ML20247A464

From kanterella
Jump to navigation Jump to search
Grants 881118 Request for Exemption from Licensing Fees for 890422-0630.Prorated Invoice for Portion of Third Quarter of FY89 Encl
ML20247A464
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 05/12/1989
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Leonard J
LONG ISLAND LIGHTING CO.
References
NUDOCS 8905230152
Download: ML20247A464 (7)


Text

__ _ _

't l- .

l l

NAY 12198g Docket No. 50 322 Long Island Lighting Company ATTN: Mr. John D. Leonard V!ca President, Nuclear Operations P.O. Box 616 North Country Road Wading River, NY 11792 Gentlemen:

By letter dated November 18,1988 (SNRC-1517), your Gnmpany requested an exemption from the' annual fee requirements of 10 CFR 171 for that part of FY 1989 during which the Shoreham Nuclear Power Station (SNPS) remained limited to 5% of its rated thermal power. You state that the bases remain the same as in your requests for exemptions for FYs 1987 and 1988 in that you are still unable to produce marketable electric power because of the 5% license limitation.

We have completed our review of your request and have taken into consideration the fact that a full power operating license was issued for the SNPS on April 21, 1989. Based on the circumstances of the case which placed limitations on plant operation prior to April 21, 1989, we have determined that an exemption from annual fees for a portion of FY 1989 is appropriate. Therefore, pursuant to the provisions of 10 CFR 171.11, an exemption is hereby granted fer the Shoreham Nuclear Power Station for the period from October 1,1988, through April 21, 1989.

Since the SNPS received a full power license on April 21, 1989, enclosed is a prorated invoice for $235,002 for a portion of the third quarter of FY 1989 covering the period from April 22 through June 30, 1989.

Invoices for the fourth quarter payment on annual fees will not be issued until approximately June 30, 1989.

If further information is desired, contact C. James Holloway, Jr., on 301-492-7225.

Sincerely, 9 8 8905230152 89 N 2 PDR Victor Stello, Jr. -

ADOCK O 00322 P pg Victor Stello, Jr.

Executive Director for Operations

Enclosure:

0 Invoice No. H0968 for $235,002 i

f I M ,

"TfTl"C"I~~~:0C  : OGC al :0C/DAF 0 fi  : ED

___ _..... : ..g/ L F MBgL:. V.....:.....$___.::.f .l.q....: __ ._______:....________:

EB1ack :Lhiller  :  :  :

SURNAME [P 1Diggs'ab onner-JHolloWyfed-

GJohnso :RScroggins  : tello

........ :.. .. ______:..__g.......:.._j .. g :--.... .....:. ____...... ...____..._-_

gg .

.y . - n

?%f :y

.c. ,

1 .?

.-_i MAY'121900

& ' DISTRIBUTION w/o encl.:.

' c;!

, PDR-LPDR

' edlegIMINAssWIW/. encl.

~ ~ ~

  • a- VStello,.EDO.

RMScroggins LHiller . .

RFonner, OGC

,GJohnson SBrown, PD1-2.

P0'Brien, PD1-2 CJHol_loway, LFMB KMDiggs,;LFMB (2) - w/ enc 1.

MRodriguez, DAF -._ w/ encl. .

LTremper, LFMB - w/ encl..

<J ' LFMB Reactor File'- w/ enc 1.

LFMB 171 File - w/ encl.

LFMBR/F(2)

OC/DAF R/F' DW/JP/ Doc.No. 50-322 OC R/F ED0 R/F

.c

.s

..a u i

l !.

