MONTHYEARML20217K1051999-10-19019 October 1999 Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4701999-09-10010 September 1999 Rssponds to NRC 990709 RAI Re Util Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection Iwe. Acceptance Criteria for Liner Plate Pressure Boundary Thickness Will Be Limited to 10% Nominal Thinning ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210R7241999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for 990101-990630,IAW 10CFR26.71(d) ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ULNRC-04085, Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power1999-08-11011 August 1999 Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ULNRC-04079, Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210H6381999-07-30030 July 1999 Forwards SE Accepting Relief Request for Approval for Use of Alternate Exam Requirement for Plant Inservice Insp Program A93443, Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves1999-07-28028 July 1999 Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves ULNRC-04075, Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves1999-07-28028 July 1999 Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves ULNRC-04076, Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs1999-07-28028 July 1999 Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs ULNRC-04070, Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power1999-07-27027 July 1999 Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power 05000483/LER-1998-008, Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved1999-07-27027 July 1999 Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved ULNRC-04071, Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-021999-07-27027 July 1999 Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-02 ML20210B5611999-07-20020 July 1999 Forwards Review of Ltr & Encl Objectives for Plant,Unit 1,1999 Emergency Plan Exercise Scheduled for 990914 ML20210B4021999-07-19019 July 1999 Ack Receipt of Facility Emergency Plan Implementing Procedure EIP-ZZ-00101, Classification of Emergencies, Rev 23,issued on 990513,under Provisions of 10CFR50,App E, Section V ML20210B4401999-07-19019 July 1999 Ack Receipt of Revs to Facility Radiological Emergency Response Plan,Chapters 8.0 & 4.0,issued Respectively on 990512-14,under Provisions of 10CFR50,App E,Section V ML20212A3291999-07-15015 July 1999 Forwards Scenario Manual Containing Description of Callaway Plant 1999 Biennial Emergency Response Plan Exercise to Be Conducted 990914.Correspondence to Satisfy 60-day Submittal Requirement ML20209F3471999-07-0909 July 1999 Forwards Response to NRC 990624 RAI to Complete NRC Review of Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection IWE ML20209E5591999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.TAC MA0531 Closed ML20209H2471999-07-0707 July 1999 Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Rev Withheld,Per 10CFR73.21 ML20196J9501999-07-0202 July 1999 Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required ML20209B6851999-06-28028 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Nuclear Power Plants. Disclosure Rept Encl ML20209C0171999-06-28028 June 1999 Forwards Special Rept 99-01 Re Fifteenth Year Inservice Containment Bldg Tendon Surveillance Failure.Observed Voids in Sheathing Filler Grease Do Not Indicate Degradation of post-tensioning Sys,Based on Encl Evaluation ML20196F8101999-06-25025 June 1999 Informs That J Donohew Will Assume Project Manager Responsibilities,Effective 990621 ML20196H2521999-06-25025 June 1999 Forwards Insp Rept 50-483/99-05 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196F8181999-06-24024 June 1999 Forwards RAI Re 990111 Request for Relief from Certain ASME Code ISI Requirements for Containment Liners.Response Requested within 30 Days from Date of Agreement ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve IR 05000483/19990041999-06-18018 June 1999 Refers to GL 96-05 Issued by NRC on 960918,UE Responses & 970313 & NRC Insp Rept 50-483/99-04,dtd 990427. Forwards Request for Addl Info Re GL 96-05 Program at Callaway Plant,Unit 1 ML20212J2441999-06-18018 June 1999 Submits Request for Alternate Exam Requirements for Plant Re ISI Program Plan.Plant Does Not Torque Bolted Connections to Stress Values Greater than 100 Ksi