Discusses Plans to Sponsor Testing of Electrosleeved Tubes to Better Understand Behavior of Electrosleeve Matl Under Severe Accident Conditions
ML20205S257
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/19/1999
From: Mel Gray
NRC (Affiliation Not Assigned)
To: Galford J
FRAMATOME
References
NUDOCS 9904260157
Download: ML20205S257 (4)


Text

m 3

,. ^s April 19, 1999 Mr. James E. Galford Framatome. Technologies, Inc 155 Mill Ridge Road Lynchburg, VA - 24502-4341

SUBJECT:

REQUEST FOR ELECTROSLEEVE INSTALLATION IN SAMPLE TUBES

Dear Mr. Galford:

The NRC staff is reviewing an amendment application by Union Electric Company that would approve the Electrosleeve repair method for Callaway Plant, Unit 1 for two operating cycles. As part of this revied, the staff has been evaluating the behavior cf an Electrosleeve repaired i steam generator tube during severe accident conditions. To further support these evaluations, the staff is planning to sponsor testing of Electrosleeved tubes to better understand the behavior of the Electrosleeve material under severe accident conditions. The type of tests the i sleeved tubes would be subjected to have not been finalized. The testing would be performed by Argonne National Laboratories (ANL) under a contract with the NRC.

The staff proposes to have ANL provide to Framatome Technologies, Incorporated (FTI),

sixteen (16) unflawed 7/8-inch steam generator tubes of a length appropriate for the ANL test equipment. The staff requests that FTl install a four-inch Electrosleeve in the center of each of

' these tubes in accordance with your field implementation procedures. Dr. Joseph Muscara of the NRC's Office of Nuclear Regulatcry Research, telephone number (301) 415-5844, will be the contact to arrange to have ANL ship you the sixteen unflawed tubes.

Prior to releasing the ANL test results to the public docket, the NRC staff will provide a copy to FTI, and ask that FTl review the results for information considered proprietary to FTI. The NRC  !

staff will consider your response prior,to release of the test results to the public docket.

Please contact me at (301) 415-3021 to confirm your participation in this matter.

Sincerely, Original signed by:

Mel Gray, Project Manager, Section 2 Project Directorate IV & Decommissioning ,

Division of Licensing Project Management  !

Office of Nuclear Reactor Regulation Docket No. 50-483 DISTRIBUTION:

Docket EPeyton cc: See next page PUBLIC CBeardslee PDIV-2 R/F ACRS JZwolinski/SBlack DGraves, RIV j

SRichards xBrockman, RIV D 220090 TSuiiivan. JMuscara, RES MGray OGC , g-

- DOCUMENT NAME: LTRA3954.WPD OFC PDIV-2/PM PDIV-2/LA NRR:DRSl3 PDIV-2/SC NAME Mb t-/eNM SDembek p.n DATE 4//6/99 4/I4>/99 -4/$/99~- 4/Y/99 OFFICIAL RECORD COPY 9904260157 Y90419 POR P

A00CK OS000483 h b hhh $h PR _

u.. .- _ .. . - .

. b April 19, 1999 Mr. James E. Galford Framatome Technologies, Inc 155 Mill Ridge Road Lynchburg, VA 24502-4341

SUBJECT:

REQUEST FOR ELECTROSLEEVE INSTALLATION IN SAMPLE TUBES

Dear Mr. Galford:

The NRC staff is reviewing an amendment application by Union Electric Company that would approve the Electrosleeve repair method for Callaway Plant, Unit i for two operating cycles. As part of this review, the staff has been evaluating the behavior of an Electrosleeve repaired steam generator tube during severe accident conditions. To further support these evaluations, the staff is planning to sponsor testing of Electrosleeved tubes to better understand the behavior of the Electrosleeve material under severe accident conditions. The type of tests the sleeved tubes would be subjected to have not been finalized. The testing would be performed by Argonne National Laboratories (ANL) under a contract with the NRC.

The staff proposes to have ANL provide to Framatome Technologies, incorporated (FTI),

sixteen (16) unflawed 7/8-inch steam generator tubes of a length appropriate for the ANL test equipment. The staff requests that FTl install a four-inch Electrosleeve in the center of each of these tubes in accordance with your field implementation procedures. Dr. Joseph Muscara of the NRC's Office of Nuclear Regulatory Research, telephone number (301) 415-5844, will be the contact to arrange to have ANL ship you the sixteen unflawed tubes.

Prior to releasing the ANL test results to the public docket, the NRC staff will provide a copy to FTl, and ask that FTl review the results for information considered proprietary to FTI. The NRC staff will consider your response prior,to release of the test results to the public docket.