.i n

p 1

NMC FORM 399 U.S. NUCLEAR REGULATORY COMMISSloN INVotCE NUMBER (2-m>

C INVOICE

- H0958 MA3E CHECKS PAYAllLE To THE U.S. NUCLEAR HEGULAToRY COMMISSION, RFFEMENCE THE INVolCE NUMBER oN REMITTANCE, AND INVolCE DATE

"^* IO U.S. NUCLEAR REoVLATORY COMMISSION OFFICE OF ADMINISTRATION AND RESOURCES MANAGEMENT DIVISloN OF ACCOUNTING AND FINANCE II WASHINGTioN, DC 20566 LICENSE NUMBER (lr appocaNel NPF-82 TO: REFERENCE NUMBER firapphcaNel Doc.No. 50-322 Long Island Lighting Company contact:

ATTN: Mr. John D. Leonard NAMs Vice President, Nuclear Operations Janet M. Rodriguez P.O. Box 618 TELERuoNE North Country Road AREA juuM.ER Wading River, NY 11792 c"' 492-4200 301 DESCRIPTION AMOUNT This invoice is for annual fees that are in the third quarter $235,002 installment for Fiscal Year 1989 in accordance with 10 CFR 171 for the Shoreham Nuclear Power Station. The invoice is pro-rated and covers the period of April 22, 1989 through June 30, 1989. The amount due is $235,002 based on cost per day times days remaining in FY from 4/21/89 - 9/30/89 less fourth quarter amount of $303,000. It is based on the following annual fee amount:

$1,219,000 (All Plants) 98,000 (All BWRs) 70,000 All Mark II's) 42,000 All Mark II's & Mark III's) 14,000 East Of Rockies)

$1,443,000(BudgetBase) l x. 84 (M Factor)

{

$1,212,000 ( Annual Fee) l I

l l

AMOUNT DUE

! FACILITY REVENUE CODE: AA903 ANN

<s. r-, $235,002 I

TERMS. Interest will accrue from the invoice date at the annual rate of  %. Payment is due immediately. However, interest will be waived if payment is received within 30 days from the invoice date. Penalty and administrative charges will be assessed on a delinguent invoice. Additional terms and con-ditions are attached, if applicable.

NOTE. If there are any questions about the existence or amount of the debt, contact the individual named above. For NRC debt collection procedures, in-ciuding interest and penalty provisions, see 31 U.S.C. 3717,4 CFR 101 105, and 10 CFR 15.

.. , I q ,:

l U.S. NUCLEAR REGULATORY COMMISSION .

ANNUAL FEE INVOICE - TERMS AND CONDITIONS

\

4

Refund. The U.S. Nuclear Regulatory Commission (NRC) will refund any overpayment in accord-

.ance with 10 CFR 171.21, to include any interest paid by the licensee on such amount. NRC l' may not pay interest on the principal amount of the annual fee which was paid to NRC and is later refunded.

D Penalty and Administrative Costs. A penalty charge will be assessed on any portion of a i; ' debt:that is delinquent for more than 90 days at the annual rate of 6 percent-(4 CFR E

102.13(e)). This charge shall be calculated on or after the 91st day of delinquency, but shall" accrue from the date that the debt became delinquent. For this purpose, a debt is

" delinquent" if it has not been paid by the invoice date. An administrative charge will be assessed against a debt that remains delinquent for over 30 days; such assessment shall be

~ based on the actual additional costs incurred in processing and handling the delinquent debt, but not less than $10.00 per month.

Other Consequences for Failure to Pay on a Timel) -3 asis.

a): If a quarterly installment of the annual fee is not received within 30 days from the invoice date, the balance of the. annual fee becomes due and payable, with interest and p:nalties calculated from the invoice date (10 CFR 171.25).

b) .If the annual fee is not paid when due, the Commission may refuse to process any appli-cation person,submitted by or onorbehalf and may suspend revokeofany thelicenses person held with by respect to any(license the person issuedThe 10 CFR 171.23). to the suspension or revocation of a license does not waive or affect any debt due from a licensee.

' Application for Exemption from the Annual Fee Pursuant to 10 CFR 171.11.

a) The NRC will not extend the 30-day-interest-waiver period because of the submission of'an application for exemption from the annual fee pursuant to 10 CFR 171.11.

b) If the NRC grants an exemption, the NRC will make an adjustment upon invoicing the balance of the annual fee and will make a refund only to the extent that the annual fee payment (s) received from the licensee exceed the adjusted annual fee.

[

>R ? E2g o,, UNITED STATES

.g_ g NUCLEAR REGULATORY COMMISSION g ;E WASHINGTON, D. C. 20555

%; . . . . . /

.a i

OCT 011988 PROCEDURES FOR ELECTRONIC FUNDS TRANSFER

'I I

Commission (NRC) has been informed by the U.S.