ML20195H0971999-06-14014 June 1999 Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207H3751999-06-14014 June 1999 Discusses 990407 Une Request That Proprietary Version of Document Entitled, Evaluation of Severe Accident Simulation, Dtd April 1999,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20195H9731999-06-11011 June 1999 Forwards Requested Addl Info Related to Relief Request ISI-16,encountered During Refuel 9 ML20195J9301999-06-0808 June 1999 Informs That Refuel 9 OAR-1 Owners Data Rept for ISI & Summary Rept for Interval 2 Was Submitted with Typographical Error,In That Commercial Service Date Should Be 841219,vice 941219.Please Substitute Encl Corrected Document ML20207G3201999-06-0707 June 1999 Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified ML20207G3151999-06-0707 June 1999 Ack Receipt of Callaway Plant EP Implementing Procedure EIP-ZZ-001001M,Classification of Emergencies,Rev 22,issued on 981222 Under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195C5131999-05-28028 May 1999 Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 A98803, Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS1999-05-27027 May 1999 Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS 1999-09-22
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217K1051999-10-19019 October 1999 Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6381999-07-30030 July 1999 Forwards SE Accepting Relief Request for Approval for Use of Alternate Exam Requirement for Plant Inservice Insp Program ML20210B5611999-07-20020 July 1999 Forwards Review of Ltr & Encl Objectives for Plant,Unit 1,1999 Emergency Plan Exercise Scheduled for 990914 ML20210B4401999-07-19019 July 1999 Ack Receipt of Revs to Facility Radiological Emergency Response Plan,Chapters 8.0 & 4.0,issued Respectively on 990512-14,under Provisions of 10CFR50,App E,Section V ML20210B4021999-07-19019 July 1999 Ack Receipt of Facility Emergency Plan Implementing Procedure EIP-ZZ-00101, Classification of Emergencies, Rev 23,issued on 990513,under Provisions of 10CFR50,App E, Section V ML20209E5591999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.TAC MA0531 Closed ML20196J9501999-07-0202 July 1999 Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required ML20196F8101999-06-25025 June 1999 Informs That J Donohew Will Assume Project Manager Responsibilities,Effective 990621 ML20196H2521999-06-25025 June 1999 Forwards Insp Rept 50-483/99-05 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196F8181999-06-24024 June 1999 Forwards RAI Re 990111 Request for Relief from Certain ASME Code ISI Requirements for Containment Liners.Response Requested within 30 Days from Date of Agreement IR 05000483/19990041999-06-18018 June 1999 Refers to GL 96-05 Issued by NRC on 960918,UE Responses & 970313 & NRC Insp Rept 50-483/99-04,dtd 990427. Forwards Request for Addl Info Re GL 96-05 Program at Callaway Plant,Unit 1 ML20207H3751999-06-14014 June 1999 Discusses 990407 Une Request That Proprietary Version of Document Entitled, Evaluation of Severe Accident Simulation, Dtd April 1999,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20195H0971999-06-14014 June 1999 Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207G3151999-06-0707 June 1999 Ack Receipt of Callaway Plant EP Implementing Procedure EIP-ZZ-001001M,Classification of Emergencies,Rev 22,issued on 981222 Under 10CFR50,App E,Section V Provisions.No Violations Identified ML20207G3201999-06-0707 June 1999 Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified ML20207E2711999-05-25025 May 1999 Ack Receipt of in Response to & Insp Rept Confirming Commitment as Stated by M Taylor During Telephonic Exit Meeting on 990413 ML20207A8711999-05-24024 May 1999 Informs That NRR Reorganized,Effective 990328.Forwards Organization Chart ML20207A4131999-05-19019 May 1999 Forwards Insp Rept 50-483/99-03 on 990321-0501.One Violation of NRC Requirements Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20206K6511999-05-10010 May 1999 Forwards RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206N3981999-05-10010 May 1999 Responds to Comments & Questions Submitted to NRC Staff Re Recent License Amend Issued by NRC to Callaway Unit 1 License.Provides Context for Conclusion That Reracking of Callaway SFP Maintains Adequate Protection of Public Safety