Please contact me at (301) 415-3021 to confirm your participation in this matter.

Sincerely, ,

Original signed by: '

Mel Gray, Project Manager, Section 2 Project Directorate IV & Decommissioning ,

Division of Licensing Project Management l Office of Nuclear Reactor Regulation Docket No. 50-483 DISTRIBUTION: '

Docket EPeyton cc: See next page PUBLIC CBeardslee PDIV-2 R/F ACRS JZwolinski/SBlack DGraves, RIV SRichards KBrockman, RIV TSullivan JMuscara, RES MGray OGC  ;

DOCUMENT NAME: LTRA3954.WPD OFC PolV-2/PM PDIV 2/LA NJ4R:ElRSlil PDIV-2/SC NAME MM E/e2N N SDembek/)

/m DATE 4//6/99 4/lb/99 4//k/99- 4/ /99 OFFICIAL RECORD COPY

m p 'g UNITED STATES

, g g NUCLEAR REGULATORY COMMISSION o, f WASHINGTON, D.C. 20066-0001

'% o

.....s April 19, 1999 Mr. James E. Galford Framatome Technologies, Inc 155 Mili Ridge Road Lynchburg, VA 24502-4341

SUBJECT:

REQUEST FOR ELECTROSLEEVE INSTALLATION IN SAMPLE TUBES

Dear Mr. Galford:

The NRC staff is reviewing an amendment application by Union Electric Company that would approve the Electrosteeve repair method for Callaway Plant, Unit 1 for two operating cycles. As part of this review, the staff has been evaluating the behavior of an Electrosleeve repaired steain generator tube during severe accident conditions. To further support these evaluations, i the staff is planning to sponsor testing of Electrosteeved tubes to better understand the l behavier of the Electrosleeve material under severe accident conditions. The type of tests the sleeved tubes would be subjected to have not been finalized. The testing would be performed ,

by Argonne National Laboratories (ANL) under a contract with the NRC. '

The staff proposes to have ANL provide to Framatome Technologies, incorporated (FTI),

sixteen (16) unflawed 7/8-inch steam generator tubes of a length appropriate for the ANL test l equipment. The staff requests that FTl install a four-inch Electrosfeeve in the center of each of these tubes in accordance with your field implementation procedures. Dr. Joseph Muscara of l the NRC's Office of Nuclear Regulatory Research, telephone number (301) 415-5844, will be the contact to arrange to have ANL ship you the sixteen unflawed tubes.

F*ior to releasing the ANL test results to the public docket, the NRC staff will provide a copy to FTI, and ask that FTl review the results for information considered proprietary to FTI. The NRC staff will consider your response prior to release of the test results to the public docket.

Please contact me at (301) 415-3021 to confirm your participation in this matter.

Sincerely, h J Mel Gray, Project Manager, Section 2 Project Directorate IV & Decommissioning Division of Licensing Project Management

. Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page

r Callaway Plant, Unit 1 cc:

Professional Nuclear Mr. Otto L. Maynard Consulting, Inc. President and Chief Executive Officer 19041 Raines Drive Wolf Creek Nuclear Operating Corporation ,

Derwood, Maryland 20855 Post Office Box 411 1 Burlington, Kansas 66839 John O'Neill, Esq.

Shaw, Pittman, Potts & Trowbridge Mr. Dan I. Bolef, President 2300 N. Street, N.W. Kay Drey, Representative Washington, D.C. 20037 Board of Directors Coalition for the Environment Mr. H. D. Bono 6267 Delmar Boulevard l Supervising Engineer University City, Missouri 63130 Quality Assurance Regulatory Support Union Electric Company Mr. Lee Fritz Post Office Box 620 Presiding Commissioner Fulton, Missouri 65251 Callaway County Court House 10 East Fifth Street U.S. Nuclear Regulatory e ammission Fulton, Missouri 65151 Resident inspector Office 8201 NRC Road Mr. Alan C. Passwater, Manager Steedman, Missouri 65077-1302 Licensing and Fuels Union Electric Company Mr. J. V. Laux, Manager Post Office Box 66149 Quality Assurance St. Louis, Missouri 63166-6149 Union Electric Company Post Office Box 620 Mr. Garry L. Randolph '

Fulton, Missouri 65251 Vice President and Chief Nuclear Officer Union Electric Company Manager- Electric Department Post Office Box 620 Missouri Public Service Commission Fulton, Missouri 65251 301 W. High Post Office Box 360 Jefferson City, Missouri 65102 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavilion  ;

611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 .

Jefferson City, Missouri 65102 L .

- - . . _ . _ _