-The Department U.S. Nuclear Regulatory (Treasury) that effective October 1,1988, changes of the. Treasury a will affect our ability to receive funds through Fedwire Deposit System (FDS). The basic FDS wire message format will be changed to comply with the 1 Federal Reserve Board's decision to implement a standard structured third  !

party format for all Electronic Funds Transfer (EFT) messages. A sample of '

an EFT message to Treasury and a narrative description of each field follows:

1 0210 (2) i i m im e m i I (6) ' / l 1Tou s w c/et t thw-/AcNdoool osi- i ,

l JC i I

Field Content 1 . RECEIVER-DFI# - The Treasury Department's ABA number for deposit messages is 021030004.

2 TYPE-SUBTYPE-CD - The type and subtype code will be provided by the sending bank.

3 SENDER-DFIf - This number will be provided by the sending bank. i I

4 SENDER-REF# - The sixteen character references number is inserted by the sending bank at its option. l 5 AMOUNT - The transfer amount must be punctuated with comas and decimal point; use of the "$" is optional. This item will be provided by the depositor.

6 SENDER-DFI-NAME - This information is' automatically inserted by the Federal Reserve Bank.

1 j

l l

1 7 RECEIVER-DFI-NAME - The Treasury Department's name for l deposit messages.is "TREAS NYC", This name should be entered 1 by the sending bank. J 1

8 PRODUCT CODE - A product code of "CTR" for customer transfer )

should be the first data in the RECEIVER - TEXT field. Other values may be entered, if appropriate, using the ABA's options. A slash must be entered after the product code.

9 AGENCY LOCATION CODE - THIS ITEM IS OF CRITICAL IMPORTANCE. ,

IT MUST APPEAR ON THE FUNDS TRANSFER DEPOSIT MESSAGE IN THE I PRECISE MANNER AS STATED TO ALLOW FOR THE AUTOMATED PROCESSING  !

AND CLASSIFICATION OF THE FUNDS TRANSFER MESSAGE TO THE AGENCY LOCATION CODE OF THE APPROPRIATE AGENCY. The ALC identification sequence can, if necessary begin on one line and end on the  !

next line; however, the field tag "BNF=" must be on one line and cannot contain any spaces. NRC's 8-digit ALC is:-

l I

BNF=/AC-31000001 THIRD PARTY INFORMATION - The Originator to Beneficiary Information field tag "0BI=" is used to signify the beginning of the free-form third party text.- All other-identifying information to enable the NRC to identify the deposit, e.g.,

NRC invoice number, description of fee - 10 CFR 171 annual fee, and plant name.

The optimum format for fields 7, 8, 9, and 10 using an 8-digit ALC is as follows:

TREAS NYC/CTR/BNF=/AC-31000001 OBI =

The optimum fomat, shown above, will allow 219 character positions of information following the "0B1=" indicator.

If the licensee's bank is not a member of the Federal Reserve System, the-non-member bank must transfer the necessary information and funds to a member bank who then must transfer the information and funds to the local Federal Reserve Bank.

For transfsr of funds'from local Federal Reserve Banks to be recorded on the same day, the transfer must be received at the New York Federal Bank by 4 p.m., EST. Otherwise, the deposit will be recorded on the next working day. ,

If there are any questions, contact NRC Financial Operations Branch, Division of Accounting and Finance, tel: (301)492-4200).

I

c .

7 RECEIVER-DFI-NAME - The Treasury Department's name for deposit messages is ".TREAS NYC". This name should be entered by the sending bank.

8 PRODUCT CODE - A product code of "CTR" for customer transfer should be the first data in the RECEIVER - TEXT field. Other values may be entered, if appropriate, using the ABA's options. A slash must be entered after the product code.