ML20206H1101999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407,to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheets & Results to Appropriate Individuals.Without Encl ML20206H1821999-05-0606 May 1999 Forwards RAI Re Licensee Request for Relief from Certain ASME Code ISI Requirements Submitted by .Response Requested within 30 Days of Receipt of Ltr ML20206F4931999-05-0303 May 1999 Forwards Exam Rept 50-483/99-302 on 990416.Insp Included Evaluation of Applicant for Reactor Operator License ML20205S2571999-04-19019 April 1999 Discusses Plans to Sponsor Testing of Electrosleeved Tubes to Better Understand Behavior of Electrosleeve Matl Under Severe Accident Conditions ML20205Q5461999-04-19019 April 1999 Forwards Safety Evaluation Relief Request from Certain ASME Section XI Requirements for Concrete Containment ISI for Plant ISI Program ML20205K7641999-04-0808 April 1999 Ack Receipt of Re Comments & Questions Concerning Recent Amend to Plant,Unit 1.Response to Comments & Questions Should Be Completed by mid-May ML20205J8701999-04-0606 April 1999 Ack Receipt of ,In Response to NRC Insp Rept 50-483/99-02,dtd 990225 Re Verbal Commitment Made During Exit Meeting for Insp.Understands Next Rev of Security Plan Will Include Increased Min Staffing of Three Armed Guards ML20205J8721999-04-0505 April 1999 Refers to Meeting Conducted in Emergency Operations Facility at Callaway Plant on 990401 Re Plant Performance Review for Plant Completed on 990211.Year 2000 Readiness Issues & New Reactor Licensee Performance Assessment Also Discussed ML20205J9401999-04-0505 April 1999 Forwards Insp Rept 50-483/99-01 on 990207-0330.One Violation Occurred & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy IR 05000019/20250011999-04-0202 April 1999 Informs That Version of Topical Rept BAW-10219P,Rev 3 Dtd Oct 1998 & Document 51-5001925-01,dtd 980828 Will Be Marked as Proprietary & Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20205A3821999-03-19019 March 1999 Advises of NRC Planned Insp Effort Resulting from Callaway Plant Performance Review for Period 970510-990125. Historical Listing of Plant Issues & Details of NRC Insp Plan for Next 8 Months Encl ML20204E7281999-03-18018 March 1999 Ack Receipt of Which Transmitted Rev 28 to Callaway Plant Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Util Determined Changes Do Not Decrease Effectiveness of Plan ML20204E3671999-03-18018 March 1999 Informs That During 990128 Telcon Between D Lantz & H Bundy, Arrangements Were Made for Administration of Retake Written Operator Licensing Exam at Plant,During Wk of 990419 ML20204B7091999-03-15015 March 1999 Informs That Changes Described in ,Submitting Rev 20 to Plant Operational QA Manual,Appear Consistent with Guidelines for non-reduction in Committments ML20204C4241999-03-15015 March 1999 Forwards Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20207F4731999-03-0404 March 1999 Discusses 990302 Public Meeting Re Program Updates & Organizational Changes in Emergency Preparedness & Security. List of Attendees & Licensee Presentation Encl ML20207L6491999-03-0404 March 1999 Informs That Util 990111 Response to Request for Addl Info Re Question 4 Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant to 10CFR2.709(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended 1999-09-22
[Table view] |
Text
I i
f Giug UNITED STATES
, f- g NUCLEAR REGULATORY COMMISSION
$ REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, T EXAS 760118064 o
June 3, 1998 Garry L. Randolph, Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, Missouri 65251 SUBJECT: NRC INSPECTION REPORT 50-483/98-06 Thank you for your letter of May 22,1998, in response to our April 22,1998, letter and Notice of Violation concerning emergency plan changes that decreased the effectiveness of the Callaway Plant Radiological Emergency Response Plan and did not receive prior NRC approva We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintaine
Sincerely,
,
Blaine Murray, hief i
'
Plant Support Branch Division of Reactor Safety Docket No.: 50-483 License No.: NPF-30 cc:
Professional, Nuclear Consulting, In Raines Drive Derwood, Maryland 20855 Gerald Charnoff, Es Thomas A. Baxter, Es Shaw, Pittman, Potts & Trowbridge 2300 N. Street, [
Washington, D.C. 20037 [
m so m aa m s0a PDR ADOCK 05000403 G PDR
.
'
.
