ML20207A413

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-483/99-03 on 990321-0501.One Violation of NRC Requirements Identified & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy
ML20207A413
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/19/1999
From: Graves D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
Shared Package
ML20207A417 List:
References
50-483-99-03, 50-483-99-3, NUDOCS 9905260314
Download: ML20207A413 (5)


See also: IR 05000483/1999003

Text

I

    • "' C o ,

UNITED STATES

e

I

t

NUCLEAR REGULATORY COMMISSION

e

7,

E

1

=

REGloN Iv

$

,t>

611 RYAN PLAZA DRIVE, sulTE 400

4 ,,l

ARLINGTON, TEXAS 76011-8064

g

MAY I 91999

Garry L. Randolph, Vice President and

Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, Missouri 6525i

SUBJECT: NRC INSPECTION REPORT NO. 50-483/99-03

Dear Mr. Randolph:

This refers to the inspection conducted on March 21 through May 1,1999, at the Callaway

Plant facility. The enclosed report presents the results of this inspection.

{

t

Based on the results of this inspection, the NRC has determined that one violation of NRC

requirements occurred. The violation is being treated as a noncited violation (NCV), consistent

with Appendix C of the Enforcement Policy. The NCV is described in the subject inspection

report. If you contest the violation or severity level of the NCV, you should provide a response

within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with

copies to the Regional Administrator, Region IV, and the Director, Office of Enforcement,

United States Nuclear Regulatory Commission, Washington, DC 20555-0001.

f

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC Public Document Room.

1

'

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

I L[

/

David N. Graves, Chief

'

Project Branch B

Division of Reactor Projects

Docket No.:

50-483

License No.: NPF-30

Enclosure:

NRC Inspection Report No.

50-483/99-03

9905260314 990519

T

PDR

ADOCK 05000483

G

PDR

m

'e

.

Union Electric Company

.-2 .

cc w/ enclosure:

Professional Nuclear Consulting, Inc.

19041 Raines Drive

Derwood, Maryland 20855

~ John O'Neill, Esq.-

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, N.W.

Washington, D.C. 20037

i

H. D. Bono, Supervising Engineer

Quality Assurance Regulatory Support

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

'

Manager - Electric Department .

Missouri Public Service Commission

301 W. High

P.O. Box 360

~ Jefferson City, Missouri 65102

_

. Ronald A. Kucera, Deputy Director

Department of Natural Resources

P.O. Box 176

LJefferson City, Missouri '65102

Otto L Maynard, President and

Chief Executive Officer.

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, Kansas 66839

Dan I. Bolef, President

Kay Drey, Representative

Board of Directors Coalition

for the Environment-

6267 Delmar Boulevard

^ University City, Missouri 63130

Lee Fritz, Presiding Commissioner ~

,

Callaway County Court House '

'

10 East Fifth Street

Fulton, Missouri 65151

i

4

~

.

,.

.

' Union Electric Company

-3-

Alan C. Passwater, Manager

Licensing and Fuels

AmerenUE-

One Ameren Plaza

1901 Chouteau Avenue

P.O. Box 66149

St. Louis, Missouri 63166-6149

J. V. Laux, Manager

Quality Assurance .

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

Jerry Uhlmann, Director

State Emergency Management Agency

P.O. Box 116

Jefferson City, Missouri 65101

1.

-

1-

!

l

b

7

.

l

.

'

Union Electric Company

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

DRS Director

MIS System

Branch Chief (DRP/B)

RIV File

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

l

l

l

DOCUMENT NAME: R:\\_CW\\CW903RP.DGP

l

To receive copy of document, Indicate 10 box: "C" = Copy without enclosures *E" = Copy with enclosures 'N" = No copy

RIV: SRI

4'

RI W\\1v

C:DRP/B

DGPassehlf(

JDHanna

DNGravestPO

,

'

5/d /99

5/W /99

5/ % /99

i

7

OFFICIAL RECORD COPY

L

!

./ I
4

. Union Electric Company-

-4-

E-Mail report to T. Frye {TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator'

Resident inspector

DRP Director

DRS-PSB

DRS Director

MIS System

Branch Chief (DRP/B)

RIV File

Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

\\

\\

,

DOCUMENT NAME: R:\\_CW\\CW903RP.DGP

To receive copy of document, indicate lo box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV: SRI

b)

RI T 'W

C:DRP/B

DGPassehl Y

JDHanna

DNGravesV)

k

'

5/ n /99

5/d /99

5/gk /99

i

OFFICIAL RECORD COPY

(4 f^

pAY

260031