ML20195H097
| ML20195H097 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/14/1999 |
| From: | Mel Gray NRC (Affiliation Not Assigned) |
| To: | Joseph Kelly FRAMATOME |
| References | |
| NUDOCS 9906160272 | |
| Download: ML20195H097 (4) | |
Text
^
~~ ^
~
~ ~ ~ ~
ts:
UNITED STATES
.p 4
3
]
NUCLEAR REGULATORY COMMISSION
. WASHINGTON, D.C. 30086 0001 June 14,1999 Mr. Joseph J. Kelly Manager, B&W Owners Group Services Framatome Technologies, Inc P.O. Box 10935 Lynchburg, VA 24506-0935
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FRAMATOME TECHNOLOGIES, INC.
Dear Mr. Kelly:
By letter dated April 7,1999, Union Electric Company (UE) provided additional information to the NRC staff. The additional information pertains to UE's application for amendment to allow the installation of Framatome Electrosleeves in the Callaway Plant for two operating cycles. In their letter, UE provided information prepared by Framatome Technologies, Inc. (FTI), entitled
" Thermal Stability Assessment - Electrosleeved Tubes." In their letter, UE indicated that FTl 3
considered this information to be proprietary to FTI.
The UE submittal also included an affidavit dated April 5,1999, executed by you, for Framatome Technologies. Inc. which requested that this document be withheld from public disclosure pursuant to 10 0FR 2.790. ~ Since FTl determined that all of the information is proprietary, a non-proprietary version was not provided for placement in the public document room.
i The affidavit stated that the document entitled " Thermal Stability Assessment - Electrosleeved Tubes," should be considered exempt from mandatory public disclosure for the following reasons:
"b. The information reveals data or material concoming FTl research or development
)
plans or programs of present or potential competitive advantage to FTI.
j
- d. The information consists of test data or other similar data concerning a process, method or component, the application of which results in a competitive advantage to FTI.
- e. The information reveals special aspects of a process, method, component, or the
()
like, the exclusive use of which results in a competitive advantage to FTI."
}(
' We have reviewed your application and the materialin accordance with the requirements of 10 CFR 2.790 and, on the bar,is of your statements, have determined that the submitted
. information cought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the FTl document entitled " Thermal Stability Assessment - Electrosleeved Tubes,"
and marked as proprietary, will be withheld from the public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
9906160272 990614 f
(
DR ADOCK 0500 3
ii e
June-14, 1999 J. Kelly ' Withholding from public inspection shall not affect the right, if any, of persons properly and
- directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to rsview
' this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure, if you have any questions, please contact me at (301) 415-3021.
Sincerely, 0 RIG. SIGNED.BY Mel Gray, Project Manager, Section 2 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483-cc: See next page
'l DISTRIBUTION SeekstFMW MGray.
DGraves, RGN-IV PUBLIC EPeyton TSullivan PDIV-2 Reading
.OGC-SRichards (clo)
ACRS OGCS b OFFICE PDIV-2/PM PDIV-2/LA '
EMCB/BC PDIV-2/SC NG b -
EN TSullivan k MPSiemien SDembe f f NAME DATE C '/ 7 /99 6/ T /99' b ' /O /99
/
/99 6 /[f/9 C9FICIAL RECORD COPY DOCUMENT NAME: G:\\PDIV-2\\Callaway\\ pro 3954a.wpd w.
J. Kelly Withholding from public inspection shall not affect the right, if any, of persons properly and directly concemed to inspect the documents; if the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this informatien from public inspection should change in the future such that the information could then be made available for public inspection, you should piomptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-3021.
Sincerely, hd Mel Gray, Project Manager, Section 2 Project Directorate IV & Decommissioning j
Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page
s 4
Callaway Plant, Unit 1 cc:
Professional Nucioar Mr. Otto L. Maynard Consulting, Inc.
President and Chief Executive Officer 19041 Raines Drive Wolf Creek Nuclear Operating Corporation Denwood, Maryland 20855 Post Office Box 411 Burlington, Kansas 66839 John O'Neill, Esq.
Shaw, Pittman, Potts & Trowbridge Mr. Dan 1. Bolpf, President 2300 N. Street, N.W.
Kay Drey, Representative Washington, D.C. 20037 Board of Directors Coalition for the Environment Mr. H. D. Bono 6267 Delmar Boulevard Supervising Engineer -
University City, Missouri 63130 Quality Assurance Regulatory Support Union Electric Company Mr. Lee Fritz Post Office Box 620 Presiding Commissioner Fulton, Missouri 65251 Callaway County Court House 10 East Fi.i Street U.S. Nuclear Regulatory Commission Fulton, Missouri 65151 Resident inspector Office 8201 NRC Road Mr. Alan C. Passwater, Manager Steedman, Missouri 65077-1302 Licensing and Fuels Union Electric Company Mr. J. V. Laux, Manager Post Office Box 66149 Quality Assurance St. Louis, Missouri 63166-6149 Union Electric Company Post Office Box 620 Mr. Garry L. Randolph Fulton, Missouri 65251 Vice President and Chief Nuclear Officer Union Electne Company Manager-Electric Department Post Office Box 620 Missouri Public Service Commission Fulton, MO 65251 301 W. High Post Office Box 360 Jefferson City, Missouri 65102 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 L