Discusses Util 890221 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Util Taking Correct & Positive Measures Towards Ensuring That Plant Does Not Experience Subj Problems
ML20247C300
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 05/18/1989
From: Brown S
Office of Nuclear Reactor Regulation
To: Leonard J
LONG ISLAND LIGHTING CO.
References
GL-88-14, TAC-M71720, NUDOCS 8905240389
Download: ML20247C300 (4)


Text

_ _ _ _ _ - - _

May 18, 1989 Docket No. 50-322 _ DISTRIBUTION

Docket FHei SBrown Mr. John D. Leonard, Jr. NRC PDR CShiraki Vice President-Nuclear Operations Local PDR OGC Long Island Lighting Co. PDI-2 Reading EJordan Shoreham Nuclear Power Station SVarga BGrimes P.O. Box 618, North Country Road BBoger ACRS (10)

Wading River, NY 11792 WButler M0'Brien

Dear Mr. Leonard:

SUBJECT:

GENERIC LETTER 88-14, " INSTRUMENT AIR SUPPLY SYSTEM PROBLEMS AFFECTING SAFETY RELATED EQUIPMENT" (TAC NO. M 71720)

RE: SHOREHAM NUCLEAR POWER STATION, UNIT 1 Your letter of February 21, 1989, provided LILCO's response to the subject generic letter. In this response LILCO committed to:

Complete its investigation of variances found from design condition and to take appropriate measures to correct those parameters found beyond specification limits.

To evaluate several plant hardware modifications, to ensure that the Shoreham plant does not experience instrument air problems.

To make changes in both the Shoreham's operating procedures and emergency operating procedures to assist operators in identifying and verifying the design responses of selected air operated components.

To change the frequency of preventative maintenance surveillance of the air dryers from 24 to 12 months; and To enhance the training programs for licensed operation, non-licensed operators and I & C technicians to address instrument air system concern.

8 The staff has completed its review of your submittal and finds that LILCO is taking correct and positive measures towards ensuring that the Shoreham facility does not experience instrument air system problems.

Sincerely,

/s/

Stewart W. Brown, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

[ LEONARD)

Previously concurred

  • r)

PDI-2/PM SPLB/C* PDI-2/D SBrown:mr JCraig WButler VM q f/g89 05/18/89 f/y89 yP I

' O 8905240389 89031g DR ADOCK 05000322 PDC

1

- +*/ >: ug,k, UNITED STATES E a NUCLEAR REGULATORY COMMISSION E WASHINGTON, D. C. 20666 7.

% May 18, 1989 Docket No. 50-322 Mr. John D. Leonard, Jr.

Vice President-Nuclear Operations i Long Island Lighting Co.

Shoreham Nuclear Power Station P.O. Box 618, North Country Road Wading River, NY 11792

Dear Mr. Leonard:

l

SUBJECT:

GENERIC LETTER 88-14 " INSTRUMENT AIR SUPPLY SYSTEM PROBLEMS AFFECTING SAFETY RELATED EQUIPMENT" (TAC NO. M 71720)

RE: SHOREHAM NUCLEAR POWER STATION, UNIT 1 (

Your letter of February 21, 1989, provided LILC0's response to the subject generic letter. In this response LILCO committed to:

Complete its investigation of variances found from design condition and to take appropriate measures to correct those parameters found beyond specification limits.

To evaluate several plant hardware modifications, to ensure that the Shoreham plant does not experience instrument air problems.

To make changes in both the Shoreham's operating procedures and emergency operating procedures to assist operators in identifying and verifying the design responses of selected air operated components.

To change the frequency of preventative maintenance surveillance of the air dryers from 24 to 12 months; and To enhance the training programs for licensed operation, non-licensed operators and I & C technicians to address instrument air system concern.

The staff has completed its review of your submittal and finds that LILCO is taking correct and positive measures towards ensuring that the Shoreham facility does not experience instrument air system problems.

Sincerely, M

Stewart W. Brown, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation 1

. t Mr. John D. Leonard, Jr. Shoreham Nuclear Power Station Long Island Lighting Company Cc' Victor A. Staffieri, Esq. Supervisor General Counsel Town of Brookhaven Long Island Lighting Company 205 S. Ocean Ave. j 175 East Old County Road Patchogue, New York 11772 Hicksville, New York 11801 q Town Attorney W. Taylor Reveley, III, Esq. Town of Brookhaven Hunton & Williams 3232, Route 112 Post Office Box 1535 Medford, NY 11763 707 East Main Street Richmond, Virginia 23212 MHR Technical Associates 1723 Hamilton Avenue Mr. Lawrence Britt Suite K Shoreham Nuclear Power Station San Jose, California 95125 Post Office Box 618 Wading River, New York 11792 Richard M. Kessel Chairman & Executive Director Mr. John Scalice New York State Consumer Protection Plant Manager Board Shoreham Nuclear Power Station Room 1725 Post Office Fox 628 250 Broadway Wading River, New York 11792 New York, NY 10007 Resident Inspector Jonathan D. Feinberg, Esq.

Shoreham NPS New York State Department U.S. Nuclear Regulatory Conslission of Public Service Post Office Box B Three Empire State Plaza Rocky Point, New York 11778 Albany, New York 12223 Regional Administrator, Region I Gerald C. Crotty Esq.

U.S. Nuclear Regulatory Conmiission Ben Wiles, Esq.

475 Allendale Road Counsel to the Governor King of Prussia, Pennsylvania 19406 Executive Chamber State Capitol Ms. Donna Koss Albany, New York 12224 New York State Energy Office Agency Building 2 Herbert H. Brown, Esq.

Empire State Plaza Lawrence Coe Lanpher, Esq.

Albany, New York 12223 Karla J. Letsche Esq.

Kirkpatrick & Lockhart South Lobby - 9th Floor 1800 M Street, N.W.

Washington, D.C. 20036-5891

a, .:

  • a '...*

1 ., t-Long Island' Lighting Company . Shoreham cc:

Dr. Monroe Schneider Mr. Charlie Donaldson North Shore Committee Assistant Attorney General Post Office Box 231 NYS Department of Law Wading River, NY 11792 Room 3-118 120 Broadway Fabian G. Palomino Esq. New York, NY 10271 Special Counsel to the Governor Executive Chamber - State Capitol Albany, NY 12224 Martin Bradley Ashare,~Esq.

Suffolk County Attorney H. Lee Dennison Building Veteran's Memorial Highway Hauppauge, NY 11788 Robert Abrams, Esq.

Attorney General of the State of New York ATTN: John Corwin,-Esq.

New York State Ocpartment of Law Consumer Protection Bureau 120 Broadway 3rd Floor New York, NY 10271 Honorable Peter Cohalan Suffolk County Executive County Executive / Legislative Building Veteran's Memorial Highway Hauppange, NY 11788 Ms. Nora Bredes Shoreham Opponents Coalition 195 East Main Street Smithtown, New York 11787 Chris Nolin New York State Assembly Energy Committee 626 Legislative Office Building Albany, New York 12248 1