ML20204E367

From kanterella
Jump to navigation Jump to search
Informs That During 990128 Telcon Between D Lantz & H Bundy, Arrangements Were Made for Administration of Retake Written Operator Licensing Exam at Plant,During Wk of 990419
ML20204E367
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/18/1999
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
References
50-483-99-302, NUDOCS 9903250011
Download: ML20204E367 (4)


Text

.

  1. t*"'% UNITED STATES k

y NUCLEAR REGULATORY COMMISSION b f REGloN IV i 611 RYAN PLAZA drive, sulTE 400 l

ARUNGTON, TEXAS 76011-8064 gg March 18,1999 Garry L Randolph, Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, Missouri 65251

SUBJECT:

NRC INSPECTION REPORT 50-483/99-302 In a telephone conversation on January 28,1999, between David Lantz, Operating Supentisor, and Howard Bundy, Chief Examiner, arrangements were made for the adminit,tration of a retake written operator licensing examination at Callaway Plant, during the, week of April 19,1999.

As agreed during the telephone conversation, your staff will prepare the examination based on the guidelines in Revision 8, of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examination is administered.

We have already received and approved your outline and per your telephone messages are expecting to receive the draft examination this week. We will review your draft examination and provide any comments to Mr. Lantz no later than April 5,1999.

We expect you to proctor administration of the examination at your facility in accordance with instructions provided by the chief examiner and further discussed below. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit the preliminary reactor operator license application (Office of Management and Budget (OMB) approval number 3150- k, 0090), medical certification (OMB apprount number 3150-0024), and waiver request (if any) I (OMB approval number 3150-0090) ui ast 30 days before the examination date, if the )

application is not received at least 30 days before the examination date, a postponement may be necessary. The signed application certifying that all training has been completed should be submitted at least 14 days before the examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995(44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30,2000.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, wiiting the examination, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

9903250011 990318 PDR ADOCK 05000483 V PDR l

C  !

nY Union Electric Company Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1 @NRC. GOV; and to the Desk Officer, Office of information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Lantz has been advised of tha policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Howard Bundy at (817)860-8172, or John Pellet at (817)860-8159.

Sincerely, John L. Pellet, Chief Operations Branch Division of Reactor Safety Docket No.: 50-483 License No.: NPF-30 cc:

Richard Neil, Shift Supervisor for Training

- Union Electric Company P.O. Box 620 Fulton, Missouri 65251 Professional Nuclear Consulting, Inc.

19041 Raines Drive Derwood, Maryland 20855 John O'Neill, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.

Washington, D.C. 20037 H. D. Bono, Supervising Engineer Quality Assurance Regulatory Support  !

Union Electric Company P.O. Box 620 Fulton, Missour: 65251 l

k l

w Union Electric Company Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, Missouri 65102

{

Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 i

Otto L. Maynard, President and i Chief Executive Officer '

Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839 Dan 1. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment i I

6267 Delmar Boulevard University Cty, Missouri 63130 I

Lee Fritz, Presiding Commissioner l Callaway County Court House 10 East Fifth Street Fulton, Missouri 65151 Alan C. Passwater, Manager Licensing and Fuels AmerenUE One Ameren Plaza 1901 Chouteau Avenue P.O. Box 66149 St. Louis, Missouri 63166-6149 J. V. Laux, Manager Quality Assurance Union Electric Company P.O. Box 620 Fulton, Missouri 65251 Jerry Uhlmann, Director -

State Emergency Management Agency P.O. Box 116 Jefferson City, Missouri 65101

7-o.

Union Electric Company -4

[6dc to DCd ( 01)(IE42)'

bec distrib. RIV:

Regional Administrator Resident' inspector DRP Director DRS-PSB DRS Director MIS System Branch Chief (DRP/B) RIV File Project Engineer (DRP/B) L. Hurley Branch Chief (DRP/TSS)

I

' DOCUMENT NAME: R:\_CW\CW9302lt.hfb To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with onclosures "N" = No copy RIV:RE:OB E C:0B # l l l '

HBundy/imb WO JPellet 9ff 03/i199 03(7/99 OFFICIAL RECORD COPY l

240208 t .-