y a e nd ppvru l
n* dt
.l oo ehn ef co ietn sot t
s nt a ee veo ad n eok n oefc ys abu c i s. s ske yeeCn
- C hchobt n e axn i*
are n ehe t
ee l
ei4 t
n Y e,I *t t
" fit a 'erwn eta u' aht ot nh e o awl awerugt, r
,I hh1d vi t erl hr ca
- t a 'e rco n u t e i".b" t a c icor el srhY.tn e s,h soae8 r6
.t w d h,W e i . n c u u n *
, e npt Nennnpyt as a tder t ui r e mT s e m9 t s6 otk6 t l
cauooa pn frwoew"hc aehe ame1l ~
a t
J na a9 n8 aeMNCrg t l o oCthl a sftI n1nlpr1" ti
- 9 pn
- - y , t h a. y s t en vi hsrags su crl rI anr" l
ctf eo r i s
E - s - . y nt ea e onb n Cauar l
v
- . e Wae Yw bit i
l gne i cne hwiu t
delcR ed ep i
r n
a t
o r B i t, a i p
e r o
.h nw6se ,8 u h a u n f
kwe n ed 9ntu rnF n.ep s ':n o ,u ntk em l I opr6s i ucy i m . y, cn n ie t
rc el rb gsyy sr ei w,o htan 1 i ao n e wrt8y oiNa u 6[ et s vfiaN3 srot u 6c cu nol n n atisdmd a amTes9t t t t s e sp l
o ewo mf r n o1 e na a emc8' c c n ai9 Rads s uu e e e 9 y\ 7hliAeos rr l cp ase r et
'r d MS e c t t n e b ph 1 r n n e e.k ps i l
p5is t 5 nMn .o n r y3 o dr1 /*aihmot i e ehcN Tl oh nod"dnptl h n r e y n. e h u rt ier
__ sNr da nl di ost nef u8 t oii 1
Capr" i eotCa n enrfi lewOa eoea o e e t ehta m d n e H "rf'3nwon9d yu t
a e i d sk o a a o s e 's e c i eii i sGcgnue t r s t n l tpx reer Rl p uno e ssneldrt t t f nigts e b pN 5 dkM eNn t
s i r asas rut ot o gb e o h n l
o*u mo n1 Mat o e g e e edi pA mt pn no e a t
a n Wtkm yaI mh o yi n o u c eae ufa u BSHt t t c r ul cr r nrsryd s sllhl Su a n cde edad s t su eu et Aiee cdilatrh o e e y2" i n hTahntaaup r
rl t ge t s o etkM ei8 o e wg a hr ga ae et h e eii enbdh y N2 ce na oiope noTfe r einf l
e a hh t t mtlapups t - I nrst r tkss [
~ l TF/Tk 8.t a Y
'.;di4 e. ,. r Aea>3t c i
-- ~
~
S
ha se n, n-
c L
! DISTRIBUTION'-
LDoc'htFile(50-213/50-4?3) k
'NRC PDR (w/cy of. incoming)
.LocalPORs'(w/cyof~ incoming)
~
' ED0 - #003205 ' ' '
EED0 Reading ,
,T._Murley/J. Sniezek-F. Miraglia
- PDI-4 Reading (w/cy of incomino).
tS..Varga.(21 "f,.
.BLRoger: : 4- -
OGC-BETH
'GPA/CA (3)'
, LSFCY:(31-CRC-87-1135
.VStello.
'DMossburg'-(EDO#003205)
LRLFerguson (w/cy of incomingi
.SMNorris-
?JFSto17.
l RStarostecki ;
-CThomas
'JBlaha:
f ,
(WRusselliRif
, idMurray I'
b l
at = : : _ - L. _ _ !
p.asog#o
'
- 4- UNITED STATES E" ..7, NUCLEAR REGULATORY COMMISSION g
.; WASHINGTON, D. C. 20555 '-
1 EDO PRINCIPAL CORRESPONDENCE CONTROL FROM: .DUE: EDO CONTROL: 003205 DOC DT 09/21/87 SEN.-CHRISTOPHER J. DODD 13 FINAL. REPLY: I TO: lh / ^t h } 0 OCA FOR SIONATURE OF: ** GREEN ** SECY NO: 1135 l
' EXECUTIVE DIRECTOR DESC: ROUTING: ;
ENCLOSES LETTER FROM STAN SZTABA RE SAFETY OF RUSSELL CONNECTICUT'S NUCLEAR POWER PLANTS MURRAY DATE: 10/06/87 AGSIGNED TO: NRR CONTACT: MURLEY SPECIAL INSTRUCTIONS OR REMARKS:
MARK ENVELOPE ATTN: MR. LOWELL STERN l
NRR RECEIVED: OC'IOBER 6,1987 i ACTION: DRPR:VARGA I ACTION )
NRR ROUTING: MURLEY/SNIEZEK MIRAGM A DUE TO NRR DIRECTOR,S 0, FICE j STAROSTECKI E5l BY 0 % 10,I W 7 .-- , I fOSSBURG l I
1
,,)
{
s i
l I
l
m g,
.. n i
l z
. OFFICE.OF THE SECRETARY I
.. CORRESPONDENCE CONTROL TICKET JPAPER' NUMBER:' CRC-87-1135 IOGGING DATE: Oct l
2 87 '
- ' ACTION OFFICE: EDO.
AUTHOR:. C.J. Dodd AFFILIATION:
U.S. SENATE i
., ? LETTER DATE:- / f18 S7 F.ILE CODE:
C<. ..
L ;
SUBJECT:
_ Safety of Connecticut's nuclear power plants
) i
. ACTION: ' Direct-Reply ~.
in V DISTRIBUTION: OCA to Ack
.1 SPECIAL HANDLING: None ,
- NOTES
- Stan Sztaba
?
.DATE DUE: .Oct 19 87 i
< SIGNATURE:. .
DATE SIGNED:
AFFILIATION:' l
\
i l
I L l p> !
. Rec'd Off. EDO I Date - I b - 5' ~ 9 )
Time- * @ -
p l
I i-g3 _ _ _ o o s 2 0 'i i
__