ML20207A413
| ML20207A413 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/19/1999 |
| From: | Graves D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Randolph G UNION ELECTRIC CO. |
| Shared Package | |
| ML20207A417 | List: |
| References | |
| 50-483-99-03, 50-483-99-3, NUDOCS 9905260314 | |
| Download: ML20207A413 (5) | |
See also: IR 05000483/1999003
Text
I
- "' C o ,
UNITED STATES
e
I
t
NUCLEAR REGULATORY COMMISSION
e
7,
E
1
=
REGloN Iv
$
,t>
611 RYAN PLAZA DRIVE, sulTE 400
4 ,,l
ARLINGTON, TEXAS 76011-8064
g
MAY I 91999
Garry L. Randolph, Vice President and
Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, Missouri 6525i
SUBJECT: NRC INSPECTION REPORT NO. 50-483/99-03
Dear Mr. Randolph:
This refers to the inspection conducted on March 21 through May 1,1999, at the Callaway
Plant facility. The enclosed report presents the results of this inspection.
{
t
Based on the results of this inspection, the NRC has determined that one violation of NRC
requirements occurred. The violation is being treated as a noncited violation (NCV), consistent
with Appendix C of the Enforcement Policy. The NCV is described in the subject inspection
report. If you contest the violation or severity level of the NCV, you should provide a response
within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with
copies to the Regional Administrator, Region IV, and the Director, Office of Enforcement,
United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
f
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response will be placed in the NRC Public Document Room.
1
'
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
I L[
/
David N. Graves, Chief
'
Project Branch B
Division of Reactor Projects
Docket No.:
50-483
License No.: NPF-30
Enclosure:
NRC Inspection Report No.
50-483/99-03
9905260314 990519
T
ADOCK 05000483
G
m
'e
.
Union Electric Company
.-2 .
cc w/ enclosure:
Professional Nuclear Consulting, Inc.
19041 Raines Drive
Derwood, Maryland 20855
~ John O'Neill, Esq.-
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, N.W.
Washington, D.C. 20037
i
H. D. Bono, Supervising Engineer
Quality Assurance Regulatory Support
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
'
Manager - Electric Department .
Missouri Public Service Commission
301 W. High
P.O. Box 360
~ Jefferson City, Missouri 65102
_
. Ronald A. Kucera, Deputy Director
Department of Natural Resources
P.O. Box 176
LJefferson City, Missouri '65102
Otto L Maynard, President and
Chief Executive Officer.
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, Kansas 66839
Dan I. Bolef, President
Kay Drey, Representative
Board of Directors Coalition
for the Environment-
6267 Delmar Boulevard
^ University City, Missouri 63130
Lee Fritz, Presiding Commissioner ~
,
Callaway County Court House '
'
10 East Fifth Street
Fulton, Missouri 65151
i
- 4
~
.
,.
.
' Union Electric Company
-3-
Alan C. Passwater, Manager
Licensing and Fuels
AmerenUE-
One Ameren Plaza
1901 Chouteau Avenue
P.O. Box 66149
St. Louis, Missouri 63166-6149
J. V. Laux, Manager
Quality Assurance .
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
Jerry Uhlmann, Director
State Emergency Management Agency
P.O. Box 116
Jefferson City, Missouri 65101
1.
-
1-
!
l
b
7
.
l
.
'
Union Electric Company
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
l
l
l
DOCUMENT NAME: R:\\_CW\\CW903RP.DGP
l
To receive copy of document, Indicate 10 box: "C" = Copy without enclosures *E" = Copy with enclosures 'N" = No copy
RIV: SRI
4'
RI W\\1v
C:DRP/B
DGPassehlf(
JDHanna
DNGravestPO
,
'
5/d /99
5/W /99
5/ % /99
i
7
OFFICIAL RECORD COPY
L
!
- ./ I
- 4
. Union Electric Company-
-4-
E-Mail report to T. Frye {TJF)
E-Mail report to D. Lange (DJL)
- E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator'
Resident inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
\\
\\
,
DOCUMENT NAME: R:\\_CW\\CW903RP.DGP
To receive copy of document, indicate lo box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV: SRI
b)
RI T 'W
C:DRP/B
DGPassehl Y
JDHanna
DNGravesV)
k
'
5/ n /99
5/d /99
5/gk /99
i
OFFICIAL RECORD COPY
(4 f^
pAY
260031