Union Electric Company -2-
. H. D. Bono, Supervising Engineer Qualdy Assurance Regulatory Support Union Electric Company P.O. Box 620 Fulton, Missouri 65251 Manager- Electric Department Missouri Public Service Commission 301 W. High .
- P.O. Box 360 Jefferson City, Missouri 65102 Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176
' Jefferson City, Missouri 65102 Otto L Maynard, President and
- Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839
- Dan 1. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, Missouri 63130 Lee Fritz, Presiding Commissioner
,
Callaway County Court House L -10 East Fifth Street Fulton, Missouri 65151 L
Alan C. Passwater, Manager l Licensing and Fuels .
AmorenUE One Amoren Plaza-1901 Chouteau Avenue
~ P.O.' Box 66149
. St. Louis, Missouri 631664149 i
+
-
k I
. _ _ _ - _ _ - _ _ _ - - _ _ _ _ _ - _ - _ _ - _ _ - - . ___ ___-__
.
.
Union Electric Company -3-
- J V. Laux, Manager
.
Quality Assurance :
Union Electric Company P.O. Box 620 Fulton, Missouri 65251
!
.
L e ,
j~
p L l
L .
~
Union Electric Company -4-DISTRIBUTION w/cooy of licensee's letter dated May 22.1998::
DCD (IE35)
Regional Administrator Callaway Resident inspector DRS Director DRS Deputy Director l, DRP Director DRS-PSB Branch Chief (DRP/B)
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
MIS System l RIV File
! DRS Action item File (98-G-0067)(Goines)
l l
DOCUMENT NAME: R:\_CVWCW806AK.GMG'
,
, To receive copy of document, indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No eq)y RIV:PSB E C:DRS\PSL ~
GMGood:nh (,MW BMurray ' '// . '
06r)/98 06/hE8:
OFFICIAL RECORD COPY
~
. . _ . - ._- .
__ _ _ _ , _ = _ - _ _ _ _ _ _ _ _ _ -
i
'
.
l .
Union Electric Company -4-DISTRIBUTION w/coov of licensee's letter dated May 22.1998::
DCD (IE35)
Regional Administrator Callaway Resident inspector DRS Director DRS Deputy Director DRP Director DRS-PSB Branch Chief (DRP/B)
,
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
l MIS System
'
RIV File DRS Action item File (98-G-0067)(Goines)
,
DOCUMENT NAME: R:\_CVWCW806AK.GMG To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PSB - E C:DRS\PSL ~
GMGood:nh (MV BMurray ' '[/ ~
06rJ/98 06/hq8 OFFICIAL RECORD COPY 080062
- - - - _ _ - - - - - - -_J
[J ,
union Doctric Po Box 620
, CallswarMant Fulton, MO 65251
.
- I:
'l
!;526 May 22,1998
,
-,
<w,
,,
i U. S. Nuclear Regulatory Commission 1 Atta: Document ControlDesk Mail Stop P1-137
Washington, DC 20555-0001 ULNRC-3815 gI/, Oentlemen:
REPLY TO NOTICE OF VIOLATION
- E 1xSetCr10x atrOar uO. so-483/98oo6 CALLAWAY PLANT UNION ELECTRIC C This responds to Mr. Arthur Howell's letter dated April 22,1998, which transmitted two Notices of Violation for events discussed in Inspection Report 50-483/98006. Our response to these violations is presented in the attachmen None of the material in the response is considered proprietary by Union Electri If you have any questions regarding this response, or if additional information is required, please let me kno Very truly yours, J. V. Laux Manager, Quality Assurance JVIJtmw Attachment: 1) Response to Violations
.
cif- (454
. .~a., .u c--.
, __ _
-_ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _
.
.
. ..
- ULNRC-3815 May 22,1998
!
Page 2-l cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman,MO 65077 Ms. Kristine M. Thomas (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street Washington,DC 20037
.
Manager, Plant Support Wolf Creek Nuclear Operating Corporation PO Box 411 Burlington,KS 66839
-_:- _
._ __ _ .-____ _ ____ _ ________ ____- _ - _ - _ _ _ _ _ _ _ - _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _
.