9 AGENCY LOCATION CODE - THIS ITEM IS OF CRITICAL IMPORTANCE.

IT MUST APPEAR ON THE FUNDS TRANSFER DEPOSIT MESSAGE IN THE PRECISE MANNER AS STATED TO ALLOW FOR THE AUTOMATED PROCESSING AND CLASSIFICATION OF THE FUNDS TRANSFER MESSAGE TO THE AGENCY LOCATION CODE OF THE APPROPRIATE AGENCY. The ALC identification sequence can, if necessary begin on one line and end on the next line; however, the field tag "BNF=" must be on one line and cannot contain any spaces. NRC's 8-digit ALC is:

BNF=/AC-31000001 THIRD PARTY INFORMATION - The Originator to Beneficiary Information field tag "0BI=" is used to signify the beginning of the free-form third party text. All other-identifying information to enable the NRC to identify the deposit, e.g.,

NRC invoice number, description of fee - 10 CFR 171 annual fee, and plant name.

l l

The optimum format for fields 7, 8, 9, and 10 using an 8-digit ALC is as follows:

TREAS NYC/CTR/BNF=/AC-31000001 081=

The optimum format, shown above, will allow 219 character positions of infomation following the "0BI=" indicator.

If the licensee's bank is not a member of the Federal Reserve System, the non-member bank must transfer the necessary information and funds to a member bank who then must transfer the infomation and funds to the local Federal Reserve Bank.

For transfer of funds from local Federal Reserve Banks to be recorded on the same day, the transfer must be received at the New York Federal Bank by 4 p.m., EST. Otherwise, the deposit will be recorded on the next working day.

If there are any questions, contact NRC Financial Operations Branch, Division of Accounting and Finance, tel: (301)492-4200).

,p d . l* Lhl C %

q * / C Y'g%  ? GL-L.v l hf fLL g L.ONG ISLAND LIGHTING COMPANh SHOREHAM NUCLEAR POWER STATION P.O. BOX 618, NOHTH COUNTRY ROAD e WADING RIVER. N.Y.11792 JOHN D. LEONARD, JR.

VICE PRE $10$NT . NUCLEAR OPELTIONS SNRC-1517 NOV 181988

!. Mr. Victor Stello, Jr.  !

Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Extension of Exemption From Payment Of The Annual License Fee Under 10 CFR 171 For The Shoreham Nuclear Power Station Operating License NPF-36 Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322

Dear Mr. Stello:

Currently, the operation of the Shoreham Nuclear Power Station is still restricted to no more than 5% of its rated thermal power.

The Long Island Lighting Company ("LILCO") therefore requests, in accordance with the provisions of 10 CFR 171.11, that its exemption from payment of the annual fee under 10 CFR 171 again be extended to that part of Fiscal 1989 during which this condition prevails.

Conditions remain as we cited in our previous exemption requests; while LILCO has held an operating license for Shoreham since December 1984, the plant cannot produce marketable electric power because of the 5% thermal power restriction. Thus far, LILCO's inability to obtain a license to operate Shoreham above 5% is due solely to the refusal of the state and local governments to participate in emergency planning. This opposition continues.

Until the licensing impasse is resolved or other decisions are made concerning the plant, the high cost of carrying the plant remains.

In short, the status of the Shoreham Station remains i

substantially unchanged from that described in our previous I exemption requests (SNRC-1288 of November 7, 1986 and SNRC-1359 of August 14, 1987). Although recent licensing developments are n-,, _

pts.

+....: ..

4

~

SNRC-1517 Page 2 favorable in that they may lead to the issuance of an operating license permitting the plant to exceed the'5% limit, the future remains uncertain. Thus, operation above 5% may not be achieved e

i for.some time.

If Shoreham is licensed to operate above the 5%. limit during Fiscal' Year 1989 and the power. level is in fact raised, LILCO understands that as.in the previous years,-the requested fee exemption would be lifted.and the payment thereof would be prorated through the remainder of the year and would be payable in full thereafter.

Should you wish to discuss this request or any other matters ,

relating to the Shoreham' plant, please contact me or other authorized members of my staff.

/ // fl t ,

t .,

'3 Bled)(tod<[/

,J . ( D . Leonard, Jr.

' l

/ Vice President, Nuclear Operations l

(

I' MJG/ap l)-

(~ - .

cc: S. Brown F.-Crescenzo W., Russell Document Control Desk

)

I i

l

-- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ __ A