Forwards Insp Repts 50-456/98-02 & 50-457/98-02 on 980127- 0309 & Notice of Violation.Two Violations Identified.First Violation Involves Failure to Perform Independent Verification of Proper Sys Alignment
ML20216B032
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/08/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20216B037 List:
References
50-456-98-02, 50-456-98-2, 50-457-98-02, 50-457-98-2, NUDOCS 9804130354
Download: ML20216B032 (3)


See also: IR 05000456/1998002

Text

{{#Wiki_filter:_ _ .

   '
                                                                                                       l
                                                                                                                [-hl
           ..

l 6

                                                        UNITED STATES

!;' 8 "8y%

                                           NUCLEAR REOULATORY COMMISSION
     -
                     ,
     ,                S                                     REGION til
     5                *
                                                     801 WARRENVILLE ROAD
                                                    USLE. ILUNOIS 80632-4361

l *****

                                                     April 8, 1998

l

              Mr. Oliver D. Kingsley

l President, Nuclear Generation Group

              Commonwealth Edison Company
              ATT.: Regulatory Services
              Executive Towers West lll

l '

              1400 Opus Place, Suite 500
              Downers Grove, IL' 60515                                                                               ]

l SUBJECT: INSPECTION REPORT NO. 5(L456/98002(DRP); 50-457/98002(CRP) AND

                             NOTICE OF VIOLATION
                                                                                                                     \
              Dear Mr. Kingsley-
            On March 9,1998,' the NRC completed an inspection at your Braidwood Units i and 2 reactor
            facilities. The enclosed report presents the results of that inspection. During the six-week penod
            covered by this inspection, your conduct of activities was genere'ly characterized by safety-
                                                                                                                      {
            conscious operations, sound engineering and maintenance practices, and careful radiological
           work controls.

'

           We are concemed about two failures to follow station administrative procedures.
          'Two violations associated with these failures are described in the enclosed Notice of Violation
           (Notice). The first violation involves the failure to perform an independent verification of proper
           system alignment following the repositioning of safety related valves as required by station
           administrative procedures. The second violation involves the failure of the fire watch to patrol
           the Unit i lower cable spreading room every 15 minutes as required by station administrative
           procedures. These violations were inspector-identified. The failure to follow procedures has
           been highlighted in previous inspection reports and appears to be a remarring problem.
          'We are also concemed about a failure to co spb with Technical Specification requirements.
          Operators failed to take the actions requirst of feAnical Specifications following a change in
           Unit 2 operational modes with both trains of the boron dilution protection system inoperable.
          Since this issue was non-repetitive, self-identified, and corrected, it was considered a non-cited
          violation.
          Regarding the violations described in the enclosed Notice, relating to the failure to follow
          procedures, please note that you am required to respond to this letter and should follow the

l ' instruchons specified in the enclosed Notice when preparing your response. Your response

          should not only detail the actions you have taken or plan to take for the specific issues identified,
          but should also be more broadly focused and address what actions you plan or have taken to
          ensure that your corrective action process is effective. The NRC will use your respens'), in part,

! . to determine whether further enforcement action is necessary to ensure compliance wkh I

          regulatory requiremontr.
                                                ~
              9804130354 980408                                                                                  k
              PDR     ADOCK 05000456
              G                      PDR
                                                                                                                      ;
                                                                                                                     j
 O. Kingsley                                                     2
 In accordance with 10 CFR 2.790 of the NRC's  Rules of Practice," a copy of this letter, the
 enclosures, and your responses to this letter will be placed in the NRC Public Document Room.
                                                            Sincerely,
                                                            Geof. rey E. Grant, Director
                                                            Division of Reactor Projects
 Ds Aet Nos: 50-456, 50-457
 License Nos: NPF-72, NPF-77
 Enclosures:         1.       Notice of Violation
                    2.        Inspection Report
                                No. 50-456/98002(DRP);
                                No. 50-457/98002(DRP)
 cc w/encis:         M. Wallace, Nuclear Services
                       Senior Vice President
                    G. Stanley, PWR Vice President
                    J. Perry, BWR Vice President
                     D. Farrar, Regulatory                                                                                 ]
                       Services Manager                                                                                    '
                     l. Johnson, Licensing Director
                     DCD - Licensing
                    T. Tulon, Site Vice President -
                     Braidwood Station Manager
                    T. Simpkin, Regulatory
                       Assurance Supervisor                                                                                I
                     Richard Hubbard
                     Nathan Schloss, Economist
                       Office of the Attorney General
                     State Liaison Officer                                                                                 !
                     Chairman, Illinois Commerce
                       Commission
 DOCUMENT NAME: g:\brai\ bra 98002.drp
 To  e.iv. . ci.py of thi. docun.ni, ina'c4i. in ih. bo e - copy iihout .it.cht nci t - copo iih .ei.cht.nci *N* - No copy i
    OFFICE         Rlll                R,Il        //       Rlli        A/          Rlli        b         Rill
    NAME           Ton tc:             Shear [[3           Gardner (Secs.           Jord                  Grant             .
                                       (Secs. R1            F1 & F8 a d                                   j7
                                                                                                                           l
                    h if'              and R2)              NOV)f2             d'
    DATE           03/7k /98           03/2 # 98           03/4 /98                 03/$/9,8             N/       98
                                        OFFICIAL RECORD COPY
                                                                                     fI

i

 O. Kingsley                   3-
 Distribution:
 Docket File w/encls       DRP w/ ends
 PUBLIC IE-01 w/ ends      TSS wiencls
 A. Beach w/encis          DRS (2) w/encls .
 Deputy RA w/ ends         Rill PRR w/encls .
 Rill Enf. Coord. w/ ends  RAC1 (E-Mail)
 SRI Braidwood w/encis     CAA1 (E-Mail)
 Project Mgr., NRR w/ ends DOCDESK (E-Mail)
 GREENS
                                              !
                                              i
                                               I
                                               :
                                               l

t }}