-
t
., .
Attachment to ULNRC-3815 l
May 22,1998 Page1 Statement of Violation During an NRC inspection conducted on March 24-26,1998, two violations ofNRC requirements were identified. In accordance with the " General Statement ofPolicy and
'
Procedure for NRC Enforcement Actions," NUREG-1600, the violations are listed below: CFR 50.54(q) requires licensees to follow and maintain in effect an emergency plan which meets the standards in 50.47(b) and the requirements of Appendix E to Part 50. Licensees are permitted to make changes to the plan without Commission approval only if the changes do not decrease the effectiveness of the plan and the plan, as changed, continues to mer.t 50.47(b) planning standards and Appendix E requirement CFR 50.47(b)(2) requires, in part, that the onsite emergency response plan
- must meet the standard of providing that adequate staffing for initial facilit accident response in key functional areas be maintained at all times, and timely augmen'tation of response capabilities is availabl Contrary to these requirements, on May 29,1997, the licensee made changes to its l emergency plan, without Commission approval, that decreased the effectiveness of the plan and did not continue to meet Planning Standard 50.47(b)(2). Specifically, augmentation capabilities were reduced as follows:
(1) The response goal for a dedicated communicator position was changed from 30-45 minutes to 60 minutes, (2) The response goal for the position that performs core thermal hydraulics assessment (technical assessment coordinator) was changed from 30-45 minutes to 60 minute (3) The response goal for the health physics coordinator, who directs assessment of onsite radiological conditions and support activities, including protective measures, was changed from 30-45 minutes to 90 minute (4). The response goal for the operations support coordinator, who forms, directs, coordinates, and briefs inplant teams, was changed from 60-75
)
minutes to 90 minute q i
i
__ ._ i
.
..
.
Attachment to ULNRC-3815 i
May 22,1998 Page 2 (5) The response goal for the emergency team coordinator, who directs inplant i team formation and performs team briefings, dispatch, and tracking, was changed from 60-75 minutes to 90 minute (6) The response goal for six radiation / chemistry technicians was changed from 30-45 minutes to 90 minutes. The response goal for six other radiation / chemistry technicians was changed from 60-75 minutes to 90 minute (7) The response goals for the chemistry coordinator, who directs primary and secondary chemistry activities and evaluates chemical conditions, was changed from 60-75 minutes to 90 minute (8) The response goal for one mechanic was changed from 60-75 minutes to 90 minute (9) The response goal for the electrician was changed from 30-45 minutes to 90 minute (10) The response goal for one instrumentation and control technician was changed from 60-75 minutes to 90 minute (11) The response goal for the emergency operations facility communicators was changed from 60-75 minutes to 90 minute (12) The response goal for the technical support center engineering staff was changed from 60-75 minutes to 90 minute (13) The response goal for the security coordinator was changed from 60-75
,
minutes to 90 minute (14) The response goals for the joint public information center coordinator, administrator, editor, and media host were changed from 2 to 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> This is a Severity Level IV violation (Supplement VIII)(50-483/98006-01).
__
.
I
.
Attachment to ULNRC-3815 May 22,1998 Page 3 Reason for the Violation l In May of 1997, Union Electric personnel made substantial changes to the emergency
!
response plan. In reviewing the plan changes under the 10 CFR 50.54(q) process, it was determined that the aggregate of the plan changes did not decrease the effectiveness of the plan. The 10 CFR 50.54(q) analysis for the RERP, Revision 21, was flawed in that the personnel involved with the analysis only considered overall RERP effectiveness and did not consider each individual part of the change as a change potentially requiring prior NRC approval. Procedures governing the evaluation process did not provide adequate guidance to insure that plan changes requiring prior NRC approval were identifie Corrective Steps Taken and Results Achieved:
Based upon the results of the NRC reactive inspection conducted March 24-26,1998, a change notice to the radiological emergency response plan was issued that revised the response goals back to the previously approved radiological emergency response pla This was implemented on March 30,199 Revision 22 to the radiological emergency response plan was generated for NRC review l and approval, and a meeting was held at NRR to discuss the plan changes on April 2,1998. Since Revision 22 is considered a potential decrease in effectiveness, Chapter 5 has been submitted for Commission revie An interim response organization was established and trained to ensure the previously approved response goals for augmentation would be me Corrective Steps to Avoid Further Violations:
An outside consultant has conducted an independent review of our administrative procedures for radiological emt.rgency response plan chrnges. This review found that existing procedures address the methodology for making changes to the emergency response plan but those procedures should be enhanced to improve the evaluation proces Procedures governing RERP changes will be revised to provide additional guidance to identify changes requiring prior NRC approva Emergency Preparedness staff and related plant management responsible for making !
changes to the radiological emergency response plan will be provided training on application of the 10 CFR 50.54(q) regulations in the plan review / revision proces I
.
.
-
.
'
Attachment to .
ULNRC-3815 May 22,1998 ~
Page 4 Date when Full Compliance was Achieved:
l Full compliance of the Callaway RERP with 10 CFR 50.54(q),10 CFR 50.47(b)(2), and 10 CFR 50, Appendix E was achieved on March 30,1998. All remaining actions listed above will be completed by June 26,199 .
'
' .-
m.-._.-___.__'_d',__:.. _ __
I ,
.
Attachment to ULNRC-3815 May 22,1998 Page 5 Statement of Violation During an NRC inspection conducted on March 24-26,1998, two violations ofNRC requirements were identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violations are listed below: CFR 50.54(q) requires licensees to follow and maintain in effect an emergency plan which meets the standards in 50.47(b) and the requirements of Appendix E to Part 50. Licensees are permitted to make changes to the plan without Commission approval only if the changes do not decrease the effectiveness of the plan and the plan, as changed, continues to meet 50.47(b) planning standards and Appendix E requirement Contrary to the above, on May 29,1997, the licensee made changes to its emergency plan, without Commission approval, that decreased the effectiveness of the plan. Specifically, the requirement to collect and analyze offsite sample media (solid, liquid, gas) was deleted from the description of the radiological monitoring drill. This resulted in a reduction in field monitoring team training requirement This is a Severity Level IV violation (Supplement VIII)(50-483/98006-02).
Reason for the Violation Union Electric Emergency Preparedness staff met with the Missouri State Emergency Management Agency (SEMA) and Department of Health, to discuss the responsibilities for environmental sampling. In the State of Missouri Radiological Emergency Response Plan, environmental sampling is the responsibility of the Department of Health. Based upon the State performing environmental sampling, Union Electric personnel determined that there was no reduction in effectiveness of the emergency plan for this item. The 10 CFR 50.54(q) analysis for this RERP revision was flawed in that this was a reduction in effectiveness of Union Electric's capabilit Corrective Steps Taken and Results Achieved:
Based upon the results of the NRC reactive inspection conducted March 24-26,1998, a j change notice to the radiological emergency response plan was issued that revised the environmental sampling requirement back to the previously approved radiological emergency response plan. Procedures were revised and training was verified current for field monitoring teams. This was implemented on March 30,199 l l
__ _ _ _
.
-
.
'
,
~
Attachment to ULNRC-3815 May 22,1998 Page 6 Corrective Steos to Avoid Further Violations:
An outside consultant has conducted an independent review of our administrative procedures for radiological emergency response plan changes. This review found that existing procedures address the methodology for making changes to the emergency response plan but those procedures should be enhanced to improve the evaluation proces Procedures governing RERP changes will be revised to provide additional guidance to identify changes requiring prior NRC approva Emergency Preparedness staff and related plant management responsible for making
< changes toh t e ra o ogil dil ca emergency response plan will be provided training on application of the 10 CFR 50.54(q) regulations in the plan review / revision proces Date when Full Compliance was Achieved:
Full compliance of the Callaway RERP with 10 CFR 50.54(q),10 CFR 50.47(b)(2), and 10 CFR 50, Appendix E was achieved on March 30,1998. All remaining actions listed above will be completed by June 26,1998.
!